Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 4- Noosa on Weyba Titling Report.Budget MCU12/0208

of 25

Text shows just the words. Original shows the document exactly as it was published.

                                                                      Report Name: Community Title Report
                                                                           Project Name: Noosa on Weyba
                            (5).
           (7)       The seller does not fail to comply with subsection (1) merely
                    because the disclosure statement, although substantially
                    complete as at the day the contract is entered into, contains
                    inaccuracies.


8 Demonstrate how the Community Title model collects levies
  to fund management and conservation for Noosa on Weyba
  and related areas under Council control in relation to the
  Biodiversity Offset Area (BDOA)

  8.1 Funding Management and Conservation
      A community title scheme must adopt both an Administration and a Sinking Fund Budget for
      expenditure at the annual general meeting each year. The inclusions within each fund function
      differently.

      The Noosa on Weyba administration fund is expected to cover reasonable expenditure for the cost of
      maintaining common property, body corporate assets and insurance. The budget for the first 12
      months is prepared for the original owner and would include any day to day costs associated with
      common property, management plans or DA obligations which be generated.

      The Noosa on Weyba Sinking Fund is expected to fund items of a capital or non-recurrent nature.
      When preparing the first 12 month budget for the scheme a Quantity Surveyor is engaged by the
      original owner to prepare the Sinking Fund Report which includes any costs associated with common
      property, management plans or DA obligations which generate a cost.

      The implications for Noosa on Weyba under a Community Title Scheme structure immediately
      obligates both a Principal scheme and any subsidiary scheme to adopt both Administration and
      Sinking Fund which can include funding for but not limited to the following:

      • Funding of Koala habitat enhancement and restoration within Noosa on Weyba
      • Funding the maintenance of koala fencing within Noosa on Weyba
      • Contribution towards maintaining koala fencing under Council control (along Walter Hay Drive),
        the scheme would require an additional obligation such as an easement with Council or an
        agreement to specify the terms of such contribution. The original owner would have powers to
        enter into such agreement under the CMS at the first meeting of the scheme or within the first 12
        months under the relevant power of attorneys.

      An Initial Noosa on Weyba Principal Scheme Estimated Budget is attached refer to Annexure “C” for
      the initial estimate of outgoings which includes the Environmental Levy Components (EL).




                                           Page 16 of 25

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4- Noosa on Weyba Titling Report.Budget MCU12_0208.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.