Skip to the record
Accept no substitutions.

Original source · versioned page text

engineering

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                             GENERAL NOTES                                                                                        EARTHWORKS AND PAVEMENT                                                                                                                   DRAINAGE NOTES                                                                             SEDIMENT & EROSION CONTROL
                                                                             GN1.        ALL DIMENSIONS AND SET OUT POINTS ARE TO THE KERB LINE OF THE                            CONSTRUCTION NOTES (CONT.)                                                                                                                DN1.     1.5m WIDE EASEMENTS SHALL BE CREATED OVER ALL INTER-ALLOTMENT                     NOTES
                                                                                         SPECIFIED KERB TYPE. REFER LOCAL AUTHORITIES STANDARD DRAWINGS FOR                                                                                                                                                                          DRAINAGE LINES UNO.
                                                                                         KERB TYPE DETAILS.                                                                                                                                                                                                                                                                                                            SE1.   GENERAL:
                                                                                                                                                                                  EW8.       ANY IMPORTED FILLING MATERIAL REQUIRED TO MAKE UP SHORTFALLS IN                                                                DN2.     PIPE BEDDING AND BACKFILL ARE IN ACCORDANCE WITH LOCAL AUTHORITIES                           a. TEMPORARY DRAINAGE CONTROL. FLOW SHOULD BE
                                                                                                                                                                                             QUANTITIES SHALL BE CLEAN SOIL MATERIAL FREE FROM TOPSOIL,                                                                              REFERENCED SPECIFICATION AND/OR STANDARD DRAWINGS.
                                                                             GN2.        FINAL LOCATIONS OF CONDUITS SHALL BE PROVIDED WHEN AVAILABLE FROM                                                                                                                                                                                                                                                                             DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
                                                                                                                                                                                             VEGETABLE MATTER AND OTHER DELETERIOUS MATERIAL. THE FILLING
                                                                                         SERVICE AUTHORITIES. (IF REQUIRED).                                                                                                                                                                                                                                                                                                      b.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE
                                                                                                                                                                                             SHALL BE FREE FROM COBBLES OR ROCKS IN EXCESS OF 100mm NOMINAL                                                                 DN3.     STORMWATER PIPE MATERIALS ARE TO BE:                                                              INSTALLED AND BE OPERATIONAL BEFORE COMMENCING
                                                                             GN3.        ALL CONSTRUCTION SHALL JOIN SMOOTHLY TO EXISTING.                                                   SIZE. THE MATERIAL SHALL HAVE A MINIMUM SOAKED CBR 15 UNLESS                                                                            ·   UPVC DRAINAGE PIPE, MINIMUM CLASS SN8;                                                        UP-SLOPE EARTHWORKS.
                                                                                                                                                                                             OTHERWISE APPROVED BY THE SUPERINTENDENT.                                                                                               ·   R.C.P. RUBBER RING JOINTED, MINIMUM CLASS "2" ;                                          c.   ALL SEDIMENT & EROSION CONTROL DEVICES MUST BE
                                                                             GN4.        NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT OF WORK                                                                                                                                                                               ·   F.R.C. PIPE RUBBER RING JOINTED, MINIMUM CLASS "X", OR;                                       REGULARLY INSPECTED AND MAINTAINED BY THE
                                                                                         WITHIN EXISTING ROAD RESERVES.                                                           EW9.       ALL FILLING SHALL BE PLACED IN MAXIMUM 200mm LOOSE LAYER
                                                                                                                                                                                                                                                                                                                                                                                                                                       CONTRACTOR. INSPECTIONS SHOULD OCCUR ON A WEEKLY
                                                                                                                                                                                             THICKNESS WITH EACH LAYER COMPACTED TO AT LEAST 98% COMPACTING                                                                 DN4.     STORMPRO (PPE, RRJ, MINIMUM CLASS SN8), OR APPROVED EQUIVALENT, MAY BE                            BASIS (MINIMUM), ALONG WITH BEFORE AND AFTER
                                                                             GN5.        THE CONTRACTOR SHALL CONTACT ALL RELEVANT SERVICE AUTHORITIES FOR                                   AS MEASURED BY THE STANDARD METHOD DESCRIBED IN AS 1289.                                                                                ACCEPTED WITH SITE SPECIFIC COUNCIL APPROVAL. TRENCH WIDTHS AND
                                                                                                                                                                                                                                                                                                                                                                                                                                       SIGNIFICANT RUNOFF PRODUCING STORMS.
