SEDIMENT CONTROL LEGEND
SEOIMENT FENCE
ee SFr
=A
——— GE
FALTER DAM AND SEDIMENT WEIRS
TURF (GRASS ALTER STRIPS) BXCLUDE TURF
SUPPLEMENIAKY SEVIIMENT ANU ERUSIUN CLONIKUL NUIES
4. CONSTRUCTION OF ALL SILT MANAGEMENT DEVICES ARE TO BE IN ACCORDANCE WITH IE AUST "SOIL
EROSION AND SEDIMENT CONTROL " GUIDELINES AND TO THE SATISFACTION OF THE ENGINEER.
2. SEDIMENT FENCES AND/OR DAMS SHALL BE ERECTED AS DIRECTED BY THE ENGINEER UPON
COMMENCEMENT OF EARTHWORKS AND SHALL BE MAINTAINED UNTIL GRASS COVER IS ESTABLISHED
TO THE SATISFACTION OF THE ENGINEER. SEDIMENT FENCES SHALL SE APPROVED SILT FENCE MESH
ANCHORED BY STAR PICKETS AT MAXIMUM 2.0M CENTRES
3. SEDIMENT PONDS AND FENCES AT TOE OF EMBANKMENTS TO BE INSTALLED PRIOR TO COMMENCING
EARTHWORKS CONSTRUCTION IF ORDERED. SEDIMENT FENCES AT TOE OF EXCAVATION TO BE
INSTALLED IMMEDIATELY EXCAVATION 1S COMPLETED UNLESS EXCAVATION SLOPE IS IMMEDIATELY
TREATED WITH SLOPE PROTECTION OR REVEG ETATION
4. SURFACE ROUGHENING BY TRACK OR SHEEP FOOT ROLLING OF EMBANKMENT AND EXCAVATION
SLOPES SHALL BE CARRIED OUT IN ACCORDANCE OF SECTION A5 OF THE GUIDELINES.
“ NOOSA SHIRE COUNCIL
DEVELOPMENT PERMIT OPERATIONAL WORKS No.2027/ 201
REC'D BY..veccsccecccseecssseesennyfie DATE. eedecseal ssseeseee
CKD BY..eesceeccccecseseeecsenerygfleee DATEL... Ieveevel sssesese
AMEND CKD [email protected]..! Voy Dey 20°).,
UNDER
SPECIFICATIONS BE DEPARTED FROM WITHOUT THE
®
/
5. SEDIMENT BARRIERS USING SAND BAGS IN ACCORDANCE WITH SECTION A5-C8-2 OF THE GUIDELINES
SHALL BE INSTALLED AT ALL KERB INLET PITS AND AT INTERMEDIATE LOCATIONS AT SUBGRADE STAGE
AND EACH STAGE OF PAVEMENT AND ASPHALT CONSTRUCTION.
6. MESH COVERS SHALL 8E PLACED OVER FIELD INLETS PIT GRATES AND APPROVED AGGREGATE FILLED
FILTER BLOCKS SHALL BE PLACED IN ALL SIDE-ENTRY PIT INLETS AND MAINTAINED IN POSITION TO
PREVENT SILT ENTRY TO DRAINAGE SYSTEMS UNTIL REMOVAL IS APPROVED BY THE ENGINEER.
7. GRASS FILTER STRIPS (TURFING) SHALL BE INSTALLED IMMEDIATELY AFTER TOP SOILING OF
FOOTPATHS.
8 IMMEDIATELY UPON COMPLETION OF EARTHWORKS TO WITHIN 100mm OF THE FINISHED SURFACE
LEVEL, A LAYER OF TOPSOIL IS TO BE SPREAD OVER THE WHOLE OF THE EXPOSED EARTHWORKS AND
LIGHTLY COMPACTED AND TRIMMED TO THE FINISHED SURFACE LEVEL AND GRASSED BY SEEDING AS.
UNDER:-
JAPANESE MILLET 100kg PER HECTARE
MAT GRASS: 20kg PER HECTARE
COUCH GRASS 10kg PER HECTARE
RYE GRASS 10kg PER HECTARE
FOLLOWING SEEDING THE SURFACE IS TO BE LIGHTLY HARROWED OR CULTIVATED TO IMBED THE
SEED IN THE SOIL. THE CONTRACTOR IS TO MAINTAIN THE GRASSED AREAS SO THAT AT THE
COMPLETION OF THE MAINTENANCE PERIOD AT LEAST 75% OF EACH 4 m? HAS A DENSE LIVING COVER.
PROVIDE FILTER
TUBE TO NEXT 8
DOWNSTREAM PIT.
SILT MANAGEMENT AND EROSION CONTROL SHALL BE MAINTAINED AT A SUITABLE LEVEL AND
CONDITION TO THE SATISFACTION OF THE ENGINEER.
