Council archive · source document
Development Application part 2 of 2 Report and Plans MCU13/0030
Plans and drawings: the text below has words only, no drawings.
Very large file (71.1 MB): may take a few minutes to open.
~
Callaghan & Toth
CONTENTS
1. SUMMARY............................................................................................................................5
2. INTRODUCTION ..................................................................................................................5
3. DESCRIPTION.......................................................................................................................6
3.1Proposed Works ...............................................................................................................6
4. WATER QUALITY MANAGEMENT PLAN ....................................................................11
4.1 Proposed On-Site Stormwater Treatment Process 11
.........................................................
4.2 MUSIC Model...... ..........................................................................................................
11
4.2.1 Source Nodes ..........................................................................................................
11
4.2.2 Treatment Nodes.....................................................................................................12
4.2.3 Rainfall Data...........................................................................................................12
4.3 MUSIC Modelling Results.............................................................................................12
4.3.1 Water Quality Objectives........................................................................................13
4.3.2 Assessment of Results. ............................................................................................
13
5 WA TER CYCLE MANAGEMENT PLAN .........................................................................16
6 FLOODING ASSESMENT REPORT .................................................................................16
6.1 Existing Conditions 16
........................................................................................................
6.2 Proposed Drainage System.............................................................................................16
7 CONCLUSIONS & RECOMMENDATIONS .....................................................................17
APPENDIX 1 -
Preliminary Stormwater Quality Management Plan ....................................
A
APPENDIX 2 -
MUSIC Results ............................................................................................
B
APPENDIX 3 -
Site Photos.................................................................................................... C
APPENDIX 4 -
Detention Basin Results ...............................................................................
D
3
1303, Kabara Hostel, Cooroy IWMP.doc January 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and Plans MCU13/0030Related documentApplication case desk ↗
About this file
- File size
- 71.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.