Arborist Report
14 Serenity Close, Noosa Heads




 Tree No.     Species            Encroachment       Management recommendations

 149, 152,                                            with AS 4970-2009 Protection of trees on
 154, 162,                                            development sites in consultation with Project Arborist
 174, 184,                                            (Refer to VMP).
 191, 192,
 194, 207,
 216, 217,
 218, 220,
 221, 223,
 225, 226,
 230 and
 233
 104, 105     Various            Connection of a    • Encroachment of 1% is within tolerable amounts;
 and 108                         new stormwater       however, additional construction excavation or
                                 line to existing     laydown areas may be required to facilitate the
                                 manhole (<1% of      connection of the new pipe. To mitigate any further
                                                      impact to the retained trees:
                                 Tree 104 TPZ).
                                                      ˗ Machinery should be located to the west of the
                                                        proposed storm water pipe to avoid compaction of
                                                        TPZ area.
                                                      ˗ Any additional TPZ area impacted as part of the
                                                        works should be examined closely as part of the
                                                        operational works application.
                                                      ˗ Any works within the TPZ area should be done
                                                        under direct supervision of the Project Arborist.




                                                                                                      18 | 25
Log in to download the original file

Arborist Report inc VMP.pdf · 12.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.