Delegated Report - Code - Planning OPW20 0197 · OPW20/0197

of 1

Text shows just the words. Original shows the document exactly as it was published.

Author	Development Engineer, Diogo Carrico
Development Assessment

APPLICATION DETAILS
Application No.	OPW20/0197
Applicant	SEC Constructions
Proposal	Operational Works – Vehicle Crossover
Properly Made Date	28 October 2020
Information Request Date	Not Applicable
Information Response Date	Not Applicable
Decision Due Date	7 January 2021
Report Completed Date	16 November 2020
Report Reviewed By	Mark Lewis – 12 November 2020
Number of Submissions	Not Applicable

PROPERTY DETAILS
Property Address	69 Maple St Cooroy Qld 4563
RP Description	Lot 4 C 5605
Land Area	1017 m²
Existing Use of Land	Residential

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Locality	Cooroy
Zone	Low Residential
Overlays	Heritage and Character Area (Character Area); Water Resource Catchment; Water Supply Buffer Area
Assessment Type	Code
PROPOSAL
The application seeks approval for Operational Works – Vehicle Crossover.
The proposal plan is included below.

site details
Background
This application follows up on the requirements of development approval MCU20/0033.
Since the site falls towards the back (into 15 & 17 Crystal St) and the approval (MCU20/0033) considered a significant increase in hardstand area, council requested confirmation that the stormwater management of the developed site would not worsen pre-development conditions  – this is demonstrated on a different plan and is to be endorsed through the building approval.
Site Description

Surrounding Land Uses

assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017;
The Noosa Plan.
The following codes from the Noosa Plan are applicable to this development:
Driveways and Carparking Code.
cONSULTATION
Referral Agencies
Not applicable.
Other Referrals
Not applicable.
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW20/0197 for Operational Works – Vehicle Crossover situated at 69 Maple St Cooroy Qld 4563 and described as Lot 4 C 5605, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	OPW20/0197
Street address:	69 Maple St Cooroy Qld 4563
Real property description:	Lot 4 C 5605
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works – Vehicle Crossover
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
30076-OW1	A	Drive Way Levels and Design Prepared by SCG Consulting Engineers (AS ANNOTATED BY COUNCIL)	14/10/2020
CURRENCY PERIOD
The Currency Period for this development approval lapses if the development has not substantially started by 21 November 2022, unless an application to extend the currency period is approved by Council.
SITE SPECIFIC CONDITIONS
Engineering
A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting.
The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works.
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
traffic Management during the construction phase;
appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD);
provision for safe pedestrian access across the frontage of the site both during and outside working hours.
Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works.
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
All works must be constructed and work procedure undertaken in accordance with:
the approved plans/documents and conditions detailed in this Decision Notice;
The relevant conditions of the higher order Material Change of Use approval viz. MCU20/0033to which this approval relates;
all relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines;
the latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
Works within Road Reserves
No removal of street trees is permitted without Council’s prior written approval.
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Driveways
Driveway crossovers must be constructed generally in accordance with council’s Standard Drawings RS-049 and RS-050.
Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established.
The following must be complied with during the construction of the required crossover/driveway:
the driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete;
the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients;
the driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties;
have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council;
any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor;
any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway.
Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer.
Stormwater Drainage
The constructed driveway must not cause additional ponding on the road formation or the road reserve.
Any proposed surface drainage grate must be located wholly within private property.
Environment (Erosion and Sediment Control)
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes).
FOLLOWING CONSTRUCTION
A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required.  Please contact Council on 5329 6245 to arrange for the inspection.
All works (including crossover, driveway, stormwater drainage and channel stabilisation works), must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed generally in accordance with standard drawings RS-049 and RS-050.
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart Inspections Request
Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include:
the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council;
Best Practice Erosion and Sediment Control, International Erosion Control Association (2008)
COVID-19
This development approval has been issued during the COVID-19 applicable event declared under 275F of the Planning Act 2016.
The period for undertaking the approved development may be subject to a further extension of 6 months under section 275R of the Planning Act.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 6 of 8

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image1.png (image text)]
 

 

 

 

 

 

 

 

 

 

   
 
 

em Eins

ENT SECM

   

 

 

 

 

 

 

   

 

   

    

   

 

 

 

 

 

 

 

 

 

 

 

 

 

HEIGHT 947.
wy
\. Ul pn PT, A 1255
a SR eave nea
BBE Z os ny
= Enea
(sd sav sn espe,
Be Seapagn meer 2 BoE ae [Sk OAL
bos see nem ene m sree pe dA Ea
eta — (OME as
a ys san oon see SITE_PLAN — ORIVE WAY DESIGN AND LEVELS ™
er SR Pg Hane ma oes wo LES (co) pay nouueD son oc ory
: Sa
a BEGET, . eae
HR imi200 042 feeas,  [0076- ow]

 

 

 

 

 


[Attachment: image2.png (image text)]
PropertyID 128749
i House
4
y Let 4
A Plan 3605
| j
j Feature Name
Z
|
018.49
Ca Address 69 Maple St, COOROY
collection Monday
day
Al
/ Google (ick on image
\ /
j

[Attachment: image3.png (image text)]
50 @ Zone Maps
CAV Uren Ares Boundary (Fina 2020) (1)

O Ay tocat Pian
0 & Precincs (Final 2020)

 

undary ¢

 

 

©] | Noosa Pian 2020 Zones (Final
Low Density Residential

Medium D

  

sity Re

High Density Residential

 

Tourist Accommodation
I Migjor Centre
MM Districe Centre

il Locel Cer

 

Neighbour

 

cen

 

Low impact industry
Medium impact Industry
Recreation and Open Space
il Environmental Management and Conserve
communi
mm Innovation
purl
i Rural Re:
OD & Overiay Maps
D & Loce! Government infrastructure Pian (LGIP)
DB orner Pen Maps
OD & Superseded 1988
og
DB drake nox

0 8 NBN Nerwork - Connections by technology type July 2020

 

BSESBSSSSESESESEESESESES

 

  

 

<ded 2006 Planning Scheme

1 Plan 2020

   

MBE Coienmmental Dlennine:

Used in these records

About this file

File size
2.8 MB (large file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW20 0197.docx · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.