Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment 7B - Fauna and Flora Assessment_NoosaLandfill_NorthernSection_Revision3

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                             Native Foresters



         Performance Outcomes                                    Acceptable Outcomes                                              Response

                                                              development, plantings twice the number
                                                              of the removed trees and plants.

 Koala habitat protection and enhancement
 PO11                                                AO11.1                                                   Complies with PO11
 Development is designed, constructed and            Development      design   complies     with    the
 operated to—                                        Koala-sensitive Design Guideline: A guide to koala       The proposed works will require clearing of 0.9 ha of
     a) protect and enhance koalas and               sensitive design measures for planning and               koala habitat.
         koala habitat and avoid adverse             development activities.
         impacts;
     b) provide measures to assist the                                                                        It is proposed to provide the following measures to
                                                     AO11.2
         survival of koala populations in the                                                                 reduce impacts and risks to koalas as a result of
                                                     Development   incorporates     revegetation       and
         area to mitigate any potential threats      landscaping that provides food, shelter           and
                                                                                                              these works;
         or risk to koalas; and                      movement opportunities for koalas.                            • Offset plan to include a 3:1 offset of koala
     c) provide for safe and appropriate                                                                               trees
         koala movement across the                                                                                 • Weed management of the site
         landscape.
                                                                                                                   • Erecting a fauna, dust and rubbish exclusion
                                                                                                                       fence around the edge of the landfill to
                                                     AO11.3                                                            reduce impacts to adjacent vegetation and
                                                     Development is designed to maximise and enhance                   excluding access to the landfill areas for
                                                     connectivity between koala habitat trees and ensure               koalas and other fauna.
                                                     safe koala movement.
                                                                                                                   • A koala spotter catcher required during
                                                                                                                       clearing works to relocate koalas and other
                                                     AO11.4                                                            native fauna
                                                     During construction, measures are incorporated to
                                                     not increase the risk of death or injury to koalas, by
                                                                                                                   • Clearing works to be undertaken in a
                                                     including safe koala movement measures, as defined                sequential manner from cleared edges
                                                     in the Planning Regulation 2017.                                  towards retained vegetation to allow fauna
                                                                                                                       to escape
                                                                                                                   • Works to be in accordance with a CEMP
                                                                                                                       detailing clearing works methodology to
                                                                                                                       reduce impacts on native fauna.
                                                                                                                   • A site based Stormwater Management Plan
                                                                                                                       to protect water quality on site
                                                                                                                   • ESC plans for clearing and construction
                                                                                                                       works.
                                                                                                                   • Council to manage the site during landfill
                                                                                                                       operations to ensure regular inspections of




Noosa Landfill & RRC – northern section – Fauna and Flora Assessment – REV3                                                                              36
Log in to download the original file

Attachment 7B - Fauna and Flora Assessment_NoosaLandfill_NorthernSection_Revision3.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.