Council archive · source document
Development Application part 2 of 2 Report and Plans MCU13/0030
Plans and drawings: the text below has words only, no drawings.
Very large file (71.1 MB): may take a few minutes to open.
Corrective Action When the sediment, oil or gross pollutants builds up to the depth specified in the
maintenance manual, the build up will be removed by emptying the storage area
into a truck or pumping out by a vacuum truck or equivalent and taken to a Council
approved disposal facility.
"
Operational Phase -
Objective Ensure that stormwater is adequately treated and gross pollutants are removed
prior to entry into bioretention systems.
Actions The Owner is to include the GPT’s/Sediment & Oil Arrestors into their maintenance
program which is to be carried out by Maintenance Staff, Vacuum Cleaners or
equivalent licensed contractor.
Monitoring Maintenance staff will carry out six monthly inspections of the GPT’s/Sediment &
Oil Arrestors. The following will be examined at each inspection:
. Gross Pollution build up
. Sediment build up
. Oil build up
Reporting Records are to be logged and kept for verification of compliance on a need basis.
Incidents . Gross pollutants clog the inlet
. Gross pollutants build up
. Sediment builds up.
Corrective Action When the sediment, oil or gross pollutants builds up to the depth specified in the
maintenance manual, the build up will be removed by emptying into a truck or
pumping out by vacuum truck or equivalent and taken to a Council approved
disposal facility.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and Plans MCU13/0030Related documentApplication case desk ↗
About this file
- File size
- 71.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.