Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

App F - Operational Management Plan · 132008.299.02

of 42

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
            o   guest behaviour trends
            o   noise patterns
            o   cleaning or maintenance concerns
    •   Immediately, if a serious or repeat complaint is received.
Management uses these reviews to refine operational procedures and prevent recurring issues.
11.5 Continuous Improvement Procedures
Where monitoring identifies a need for improvement, Dolphins will:
    •   Adjust supervision patterns or walkthrough frequency.
    •   Increase signage or guest communications.
    •   Modify staff training to address identified issues.
    •   Reinforce behavioural expectations with guests.
    •   Adjust use of communal or outdoor areas if needed.
    •   Enhance lighting, screening or operational barriers if appropriate.
    •   Update relevant sections of the OMP.
The operation continuously refines its procedures to address changing conditions and guest behaviour.
11.6 OMP Review Cycle
The Operational Management Plan will be reviewed:
    •   Annually as part of a routine operational assessment;
    •   Immediately if:
            o   there is a significant change to operations;
            o   recurring complaints arise;
            o   a serious incident occurs;
            o   Council requires amendments; or
            o   improvements are identified through monitoring.
Following each review, updates will be adopted and staff will be briefed on any operational changes.
11.7 Staff Briefings and Feedback
Continuous improvement is supported through regular staff engagement:
    •   Daily informal briefings at shift change.
    •   Monthly discussions between the manager and onsite owners.
    •   Staff are encouraged to report operational issues, hazards or improvement opportunities.
    •   Staff feedback informs procedural adjustments and training refinements.
This collaborative approach enhances operational consistency and responsiveness.
11.8 Accountability and Transparency
Dolphins maintains an open and transparent operational culture:

                                                                                                       33

Used in these records

About this file

File size
561 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App F - Operational Management Plan.pdf · 561 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.