Original source · versioned page text
Arborist Report inc VMP
Very large file: it may take a few minutes
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Arborist Report 14 Serenity Close, Noosa Heads 6 VEGETATION MANAGEMENT This section of the plan sets outs tree protection measures for retained trees, including: i. Detailed design, ii. Pre-construction and clearing management measures, iii. Demolition, iv. Construction measures, v. Compliance measures, and, vi. Post-construction management measures. The purpose of the measures is to minimise development impacts on the trees. Proposed tree retention procedures have been prepared in accordance with Australian Standard AS 4970-2009 Protection of trees on development sites (Standards Australia 2009) and current best practice. The nominated measures can be conditioned as part of a permit and implemented as part of the demolition and construction stages to maintain the long-term viability of the tree. 6.1 DETAILED DESIGN The design of the overall development footprint was modified to avoid and minimise impacts to adjacent trees. Notwithstanding, further detailed design is necessary to obtain future operational works and building approvals. As part of these stages, detailed design should review and consider: ● Detailed location of ground protection measures. ● Allowance for use of low-pressure vacuum excavation, pier and beam, cantilevering or screw piles. ● Allowance for natural air circulation and rainfall to the existing ground surface (e.g., uncovered and spaced timber decks). ● Sheet piling detail to avoid encroachment from batters associated with basement or footing excavation (Refer to VMP03a and VMP03b), ● The detailed design of the suspended slab and elevated driveway construction from Serenity Close / Banksia Ave (Refer to VMP03a and VMP03b). The abovementioned requirements can be conditioned as part of a development permit. 6.2 PRE-CONSTRUCTION AND CLEARING Pre-construction and clearing management measures for removal and retention of trees are indicated on the VMP (Appendix 1). These recommendations can be conditioned by 14 | 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.