20230025 Gympie Terrace MCU drawings 240605
Very large file (24.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
dD
dD
dD
1.5
dD
BM: Nail in Kerb
dD
dD
dD
RL: 1.51
PP
E M
dW
1.5
dD
E E
dD
dD
M
64
E dW
1.
E EXISTING POWER POLE
E
M
CEEXISTING CROSSOVER
dW E
dD
1.5
E PP
dD
A
dD
RR
E M
dW
TE
TO BE DEMOLISHED
E
E
NOTES:
IE
dD
WM
P E d
dD
YM
1. FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE REQUESTED AND
dD
E
E
G EXISTING
1.5 dW
M VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
2.0
E
dD
TELSTRA PIT
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING
E
E
5 M APPROXIMATE IL OF EXISTING
dD
1. dW
FEATURES OF THIS SITE AND ENSURE ANY ADDITIONAL WORKS NOT
dD
E STORMWATER PIPE = 0.60m SHOWN ON THIS PLAN ARE INCLUDED IN THE CONTRACT.
5
EXISTING WATER
6
1.
dD
2.0
FIRE HYDRANT E M
E
dW WM 3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON SURVEY, DBYD
70
E
dT \
AND COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO
1.
\
dD
U
FH \
dD
\ \ \ \ \ \ \ \ \
M \ CONFIRM ACTUAL LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY
E dW
E
\
dD
\ EXCAVATION OR TRENCHING WORKS.
dT
\
U
E
PP M \ dD dD
dW \ dD
1.5
E 4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE
E
dD
dT
EXISTING CROSSOVER
\ \ \ \ \
U
1.5
dD
PRIOR TO COMMENCEMENT OF WORKS.
TO BE DEMOLISHED E M
dD
dW \ \ \ 2.
dT 0
E
E
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY
E
U
\
EXISTING KERB AND E M PP DEMOLITION WORKS COMMENCING ON SITE.
dW dS
\
dD
CHANNEL
dD
5
dT
1.
U
E EXISTING VEHICLE
dD
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
E
\ \
M 2.0 1 CROSSOVER dS
E dW AND REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION
2.
dT
0
\ RP96277
U
\ CLEARING PLAN (BY OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY
E \ dS
E
M LANDSCAPER.
dD
dD
dW \
dD
dT
U E
EXISTING BUILDING
1.5 E
\ \ \ \ \
APPROXIMATE IL OF EXISTING 7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE
M TO BE DEMOLISHED dS
E
STORMWATER PIPE = 0.85m dW SUITABLE ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO
dT
E
U BM: Nail in Kerb
DEMOLITION WORKS BEGINNING.
6
dD
RL: 1.775 dS
6
dD
dD
1.
EXISTING WATER dT E d WM
V dD
E
U
FIRE HYDRANT \ 8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
62
E 2.0 dS
\
1.
THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
dD
dD
E
V
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.