Original source · versioned page text
Attachment 7B - Fauna and Flora Assessment_NoosaLandfill_NorthernSection_Revision3
Native Foresters
Performance Outcomes Acceptable Outcomes Response
development, plantings twice the number
of the removed trees and plants.
Koala habitat protection and enhancement
PO11 AO11.1 Complies with PO11
Development is designed, constructed and Development design complies with the
operated to— Koala-sensitive Design Guideline: A guide to koala The proposed works will require clearing of 0.9 ha of
a) protect and enhance koalas and sensitive design measures for planning and koala habitat.
koala habitat and avoid adverse development activities.
impacts;
b) provide measures to assist the It is proposed to provide the following measures to
AO11.2
survival of koala populations in the reduce impacts and risks to koalas as a result of
Development incorporates revegetation and
area to mitigate any potential threats landscaping that provides food, shelter and
these works;
or risk to koalas; and movement opportunities for koalas. • Offset plan to include a 3:1 offset of koala
c) provide for safe and appropriate trees
koala movement across the • Weed management of the site
landscape.
• Erecting a fauna, dust and rubbish exclusion
fence around the edge of the landfill to
AO11.3 reduce impacts to adjacent vegetation and
Development is designed to maximise and enhance excluding access to the landfill areas for
connectivity between koala habitat trees and ensure koalas and other fauna.
safe koala movement.
• A koala spotter catcher required during
clearing works to relocate koalas and other
AO11.4 native fauna
During construction, measures are incorporated to
not increase the risk of death or injury to koalas, by
• Clearing works to be undertaken in a
including safe koala movement measures, as defined sequential manner from cleared edges
in the Planning Regulation 2017. towards retained vegetation to allow fauna
to escape
• Works to be in accordance with a CEMP
detailing clearing works methodology to
reduce impacts on native fauna.
• A site based Stormwater Management Plan
to protect water quality on site
• ESC plans for clearing and construction
works.
• Council to manage the site during landfill
operations to ensure regular inspections of
Noosa Landfill & RRC – northern section – Fauna and Flora Assessment – REV3 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.