4. HYDRAULICS
Hydraulic modelling has been carried out using TUFLOW software developed by BMT WBM.
TUFLOW is a computational engine that provides one-dimensional (1D) and two-dimensional
(2D) solutions for the free-surface flow equations to simulate flood and tidal wave
propagation. The Heavily Parallelised Compute (HPC) computational method has been
applied using 2020-10-AA version of TUFLOW. Modelling assumptions and outcomes are
described below.
Model Setup
4.1.1. Topography
TUFLOW model topography is based upon the DEM that was created from 2015 LiDAR and
detailed site survey. The catchment has been represented using a 5m hydraulic grid size.
The internal road was represented the proposed road profile using a 2d_zsh, with the crown
having a minimum level of 12.81m AHD above the culvert.
The building envelopes were also raised to ensure flood immunity using a 2d_zsh, with minor
regrading of lot beside building envelope of Lot 1.
4.1.2. Inflow
Inflows have been incorporated into the model setup using inflow polygons (2d_sa) to read
in the inflow hydrographs from the WBNM hydrology model.
4.1.3. Roughness
The roughness of the flow path has been incorporated into the model using Manning’s ‘n’
values to represent the differing land-uses. Table 4-1 outlines the applied roughness values.
Table 4-1: Model Roughness Values
Description Manning’s ‘n’
Road 0.015
Road Reserve 0.03
Cleared / Sporadic Vegetation 0.04
Low Dense Vegetation 0.06
Highly Dense Vegetation 0.10
4.1.4. Boundary
The TUFLOW model has been extended 1.5 km downstream of the study area such that tail
water assumptions do not influence flooding at the site. A normal depth rating curve has
been adopted for the downstream.
4.1.5. Culverts
A total of eighteen (18) existing culverts were represented within the model extent, with
culvert information obtained from Noosa Shire Council GIS information. The new ‘internal’
culvert has been sized to ensure the internal road servicing the development can achieve
immunity in the 10% AEP and remain trafficable in the 1% (2100) AEP event. A summary of
the culverts represented in the model are detailed in Table 4-2.
21-0288-FS001-V4 | Flood Investigation | 60 Glenridge Drive, Cooroibah | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.