Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 4- Noosa on Weyba Titling Report.Budget MCU12/0208

of 25

Text shows just the words. Original shows the document exactly as it was published.

                                                                   Report Name: Community Title Report
                                                                        Project Name: Noosa on Weyba


Schedule A – schedule of entitlements
     Section 46 (BCCM Act 1997) which sets out the application of the contribution schedule and
     interest schedule entitlements. The Act states that a principle of Equality or Relativity must be
     identified and all lots contribution entitlements must provide information as to the underlying
     basis on how the entitlements were calculated using either Principle. For interest entitlements
     the Act states that the market value principle must be used, unless circumstances require
     another just and equitable method to be used.

Schedule B – explanation of the development
     This schedule should be completed in accordance with Section 57(3) and (7) (BCCM Act
     1997;) Each plan or other instrument lodged relating to the scheme land shall be in
     accordance with the provisions set out in this schedule.

     This schedule sets out the future development of the scheme. For example how many stages it
     will be developed over and the likely yield in terms of lots. It also sets out how entitlements in
     future stages will be calculated in accordance with use and impact upon common property.

Schedule C – By-Laws
     The purpose of the By-Laws is to set out permitted use and behaviour on common property and
     also conduct within individual lots.

     The Body Corporate is obligated under Section 94 of the Body Corporate and Community
     Management Act to enforce the Community management Statement which includes the by-
     laws contained therein as detailed below:

     94 Body corporate’s general functions
     (1)    The body corporate for a community titles scheme must—
            (a)     administer the common property and body corporate assets for the benefit of
                    the owners of the lots included in the scheme; and
            (b)     enforce the community management statement (including enforcing any by-
                    laws for the scheme in the way provided under this Act); and
            (c)     carry out the other functions given to the body corporate under this Act and
                    the community management statement.

 For a scheme such as Noosa on Weyba the by-laws would typically contain any Assessing
 Authority requirements plus the following provisions:

     1.    Interpretation – covers meaning of words, rules of interpretation
     2.    Noise and obstruction- behavior of invitees
     3.    Behaviour of invitees.
     4.    Maintenance of lots.
     5.    Protection of Common Property - Gardens and plants, Roadways particularly vehicular
           speeds within Noosa on Weyba, Structures, Rubbish management, Damage to Common
           Property




                                        Page 10 of 25

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4- Noosa on Weyba Titling Report.Budget MCU12_0208.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.