Original source · versioned page text
Negotiated Decision Notice MCU21 0170
Officer: Maxwell Potter Direct Telephone: 53296245 Our Reference: MCU21/0170 Your Reference: 20210417 30 March 2022 Cooper and Small Pty Ltd C/- Adapt Town Planning PO Box 7618 SIPPY DOWNS QLD 4556 [email protected] Dear Sir/Madam, Negotiated Decision Notice Planning Act 2016 I refer to your application and the representations you made in respect to the decision notice. On 28 March 2022, Council decided your representations. This negotiated decision notice replaces the decision notice of 21 February 2022. Details of the negotiated decision are as follows: APPLICATION details Application No: MCU21/0170 Street address: 183 Weyba Rd Noosaville Qld 4566 Real property description: Lot 8 RP 113358 Planning Scheme: Noosa Plan 2020 (25 September 2020) decision details Council on 21 February 2022, decided to issue the following type of approval: Development Permit for Material Change of Use of Premises (Dual Occupancy) In relation to representations, Council on 28 March 2022 decided to: Agree to amend conditions 13 and 16 currency period of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions must be complied with Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date A.00.01 TP4 Cover Page, prepared by Hive Architecture 17.02.2022 A.00.02 TP4 Site Plan, prepared by Hive Architecture (as annotated by Council) 17.02.2022 A.01.01 TP4 Ground Floor Plan, prepared by Hive Architecture (as annotated by Council) 17.02.2022 A.01.02 TP4 Upper Floor Plan, prepared by Hive Architecture (as annotated by Council) 17.02.2022 A.01.03 TP4 Roof Plan, prepared by Hive Architecture 17.02.2022 A.04.01 TP4 Elevations, prepared by Hive Architecture 17.02.2022 A.04.02 TP4 Elevations, prepared by Hive Architecture 17.02.2022 A.04.03 TP4 Elevations, prepared by Hive Architecture 17.02.2022 A.04.04 TP4 Building Sections, prepared by Hive Architecture 17.02.2022 Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Currency Period This development approval lapses if the use has not happened by 21 February 2028, unless an application to extend the currency period is approved by Council. Built Form The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. The development must not exceed a Gross Floor Area of 121m2 per unit. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to each dwelling. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. Fencing and Walls Any street fencing must be setback an average of 1 metre from the front property and must not exceed a maximum height of 1.8 metres. The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Landscaping Works The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan and in particular the Noosa Plan - PSP2 – Landscaping Planning Scheme Policy for that specific area and must include in particular: a minimum one (1) metre wide landscaping strip between the fence and the front property boundary along the Weyba road frontage of the subject site, exclusive of the access driveway, generally uncompromised by infrastructure items; a minimum 800mm wide landscaped garden to be located on the inside of the front boundary fence, exclusive of the access driveway, generally uncompromised by infrastructure items; The front boundary landscaping outside and inside of the fence must be densely planted with understorey and taller species to screen the fencing and building from the street with plants selected to grow to a minimum mature height of 1.5m and be planted at maximum 1.5m centres; The front boundary landscaping must include at least two feature trees with a 45 litre pot size minimum. A minimum one metre wide garden to the eastern and western boundary fences must be densely landscaped. Screening plant species must be planted at a maximum of 1.5m centres and have a 200mm pot size. The screening trees must grow to a minimum mature height of 4m along the entire length. All pools must be situated to allow for soft dense landscaping between the pool and fence for the length of the rear boundary. A minimum 0.5 metre wide garden to the southern boundary fence must be densely landscaped with Syzygium australe. The Syzygium australe are to be planted at a minimum of 1m centres and have a 200mm pot size. The screening trees must grow to a minimum mature height of 4m along the entire length. Provision of 1 x 45 litre pot size street tree within the road reserve for every 8 metres of road frontage. Provide a planting plan and plant schedule including species and pot size that meets the PSP2 – Landscaping Policy in particular plant species that are Noosa Native Preferred and meet the local character of the area. A minimum 0.6 metre wide garden to the eastern and western boundary fence must be densely landscaped. Screening plant species are to be planted at a maximum of 1.5m centres and have a 200mm pot size. The screening trees must grow to a minimum mature height of 4m along the entire length. