Council archive · source document
09/0928 - Operational Works - Detached House Driveway [As Published] · 142009.928
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
RDB Ae
Part E
Building &/or operational work assessable against a planning scheme’
SH SOViEO Tear. GS rsnino.
Nature of the works a coe Bach
14. Nature of work that requires assessment against a planning scheme:
Oo Building work - Complete TableA K Operational work - Complete Table 8
Table A
{i) What is the nature of the building work made assessable in the planning scheme? .
L
(ii) Are there any current approvals associated with this application? (e.g. material change of use}
(No Yes ~ Provide details below
List of approval reterence/s Date approved Date approval lapses {if known}
[ 4. "
- |Table B :
(i) What Is the nature of the operational work made assessable in the planning scheme?
TD Roadworks D Stormwater (2 Water infrastructure (1) Clearing vegetation under the planning scheme
s} [Drainage works | (2 Earthworks (1 Sewerage infrastructure
> ,
[Landscaping 7] Signage {1 Other - specity a
(iii) What type of approval is being sought? (NOTE: if you have indicated muttipte operational works in question {i) above’aue/your answers to this question
. would be different for different operational work, it may be more appropriate to provide these delaits in an attachment to this form)
hd Development Permit 1 Pretiminary Approval D1 Both (Specity below)
:
{iv) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
AKI No DYes - Specify.the number of fots being created
(v) Are there any current approvals associated with this application?. (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a fot)
DNo BeI Yes - Complete Table Bia).
Table B(a) . List of approval references Date approved Date approval lapses {if known)
1.
2. Whatis the dollar value of this operational work? (i. the total value including GST, materials and labour} $ D» COO: oO oO
2.
Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement| Method of lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works (inctusing the’ (Confirmed
léxtent of any cid and fil)
OFFICE USE ONLY
Date received . Reference numbers
Advice for completing Part E
General advice
« Part A must also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, uniess. following a response there is a statement to go directly to another question.
Qt | A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
+ This form is atso used for building or operationat work assessable against the land use plan for Caims alrport land or Mackay airport land. Wherever
planning scheme is mentioned, take it to mean the land use plan for the airportland.
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0928 - Operational Works - Detached House Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.