Original source · versioned page text
Arborist Report inc VMP
Very large file: it may take a few minutes
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Arborist Report 14 Serenity Close, Noosa Heads pressure vacuum excavation, pier and beam, cantilevering or screw piles) and allow for natural air circulation and rainfall to the existing ground surface (e.g. uncovered and spaced timber decks). In these circumstances, the design measures avoid or mitigate the impact of the encroachment to acceptable or tolerable levels. Assessment of development impacts on the trees were carried out in accordance with AS 4970-2009 (Standards Australia 2009). Impacts on the tree were assessed via the preparation of scaled GIS drawings which overlaid the surveyed location of the tree and its associated TPZ and SRZ with the proposed extent of development works. 10 | 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.