“
—
—_
—_—
—_—
EROSION AND SEDIMENT MANAGEMENT PLAN
OBJECTIVES
COMPLY WITH ALL STATUTORY REGULATIONS DURING THE PERIOD OF CONTRACT WORKS CONSTRUCTION AND MAINTENANCE. COMPLY
WITH THIS EROSION ANO SEDIMENT CONTROL PLAN PREPARED BY TOD NOOSA CONSULTING ENGINEERS TO CONTROL EROSION AND
SEDIMENT.
MANAGEMENT PRINCIPLES
THE MANAGEMENT PRINCIPLES EMPLOYED IN THIS PLAN ARE IN ACCORDANCE WITH “SOIL EROSION AND SEDIMENT CONTROL -
ENGINEERING GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES, JUNE 1996", THE BASIC PRINCIPLES ARE TO:
MINIMISE AREA OF DISTURBANCE
CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE
CONTROL EROSION (FINE PARTICLES)
CONTROL SEDIMENTS (COARSE PARTICLES)
REVEGETATION & REHABILITATION
eeeee
MANAGEMENT STRATEGIES AND ACTIONS.
* CONTRACTOR TO CLEAR ONLY VEGETATION (TREE REMOVAL AND GRASS) AS NECESSARY FOR EARTHWORKS CONSTRUCTION
*® CONTRACTOR TO IDENTIFY DIRECTION OF UPSTREAM SURFACE WATER FLOWS AND, IF POSSIBLE, PROVIDE BARRIERS TO DIVERT
FLOWS AWAY FROM EXCAVATION SLOPES AND TOES OF EMBANKMENTS AS SHOWN ON THE PLAN OR DIRECTED BY ENGINEER,
CONTRACTOR TO IDENTIFY SURFACE FLOW PATHS WITHIN THE CONSTRUCTION SITE, PROVIDE BARRIERS AND/OR CHUTES TO
PROTECT EMBANKMENT SLOPES, PROVIDE SILT TRAPS AROUND DRAINAGE INLETS AND OUTLETS, AS SHOWN ON THE PLAN OR
DIRECTED BY ENGINEER
*® CONTRACTOR TO PROVIDE REVEGITATION SUCH AS HYDROMULCH, ENVIRONMENTAL MATTING, TURFING AND SEEDING AS SHOWN ON
THE PLANS OR AS DIRECTED BY THE ENGINEER
PERFORMANCE INDICATORS
@ CONTRACTOR TO CHECK AFTER RAINFALL FOR EVIDENCE OF EXCESSIVE FLOW CONCENTRATIONS, EROSION PATHS DEVELOPING,
SILT AND SEDIMENT ACCUMULATION BEING EVENLY DISTRIBUTED THROUGHOUT CONTROL MEASURES. CHECK DURING RAIN THAT
FLOWS ARE NOT BY-PASSING CONTROL MEASURES.
PERFORMANCE MONITORING
STRIPS AT 45° TO KERB AT Wm WTERVALS. ’ rm * CONTRACTOR TO CHECK ALL CONTROL MEASURES AFTER EVERY RAINFALL EVENT PRODUCING RUN-OFF ONTO THE SITE AND AT
« 7 WRITTEN APPROVAL of the MANAGER LAND DEVELOPMENT MAXIMUM WEEKLY INTERVALS. CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF INSPECTION INCLUDING ANY
FLTER TUBES CORRECTIVE ACTION TAKEN.
PLANS AFPROVED Z, ty RESPONSIBLE PERSON
« CONTRACTOR SHALL NOMINATE AT THE PRE-START MEETING THE PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND
iv, wv I leo] oy cn LAR iD DEVELOPMENT MAINTENANCE OF CONTROL MEASURES (E.G. SITE FOREMAN).
we MOL. FLAK Nie
PAOKCT DRAWING TITLE ‘ASSOCIATED CONSULTANT SPMR PTY. LID
PROPOSED RESIDENTIAL SUBDIVISION SITE WORKS, SRE WATTERSON & Aan. 63 095 134 991
26 HEADLAND DRIVE, NOOSAVILLE SEWERAGE eur tSSOCATES TOD 7.0. Bor 133, Nowa Heads, 04567
for HENJO INVESTMENTS PTY LTD & RETICULATION AND urveyors & Planners
10 Masia Summ COROT
PO.RRERCOOROY 0 4h
Phone {07) S409 9600 Fax (07) S449 9494
5 EMail: tod @bi d.net
KAREN McDONAGH INVESTMENTS PTY LTD WATER SUPPLY PLAN regent TOD NOOSA —e oe ee
ELECTRICAL ENGHEER CONSULTING ENGINEERS Hopcatt SEPT 2007
LOTS 1&2 ON RP 137140 Structural Civil ° S24 SHOWN
PARISH OF NOOSA SURVEY ORIGIN: uctural Civi ——t bv wren 94
COUNTY OF MARCH HORT Rp 137140 « 8 yA wo
vi 1998 eb the, te rr
NOOSA COUNCIL APPROVAL No 2006/2241 RL 18.277 & = j 07562] 4 nhay
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2031 - Approved Plans - 12/12/07 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 425 KB (small file)
- File type
No other editions are linked here.