Using these figures calculated peak runoff of volumes for a storm with an Average Recurrance Interval (ARI) of 100yrs are as follows:- Pre Development Qi99 = 41 It/s Post Development Quigg (undetained) = 42.2 It/s Peak Flow Increase = 1.2 It/s Peak flow increases will be minor. The use of infiltration pits and water storage tanks will offset this increase in peak runoff volumes. 4.2.2 MANAGE ALLOTMENT AND CROSS ALLOTMENT FLOWS: From the existing surface contours, runoff from the site travels from the rear of the allotment towards Crank Street. A series of townhouses exists at the rear of the allotment. These drain along a driveway adjacent the common boundary towards Crank Street. This ensures no cross allotment flows occur for the allotment. 4.3 MANAGE WATER DEMAND: A 5000It tank is proposed which will serve WC'’s and External Hose Cocks for irrigation purposes only. The tank are to be fitted with a switchover device which provides mains water supply when the tank volumes dropped to pre-determined levels. 4.4 PROTECT AGAINST FLOODING: Noosa Shire Council's major flood overlay map confirms the allotment is not prone to flooding. 5.0 CONCLUSION: The measures proposed in this report demonstrate that the development can incorporate Water Sensitive Urban Design principles into it’s construction and on-going use. The development will contribute positively to the built environment that will contain it. Sean Richardson RPEQ 5835 For and on behalf of SCG CONSULTING ENGINEERS Attachment: Drawing (No.) 24056 — C4 SCG CONSULTING ENGINEERS 6 SCG Ref: 24056(SWM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU14.0006Related documentApplication case desk ↗
About this file
- File size
- 758 KB (small file)
- File type
No other editions are linked here.