Original source · versioned page text
20230025 Gympie Terrace MCU drawings 240605
Very large file (24.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 7, section 2. The text section number identifies this passage in the reader.
dTU
dD
dD
1.5
dWM
\ \ \ \ \ \
dS
\ \ \ \ \ \ \ \ \ \ \ dD
\ \ \
\ \
dTU
dD
\ \ \ \ \ \ \ \
ALBERT ST
\ \ \ \ \ \ \ \ \ \
0 dD
2.
dD
\
\ \ \ \ \ \ \ \ \ \ \
dD
1.5
66
dWM
1.
dD
dTU
dD
APPROXIMATE IL OF EXISTING
dD
STORMWATER PIPE = 0.94m
C 1/EX2
dTU
dWM
1.5
dD
2.0
\
dTU
1/EX2
\ \ \ \ \ \ \ \ \ \ \
dD dD
1.5
dWM
EXISTING SITE CATCHMENT TABLE
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\
CATCHMENT AREA (m2) IMPERVIOUS
dWM
1/EX1 1982 95
C X1
1/EX2 600 100
2/EX2 1171 95
X1 439 100
5 0 5 10
SCALE (metres)
1 : 250 (FULL SIZE)
North Point Approved Project Address Title
203 GYMPIE TERRACE PRE-DEVELOPMENT
N
QLD 4566 CATCHMENT PLAN
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details PROJECT NAME: Project Number Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 30/5/24 LAYOUT UPDATED AB MP www.recorconsulting.com | ABN 89 647 469 707 GYMPIE TERRACE PTY. LTD MIXED USE DEVELOPMENT 20230025 A1
A 06.06.23 FOR APPROVAL QT BP
AS SHOWN COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This Drawing Number Revision
050 A
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK the revision description.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.