Callaghan & Toth
5 WATER CYCLE MANAGEMENT PLAN
This development has been designed to ’Complying Solutions’ for Water Cycle
Management.
To this end, 100% of the new roof area of 3,570m2 on the site will be connected to two
rainwater tanks. The tanks will have a capacity of 46,000 litres (two x 23,000 litre tanks)
which is in excess of the complying solutions requirement.
The rainwater tanks will supply water to cold water washing machine supply, toilet
flushing and hose cocks adjacent the building for hand watering of landscaping.
For landscaping the Water by Design Guidelines specify ([1030m2xO.53m = 546 KUyr] +
364 =
1,500 L/day) for the new landscaped areas to be irrigated on site.
The tanks sizing can be checked in accordance with the Queensland Development
Code MP4.3 per compliance with storage for toilet flushing and Water by Design Music
Guidelines Version 1 December 2010 for storage for irrigation of landscaping to
Commercial sites.
Complying Solution 1:
Queensland Development Code MP4.3 per compliance with storage for toilet flushing
1500Upedestal (toilet) @ 23 toilets =
34,500L
10 Day Demand Check
Landscape Area =
(1,030m2xO.53m)+ 364 x 10 days demand =
15,000L for irrigation.
Total Storage for 10 day Supply = 34,500 + 15,000 =
49,500L
It is therefore recommended that a minimum of 46,000 litres of rainwater storage for
toilet flushing, cold water washing machine and irrigation be provided on site.
6 FLOODING ASSESMENT REPORT
6.1 Existing Conditions
This site is subject to ponding of floodwaters from the adjacent channels and the Q1 00
year ARI flood levels. The habitable floor areas of the new buildings and new carpark
are above the Q100 year ARI flood levels.
6.2 Proposed Drainage System
The carpark surface level is proposed to be drained to an underground drainage system
capable of taking a Q2 flow. The overflow will discharge to the existing car park and
surrounding vegetated Bio-Swale.
The habitable minimum floor level for the proposed centre is to be set at RL 107.20. The
minimum carpark level is RL 106.30, which is not affected by the Q100 flood level. The
applicant’s supplied flood certificate and gives a minimum Q1 00 flood level of RL105.23
AHD and a minimum floor level of RL106.7 AHD.
16
1303, Kabara Hostel, Cooroy IWMP.doc January 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and Plans MCU13/0030Related documentApplication case desk ↗
About this file
- File size
- 71.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.