                                                                                         DETAILED LOCATION AND LEVEL OF SERVICES PRIOR TO COMMENCEMENT OF                                                                                                                                                                            BACKFILL MATERIAL SHALL BE IN ACCORDANCE WITH IPWEAQ STANDARD
                                                                                                                                                                                                                                                                                                                                                                                                                                  d. ALL DISTURBED LAND MUST BE RENDERED EROSION-PROOF
                                                                                         WORKS AND THE SITE. ANY DAMAGE TO EXISTING SERVICES SHALL BE                             EW10.      REFER TO THE GEOTECHNICAL REPORT REGARDING REMOVAL AND                                                                                  DRAWING DS-030 AND AS2566.2. COMPACTION OF BEDDING AND BACKFILL                                   BY THE ESTABLISHMENT OF 80% EFFECTIVE GROUND
                                                                                                                                                                                             REPLACEMENT OF EXISTING FILLING MATERIAL. THIS NOTE SHALL APPLY TO                                                                      MATERIAL SHALL BE MINIMUM 90% MMDD IN ACCORDANCE WITH AS2566.2. HDPE
                                                                                         RECTIFIED AT THE CONTRACTORS EXPENSE.                                                                                                                                                                                                                                                                                                         COVER WITHIN 28 DAYS OF FINAL EARTHWORKS TRIM.
                                                                                                                                                                                             THE SUBGRADE UNDER ALL ROADS, DRIVEWAYS AND FILL BATTERS.                                                                               PIPES SHALL BE OVALITY TESTED PRIOR TO ON MAINTENANCE WITH COUNCIL, TO
                                                                                                                                                                                                                                                                                                                                                                                                                                  e. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE
                                                                             GN6.        ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL AUTHORITY'S                                          FOLLOWING THE SITE STRIP AND DRIVEWAY SET OUT THE ENGINEER SHALL                                                                        DEMONSTRATE <7.5% DEFORMATION.                                                                    CONTROLLED, EXPOSED SURFACES TO BE EITHER
                                                                                         SPECIFICATIONS AND REQUIREMENTS.                                                                    BE CALLED TO SITE TO DETERMINE THE PRESENCE OF ANY EXISTING FILL
                                                                                                                                                                                                                                                                                                                                                                                                                                       MULCHED, COVERED WITH EROSION CONTROL BLANKETS
                                                                                                                                                                                             UNDER DRIVEWAYS AND ASSOCIATED BATTERS. PROVIDE A BACKHOE FOR                                                                  DN4.     UPVC PIPES ARE EITHER RUBBER RING JOINTED OR SOLVENT WELD JOINTED.
                                                                                                                                                                                                                                                                                                                                                                                                                                       OR TURFED IF EARTHWORKS ARE EXPECTED TO BE
                                                                                                                                                                                             THE TEST PIT EXPLORATION. THE ENGINEER MAY DIRECT EXISTING LOOSE                                                                        STANDARD MANUFACTURER'S FITTINGS ARE USED IN BOTH CASES.
                                                                             CLEARING OF VEGETATION                                                                                          FILL TO BE REMOVED AND RE-COMPACTED.
                                                                                                                                                                                                                                                                                                                                                                                                                                       DELAYED FOR MORE THAN 14 DAYS.
                                                                                                                                                                                                                                                                                                                                                                                                                                  f.   STRAW BALE SEDIMENT TRAPS ARE A SECONDARY OPTION
                                                                                                                                                                                                                                                                                                                            DN5.     FRC AND RCP SYSTEMS ARE CONSTRUCTED BY EMBEDDING THE LOWER PRECAST
                                                                             VE1.        NO CLEARING SHALL BE CARRIED OUT BEYOND THE EXTENT                                                                                                                                                                                                                                                                                            WHICH GENERALLY SHOULD NOT BE USED IF OTHER
                                                                                                                                                                                  EW11.      ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND                                                                         SECTION INTO A WET CAST-INSITU CONCRETE BASE. CUT OUTS FOR PIPE
                                                                                         OF EARTHWORKS OR WHERE NECESSARY FOR SERVICES                                                                                                                                                                                                                                                                                                 OPTIONS ARE AVAILABLE.