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. Engineering External Works Weyba Road must be upgraded for the length of its frontage to the subject site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: construction of a pedestrian footpath in accordance with the conditions of this Decision Notice removal of the existing property access and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed relocation/reinstatement of impacted existing on-street parking bays in the frontage of the site Condition 19a is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk infrastructure identified by Council’s LGIP to service the development. Site Access and Driveways A sealed access driveway must be provided from Weyba Road to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a driveway crossover generally in accordance with Council’s Standard Drawings RS-049 and RS-050 together with any associated addendum Car Parking A minimum of 4 car parking spaces must be provided on the site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: Carparking/garaging with dimensions, crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities Sufficient area for vehicles to be able to enter the site and space in a forward gear, reverse from the space and manoeuvre on site and exit the site in a forward gear in a total of 3 movements All car parking and the access driveway must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Pedestrian and Bicycle Facilities Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a 2.0 metre wide footpath within the road verge for the entire length of the site’s frontage to Weyba Road suitable transitions to the existing footpath on either side of the development site Condition 23 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk infrastructure identified by Council’s LGIP to service the development. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with drawing number S21-074-P01 Revision D prepared by Westera Partners dated 20 December 2021. The works must include in particular: collection and discharge of stormwater to Council’s infrastructure in Weyba Road extension of the site stormwater system to accommodate stormwater from the adjoining property to the south, including registration of drainage easements. the use of gravity stormwater drainage and not surcharge pits. Condition 24 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements An easement for drainage purposes must be registered in favour of the benefited lots against the title of the subject site to encompass any structures that convey stormwater from the benefitted lot to Weyba Road. The easement must be a minimum width of 1.0m or of sufficient width to wholly contain the drainage structures. The easement must be granted prior to the commencement of the use. Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All fill and associated retaining structures/batters must be undertaken in accordance with an Operational Works approval, and be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges Qualified Person For the purpose of preparing a Landscape Plan, a qualified person is considered to be a landscape architect, landscape designer and/or horticulturist with a minimum of 3 years current experience in the field of landscape design. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Preparation of a Preliminary Construction Management Plan A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: traffic management during all aspects of the construction phase including: a Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction maintenance of safe pedestrian access for the areas affected by the works during and after daily construction has ceased proposed fencing to the site during the construction phase of the development approval of the Traffic Management Control Plan by the Department of Transport and Main Roads (DTMR) for any works on State controlled roads worker car parking maintenance and protection of water quality and existing drainage lines through the construction site, through the implementation of appropriate erosion and sediment control measures works programme identifying key components of the works and their respective durations establishment of a communication protocol with the general public, adjoining owners, and emergency services to advise of agreed construction times, impacts on traffic, services and other relevant issues Include signage in prominent locations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details. identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage, NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense it is acknowledged that the preliminary Construction Management Plan will be a draft document requiring finalisation upon appointment of the Principal Contractor employed to construct the works and a final document will be required to be submitted at the Pre-Start Meeting for the project Private Infrastructure All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Road work, Stormwater, Drainage work, Earthworks, Landscaping. Development Permit for Building Works All building work. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Maxwell Potter Graduate Development Planner Enc: Appeal Rights Approved Plans/Documents DECISION NOTICE HISTORY Original Decision Notice – 21 February 2022. Negotiated Decision Notice – 28 March 2022, with an amendment to conditions 13 & 16 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 8 of 9 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 9 [word/footer3.xml] Page 9 of 9 [word/footer4.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 9 [word/footer5.xml] Page 9 of 9 [word/footer6.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 9 [Attachment: image2.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.