Council archive · source document
App F - Operational Management Plan · 132008.299.02
Plans and drawings: the text below has words only, no drawings.
5.10 Preventative Amenity Management
Beyond noise, Dolphins proactively manages potential amenity impacts by:
• Keeping outdoor lighting low-level and shielded to prevent spill.
• Maintaining landscaping to provide screening and filtering.
• Ensuring waste storage is enclosed and away from boundaries.
• Maintaining clean, tidy outdoor areas to prevent nuisance.
• Ensuring guests do not gather near boundary lines, driveways or footpaths.
These measures collectively ensure a well-managed, low-impact operation.
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App F - Operational Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 561 KB (small file)
- File type
No other editions are linked here.