                                                                                                                                                                                             FULLY OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.                                                                                PENETRATIONS ARE MADE USING CONCRETE SAWS/DRILLS WHILE MINIMIZING
                                                                                         CONSTRUCTION WITHOUT THE WRITTEN APPROVAL OF THE
                                                                                                                                                                                                                                                                                                                                     DAMAGE TO THE ADJACENT PIPE MATERIALS.
                                                                                         SUPERINTENDENT.                                                                                                                                                                                                                                                                                                               SE2.   SEDIMENT CONTROL FENCE:
                                                                                                                                                                                  EW12.      ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED
                                                                                                                                                                                                                                                                                                                                                                                                                                  g. NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                             PRIOR TO COMMENCING EARTHWORKS.                                                                                                DN6.     LIDS TO CAST-IN-SITU MANHOLES ARE LIGHT DUTY, CLOSE FITTING BOLT DOWN
                                                                             VE2.        MILLABLE LOGS ARE TO BE REMOVED FOR SAWMILLING.                                                                                                                                                                                                                                                                                          h. NORMALLY LOCATED ALONG THE CONTOUR WITH A
                                                                                                                                                                                                                                                                                                                                     CAST IRON OR GALVANISED STEEL, CONCRETE INFILL TYPE (GATIC LIGHT DUTY,
                                                                                                                                                                                                                                                                                                                                                                                                                                      MAXIMUM CATCHMENT AREA 0.6 HA PER 100M LENGTH OF
                                                                                                                                                                                  EW13.      FILL DENSITY TESTING SHALL CONFORM TO THE FOLLOWING:                                                                                    POLYCRETE BROADSTEL OR SIMILAR) OF APPROXIMATELY THE SAME INTERNAL
                                                                             VE3.        SUITABLE MATERIAL IS TO BE MULCHED FOR REUSE ON SITE.                                                                                                                                                                                                                                                                                        FENCE.
                                                                                                                                                                                                   a. 1 TEST PER 500 cu.m - GENERALLY                                                                                                DIMENSIONS AS THE MANHOLE.
                                                                                                                                                                                                                                                                                                                                                                                                                                  i.  WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS
                                                                                                                                                                                                  b. 1 TEST PER 2 LAYERS PER 40m - TRENCH BACKFILL
                                                                                                                                                                                                                                                                                                                                                                                                                                      MAY BE USED ON SMALL WORK SITES, I.E. OPERATIONAL
                                                                             EARTHWORKS AND PAVEMENT                                                                                                                                                                                                                        DN7.     ALL STEEL GRATES AND FRAMES TO BE HOT DIPPED GALVANIZED AND SHALL BE
                                                                                                                                                                                                                                                                                                                                                                                                                                      PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE
                                                                                                                                                                                  EW14.      PLACEMENT OF FILL SHALL CONFORM TO THE FOLLOWING MINIMUM DRY                                                                            CYCLE PROOF IN ACCORDANCE WITH AS 3996.
                                                                             CONSTRUCTION NOTES                                                                                              DENSITY RATIO (M.D.D.R.) COMPACTION STANDARDS:
                                                                                                                                                                                                                                                                                                                                                                                                                                      SIGNIFICANT SEDIMENT RUNOFF IS NOT EXPECTED.
