{s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?,
DXNo-Gotoas7 — 1] Yes - Answer (a} and (b) below ~
{a) Are the operations mentioried as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 Cinco ~ DYes
(i) A regulation under the IPA-or the Water Act 2000 CINo §=[D1Yes .
If yes to either or both of {i) or (ii) above - (Complete Form 1, Part Ky). This application requires assessment by the Department of Natural
se Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. -
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 20057 .
ONo (Yes ~ if any part of the proposal relates fo operational work in a high preservation area other than works stated in a wid river
declaration for the area fo be assessable development for which a development application mey be made, the application wit!
be laken to be not properly made and the Assessment Manager must refuse to receive Al other proposals are subject to the
decleration for the relevant wild river area, and assessment. may be required for the purposes of the Wild Rivers Act 2005,
(Complete Farm 1, Part Keif an application is made) - :
IPA schedue 8, ait I, table 4, Zan Xcj{i P Regualon, schedule 2 tah¥e 2 dem 6; IP Reawalion, schedule 1. pait 3. table 4, lem 3 Weles Act 2000, section 9664 jwitd river area), Wid
Rivers Act 2005, secticn 434; ralevant whd river doctaraiica; Wid Rivers Coca
47
's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water {other than using a water truck to pump water)?” 2
PRNo-Gotcors = Yes . .
If yes, are the operations mentioned as assessable development in the following?
(iY A water resource plan under the Water Act 2000 [No DYes
(ii) A regulation under the IPA or the Water Act 2000 [no =(lYes
>. > : .
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kj) This application requires assessment by the Department of Natural
Resources end Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. . Y
kat schockic 2 tahie 2 fem & iP Regt, sobedtss 1 pact Y taht 4 tem Weter Act KOO. section 3664 (340 diver areaNole. no curert wtct
BA EL ES BOOSTS: BY River cotie into: the arde does not arrertly conlun coplcaie promsions & subartesion wale}
4.8
Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering
with overland flow water (other than using a water truck to pump water)? 7
PSINo-Gotoas9 — (} Yes - Answer both (a) and (b) below .
{a} Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005? : :
O Yes oO
If yes, indicate what the proposed operational work relates to .
(i) Specified works for the area . CINo [1 Yes
(ii) Work state in the relevant wild river declaration tobe _ No CJ Yes
assessable development for which an application may 7
be lodged , :
{f yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kio. Subject fo the declaration for the relevant wild ‘iver area, assessment
may be required for the purposes of the Wild Rivers Act 2005) .
If no to both (i) and (ii) above - the epptication will be taken to be not properly made and the Assessment Manager must refuse to receive it.
LONo .
If no, are the operations.mentioned as assessable development in the following?
(i) A water resource plan under the Water Act 2000. CNo D1 Yes
(i) A regulation under the IPA or the Water Act 2000 [CNo (Yes
tyes to either or both of (i) or (ii) above - (Complete Form 1, Part Kia) This application requies assessment by the Department of Netural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
CINo (71 Yes - (complete Form 1, Part Kis) This application requires assessment by the Department of Natural Resources and Water
. 1 (NRW). if NRW is notthe Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schoriae &. 2: CG EMEA, Schacie 7. indie 2, ent IP Rogdaion shedise 1, nat 3 iable 4, tem JA: Wet Aol 200. section SREB (ants thee area}:
fedoverd wd iver ti - 7 : :
Page 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0928 - Operational Works - Detached House Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.