Council archive · source document
Development Application Part 3 of 3 - Plans · OPW11/0320
Plans and drawings: the text below has words only, no drawings.
m
ENVIRONMENTAL DIARY
EROSION AND SEDIMENTATION MANAGEMENT PLAN
Sediment Control Weekly Visual Inspection or After Rainfall Event In
N
Project:- Operational Works - Sewer Re-Alignment
Principal:-
Contractor:- S TOOHEY
Objective Comply with all statutory regulations and maintain erosion and sedimentation
Location:- 17 TOPAZ STREET, COOROY
controls throughout the duration of construction. Comply with the intent of
Job Ref. No:- 110586
the sedimentation management plan shown on sheet 29 of the drawings
prepared by Noel Covey & Associates, and other measures as deemed Date:- El Regular Monitoring (Weekly)
necessary to control erosion and minimise sediment transport. q Special Event Monitoring (briefly describe event)
Approx Time:- om/pm
Management Strategy Site Foreman to identify direction of stormwater land flows and flows resulting Date Condition Corrective
Item Control Acce ptable Action Corrective Action Taken
from construction, and provide sediment fences, rock filter dams, turf strips, Monitored Measure Required (Describe)
stormwater pit entry filters, and other measures as shown on the plan or as Installed x
deemed necessary to prevent uncontrolled stormwoter flows over unprotected
areas, and avoid sediment transport to waterways and stormwater pits. Sediment
Fences
Tasks and Actions Erect sediment barriers as shown on sheet 29 of the drawings, and at other
Required locations as deemed necessary by visual inspection. Temporary rock filter Rock
Filter
dams are to be placed at all concentrated stormwater flow outlet locations Dams
and maintained with fresh filter screenings throughout the duration of
construction. All earthworks areas to be topsoiled and seeded or
hydromulched upon completion of profiling. All footpath areas to be Stormwater
Outlets
provided with a minimum 4m wide turf strip behind kerb and channel
immediately after footpath area construction and topsoil profiling is
completed. Strategically place filters around all stormwater pits.
Catchpit
Areas
Performance Indicators Site Foreman to -
• check for erosion and sediment flows at base of all Pavement
embankments and other Areas
00
exposed areas after rain;
P
• check that rock filter dams are working during rain periods;
• check that all sediment fences and other erosion control Bottom of
Embankment
mechanisms are
working during rain periods; and
• clean and maintain filter fabric covers to pits after rain periods. Humeceptors/
Gross
Pollutant
Monitoring Site Foreman to monitor performance of all sediment controls on a Traps
regular weekly basis and after every rainfall event. Any damaged
sediment control item is to be rectified, and trapped silt removed and Detention
deposited in an area not prone to erosion. Basin
Responsible Person Site Foreman to be responsible for all inspections and maintenance of sediment
control mPn-ijrP_- Other
Reporting Site Foreman is to complete the Environmental Diary for sediment control on a
weekly basis as a minimum, but also after every significant rainfall event or
My Special Comments:
other special event affecting the sediment control measures. The Signed:-
Environmental Diary shall be completed and delivered to the Superintendent for
record and audit purposes with each progress claim for the construction works.
Corrective Actions The Site Foreman to arrange for installation of additional sediment
controls and/or improve maintenance controls and replacement of LL
U_
screenings to filter dams as required, and report on measures taken 0
in the Environmental Diary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 of 3 - PlansRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.