                                                                                                                                                                                                                                                                                                                                                                                                                                  j.  WHERE FENCES NEED TO BE LOCATED ACROSS THE
                                                                                                                                                                                                 c.   ALLOTMENTS = 98% STD                                                                                                  DN8.     LIDS MATCH FINISHED SURFACE GROUND SLOPE AND SIT PROUD AS SHOWN ON
                                                                             EW1.        THE CONTRACTOR SHALL PROVIDE CERTIFICATION FROM A RPEQ QUALIFIED                                                                                                                                                                                                                                                                             CONTOUR - REFER IPEAW STANDARD DRAWING D-0040 FOR
                                                                                                                                                                                                 d. ROAD VERGES/EMBANKMENTS = 98% STD                                                                                                THE LOCAL AUTHORITIES STANDARD AND ARE MARKED "STORMWATER"
                                                                                         ENGINEER THAT THE WHOLE OF THE EARTHWORKS AND GEOTECHNICAL                                                                                                                                                                                                                                                                                   DETAILS.
                                                                                                                                                                                                 e. PAVEMENT SUBGRADE = 100% STD FOR NON-COHESIVE                                                                                    IMPRESSED INTO THE CONCRETE INFILL. INFILL CONCRETE IS CLASS N25.
                                                                                         SUPERVISION COMPLIES WITH AS3798                                                                                                                                                                                                                                                                                                         k. FENCES ARE REQUIRED 2m MIN FROM TOE OF CUT OR FILL
                                                                                                                                                                                                      MATERIALS, M.D.D.R. = 80%
                                                                                                                                                                                                                                                                                                                                                                                                                                      BATTERS, WHERE NOT PRACTICAL ONE FENCE CAN BE AT
                                                                                                                                                                                                                                                                                                                            DN09.    UPVC PIPE AND KERB ADAPTORS ARE USED WHERE DISCHARGE IS INTO THE KERB
                                                                             EW2.        THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION                                                                                                                                                                                                                                                                                     THE TOE WITH A SECOND FENCE 1M MIN AWAY. FENCE
                                                                                                                                                                                  EW15.      ALL ALLOTMENTS OR AREAS SUBJECT TO EARTHWORKS ARE TO BE FREE                                                                            AND CHANNEL.
                                                                                         REPORT - (IF AVAILABLE)                                                                                                                                                                                                                                                                                                                      SHOULD NOT BE LOCATED PARALLEL WITH TOE IF
                                                                                                                                                                                             DRAINING WITH A MINIMUM SLOPE OF 1:100.
                                                                                                                                                                                                                                                                                                                                                                                                                                      CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
                                                                                                                                                                                                                                                                                                                            DN10.    INTER-ALLOTMENT DRAINAGE LINES ARE LOCATED 0.5 METRES FROM REAR OR
                                                                             EW3.        ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR                         EW16.      ALL EXISTING GRASSED AREAS DISTURBED DURING CONSTRUCTION SHALL                                                                          SIDE BOUNDARIES WITHIN THE PROPERTIES SERVED.
                                                                                         TO COMMENCING EARTHWORKS.                                                                                                                                                                                                                                                                                                     SE3.   TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP:
                                                                                                                                                                                             BE TOP SOILED TO A MINIMUM DEPTH OF 100mm AND TURFED OR SEEDED
                                                                                                                                                                                             WITH A MINIMUM STRIKE RATE OF 80% PRIOR TO ANY 'ON MAINTENANCE'                                                                                                                                                                      l. ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY
                                                                                                                                                                                                                                                                                                                            DN11.    MATERIALS AND CONSTRUCTION ARE IN ACCORDANCE WITH COUNCIL'S
                                                                             EW4.        THE LIMITS OF CUTTING AND FILLING SHALL BE GENERALLY AS SHOWN ON THE                                                                                                                                                                                                                                                                        FROM ENTRY/EXIT.
                                                                                                                                                                                             INSPECTION.                                                                                                                             STANDARD SPECIFICATION FOR STORMWATER DRAINAGE.
                                                                                         DRAWINGS. THE CONTRACTOR SHALL SET OUT THESE LIMITS FOR INSPECTION                                                                                                                                                                                                                                                                       m. WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING
                                                                                         BY THE ENGINEER PRIOR TO CONSTRUCTION. AMENDMENTS TO EARTHWORKS                                                                                                                                                                                                                                                                             WET WEATHER.
                                                                                                                                                                                  EW17.      ALL TEMPORARY STOCKPILES (IF APPLICABLE) TO HAVE 1:6 MAXIMUM SIDE                                                              DN12.    THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING WORK.
