Original source · versioned page text
Arborist Report inc VMP
Very large file: it may take a few minutes
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Arborist Report 14 Serenity Close, Noosa Heads 2 APPROVED DEVELOPMENT The approved development is a Resort Development comprising Multiple Dwelling (109 Dwelling Units) and Accommodation Building (90 Accommodation Units) and Ancillary Facilities (Council Application Ref.: 132008.176.03, dated 9 February 2017). The Noosa Council decision notice included the following conditions relating to vegetation management: Vegetation 1. Existing trees on the site and within road reserves are to be retained except where required to be removed due to building operations, requirements of the approved Settler’s Cove Management Plans or the conduct of the approved use. 2. The Koala and Glossy Black Cockatoo habitat trees identified for retention on plan L- SD-1.01 (Rev. A) dated August 2009 by DBI Design Pty Ltd shall be retained. 3. The existing Koala and Glossy Black Cockatoo habitat trees and any other trees within setback and open space areas to be retained must be protected. As building works are likely to impact the trees’ root zones, a qualified Arborist (having a minimum Diploma of Arboriculture or ISA certification and a minimum of three years’ field experience) must be contracted to prepare a Tree Management and Protection plan and shall: a. oversee installation of a hard temporary protection zone prior to commencement of works with ‘no go’ signage in accordance with AS 4970- 2009. All site workers must be inducted in relation to the tree protection; b. supervise any works within the temporary protection zone; c. undertake hazard reduction and formative pruning as necessary; & d. provide certification that the trees were protected in accordance with the Arborist’s recommendations. The Tree Management and Protection Plan Shall be presented prior to or at the pre- start meeting for the site. The Arborist shall monitor the health and structural integrity of the trees to be retained at least monthly during the construction period and quarterly for 12 months after construction is completed. The developer shall rectify any decline in the health or structural integrity of the trees, in accordance with the Arborist’s recommendations. 4. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- a. Re-use for building materials. 3 | 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.