Original source · versioned page text
Arborist Report inc VMP
Very large file: it may take a few minutes
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Arborist Report 14 Serenity Close, Noosa Heads ● Retaining walls are to be constructed with bored piers to avoid impacts to any roots which may be present at the edge of the TPZ. No strip footing is permitted within or directly adjacent the TPZ without prior approval of the Project Arborist. ● Service connections are to be vacuum excavated or hand dug to avoid impacts on large roots. ● TPZ fencing is to be established in accordance with the approved drawings and Australian Standard AS 4970-2009 Protection of trees on development sites (Standards Australia 2009) including: Signage in accordance with AS 1319-1994 Safety signs for the occupational environment, and, Fencing in accordance with AS 4687-2007 Temporary fencing and hoardings. ● If canopy pruning is required, licensed Wildlife Spotter Catcher is to inspect trees to be pruned and identify hollows for retention or salvage. ● Project Arborist to monitor all works which occur within the TPZ of retained tree. ● Where roots are exposed by excavation, temporary root protection is installed to prevent dehydration and root moisture is maintained. ● Where exposed roots require pruning, pruning shall be carried out in accordance with procedures set out in: AS 4970-2009 Protection of trees on development sites, and, AS 4373-2007 Pruning of amenity trees. ● Where recommended by the Project Arborist, carry out remedial works to trees as follows: Decompaction or aeration of the TPZ e.g., via vertical mulching or air spade. Any mechanical aeration of the topsoil layer should be undertaken by a suitability qualified professional and supervised by the Project Arborist. Where required, application of a suitable fertiliser. Where required, additional topsoil is to be provided in accordance with AS 4419:2018 Soils for landscaping and garden use to maintain existing ground levels. Apply 100mm native forest mulch within fenced TPZ area to 100m settled depth. ● If scaffolding is required within TPZ of retained tree, branch removal and ground protection to be established in accordance with procedures set out in: AS 4970-2009 Protection of trees on development sites, and, AS 4373-2007 Pruning of amenity trees. ● Project Arborist to conduct regular inspections to ensure compliance with tree protection measures outlined in the VMP. ● Project Arborist to monitor and assess condition of trees and physical environment throughout construction phase. ● Project Arborist to issue notice of non-compliance to project manager for non- conforming works and any remedial works to ensure compliance. The measures are to be implemented by the developer and their contractors at all times whilst site works are occurring within the curtilage of the retained trees. Compliance with the requirements is to be administered by a Project Arborist (AQF Level 5) with experience in construction supervision. 16 | 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.