                                                                                         AND FINISHED SURFACE CONTOURS MAY BE ADJUSTED BY THE WRITTEN                                        BATTERS (GRASS SEEDED).
                                                                                         DIRECTION OF THE ENGINEER DURING CONSTRUCTION.                                                                                                                                                                                                                                                                                SE4.   SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES, INCORPORATE
                                                                                                                                                                                                                                                                                                                            DN13.    THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES AND LOCATE
                                                                                                                                                                                                                                                                                                                                                                                                                              TRAFFIC CONTROL DEVICES .
                                                                                                                                                                                                                                                                                                                                     ALL SERVICES BEFORE COMMENCING WORK.THE CONTRACTOR SHALL BE
                                                                             EW5.        SITE PREPARATION:                                                                 ROADWORKS NOTES                                                                                                                                           RESPONSIBLE FOR ANY DAMAGE CAUSED TO SERVICES BY THE WORKS
                                                                                         a. STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE ALL                                                                                                                                                                                                                                                                    SE5.   IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL
                                                                                                                                                                           RD1.      THE CONTRACTOR SHALL ESTABLISH THE LOCATION, LINE & LEVEL OF ALL PUBLIC                                                                         IRRESPECTIVE OF WHETHER THE SERVICES ARE SHOWN ON THE DRAWINGS OR
                                                                                              VEGETABLE MATTER TO THE BASE OF THE SUB GRADE.                                                                                                                                                                                                                                                                                  SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN
                                                                                                                                                                                     & PRIVATE UTILITY SERVICES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION.                                                                           NOT.
                                                                                                                                                                                                                                                                                                                                                                                                                              ADDRESSED AS STIPULATED IN THE ENVIRONMENTAL MANAGEMENT
                                                                                         b.     FURTHER EXCAVATE IF REQUIRED TO BOX OUT TO MINIMUM PAVEMENT                          WHERE UTILITY SERVICES ARE SHOWN ON THE PLANS, THEY ARE SHOWN FOR                                                                                                                                                                        PLAN. ADDITIONAL OR DIFFERENT SEDIMENT & EROSION CONTROL
                                                                                                THICKNESS. REMOVE AND RE-COMPACT FILL AS PER GEOTECHNICAL                            THE INFORMATION OF THE CONTRACTOR ONLY. THE PRINCIPAL SHALL NOT BE                                                                    UNDERGROUND SERVICES                                                                               DEVICES MAY BE REQUIRED DURING CONSTRUCTION PHASE TO
                                                                                                REPORT NOTE ON THIS DRAWING.                                                         LIABLE FOR ANY OMISSION OF SERVICES FROM THE PLANS OR THE ACCURACY OF                                                                                                                                                                    COMPLY WITH THE ABOVE.
                                                                                                                                                                                     ANY SERVICES SHOWN ON THE PLANS.                                                                                                      UNDERGROUND SERVICES HAVE BEEN LOCATED ONLY WHERE OBVIOUS. SOME SERVICES
                                                                                                                                                                                                                                                                                                                           THAT WERE NOT OBVIOUS AND ARE NOT SHOWN ON THE PLAN MAY STILL BE PRESENT. IT                SE6.   TEMPORARY STOCKPILES TO HAVE 1:6 SIDE BATTERS (MAXIMUM) AND
                                                                                         c.     COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98%
                                                                                                                                                                           RD2.      SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED THROUGH                                                                           IS THE RESPONSIBILITY OF ANY PERSON EXCAVATING / BUILDING, ON OR ADJACENT TO                       BE SHAPED TO ENSURE RUN-OFF IS TREATED AND MANAGED TO THE
                                                                                                STANDARD COMPACTION AS DEFINED IN AS 1289 IN THE TOP 200.                                                                                                                                                                  THE SITE TO CONFIRM WITH THE RELEVANT AUTHORITY THE LOCATION OF SERVICES.
