                      e.      All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
                              with a commercial grade safety fence.
               ACID SULFATE SOILS
               39.    Deleted
               40.    Deleted.
               PREPARATION OF A PRELIMINARY CONSTRUCTION MANAGEMENT PLAN
               41.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Traffic management during all aspects of the construction phase including:
                              i.       Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction.
                      b.      Maintenance of safe pedestrian access for the areas affected by the works during and
                              after daily construction has ceased.
                      c.      Provision for worker car parking.
                      d.      Maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures.
                      e.      Works programme identifying key components of the works and their respective
                              durations.
                      f.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details.
                      g.      Identification of complaint management procedures including:
                              i.       Contact details for the on-site manager.
                      h.      Dispute resolution procedures.
                      i.      If the proposed earthworks exceed 1000m3, provide details on the location of external
                              fill sites/sources, the haulage route, type of vehicle to be utilised during filling
                              operations and frequency of usage. NB any damage to the existing road system as a
                              result of haulage operations shall be fully repaired at the applicant’s expense.
                      j.      It is acknowledged that the preliminary Construction Management Plan will be a draft
                              document requiring finalisation upon appointment of the Principal Contractor employed
                              to construct the works and a final document will be required to be submitted at the Pre-
                              Start Meeting for the project.
               5.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               Infrastructure Charges
               1.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Qualified Person
               2.     For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
                      landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
                      current experience in the field of landscape design.

                                                                                                         Page 8 of 10

Document Set ID: 23023774
Version: 5, Version Date: 22/05/2024
Log in to download the original file

Negotiated Decision Notice MCU22 0051.pdf · 156 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.