                                                                                                                                                                                     COMPUTER MODELING OF FIELD SURVEY DATA. THESE CALCULATED LEVELS MAY                                                                                                                                                                      SATISFACTION OF THE SUPERINTENDENT. ALL EXPOSED STOCKPILE
                                                                                                                                                                                     VARY FROM THE ACTUAL GROUND LEVEL.                                                                                                    THE AUTHOR OF THIS PLAN ACCEPTS NO RESPONSIBILITY FOR DAMAGE TO SERVICES                           SURFACES TO BE GRASS SEEDED. SEDIMENT FENCES AND CUT-OFF
                                                                                         d.     COMPACT AND PROOF ROLL ALL PREPARED SUBGRADE AREAS PRIOR TO
                                                                                                                                                                                                                                                                                                                           SHOWN OR NOT SHOWN ON THIS PLAN.                                                                   DRAINS MAY BE REQUIRED.
                                                                                                PLACING ANY FILLING. COMPACTION SHALL BE 100% COMPACTION AS
                                                                                                MEASURED BY THE STANDARD METHOD DESCRIBED IN AS1289 UNO.                   RD3.      ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH
                                                                                                                                                                                     REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE PRINCIPAL'S                                                                                                          MIN TRENCH
                                                                                         e.     EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT SPOTS OR                          APPOINTED SURVEYOR.                                                                                                                                                   (OD + 1200mm)
                                                                                                HEAVING SUBGRADE AREAS. STRUCTURAL FILL SHALL BE APPROVED                                                                                                                                                                                                                                                                      NOTE:
                                                                                                GRANULAR FILL (100mm MAXIMUM PARTICLE SIZE, MINIMUM SOAKED CBR             RD4.      SUBGRADE EVALUATION IS TO BE UNDERTAKEN IN ACCORDANCE WITH THE
                                                                                                                                                                                                                                                                                                                                                                                                                               EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE DESIGNED
                                                                                                15 PLACED IN LAYERS NOT EXCEEDING 200mm AND COMPACTED TO                             PROCEDURES OUTLINED IN ARRB SR41 - A STRUCTURAL DESIGN GUIDE FOR
                                                                                                                                                                                                                                                                                                                                                                                                                               AND PROVIDED IN ACCORDANCE WITH THE INTERNATIONAL EROSION
                                                                                                                                                                                     FLEXIBLE RESIDENTIAL STREET PAVEMENTS.
                                                                                                ACHIEVE NOT LESS THAN 98 % MAXIMUM RELATIVE DRY DENSITY                                                                                                                                                                       BACKFILL                                                           BACKFILL                      CONTROL ASSOCIATION (AUSTRALASIA) 2018's "BEST PRACTICE
                                                                                                (STANDARD), OR 75 % DRY DENSITY INDEX IN ACCORDANCE WITH AS 1289.                                                                                                                                                                                                                                                              EROSION AND SEDIMENT CONTROL FOR BUILDING AND
                                                                                                                                                                           RD5.      ALL KERBING SHALL CONFORM TO LOCAL AUTHORITY COUNCIL'S RELEVANT
                                                                                                SITE FILLING MATERIAL AND COMPACTION UNDER THE PAVING AND                                                                                                                                                                                                                                                                      CONSTRUCTION SITE.
                                                                                                                                                                                     STANDARD DRAWINGS.                                                                                                                    OVERLAY 480mm                                                       OVERLAY 200mm
                                                                                                BUILDING SHALL BE AS ABOVE.
a:\2308-75 noosa drv noosa heads\acad civil preliminary\2308 - da.dwg




                                                                                                                                                                           RD6.      ALL ROADSIDE VERGE AREAS AND BATTERS SHALL BE TOP S OILED TO A
                                                                             EW6.        ALL FILLING SHALL BE CLEAN EXCAVATED MATERIAL FREE FROM TOPSOIL AND
                                                                                                                                                                                     MINIMUM DEPTH OF 100mm (LIGHTLY COMPACTED) AND TURFED.                                                                                 SIDE 342mm                                                          SIDE 682mm
                                                                                         VEGETATION.
                                                                                                                                                                           RD7.      PAVEMENT MARKINGS AND SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH THE                                                                  HAUNCH 180mm
                                                                             EW7.        THE EXISTING SITE WON MATERIALS MAY CONTAIN ROCKS AND COBBLES AND                                                                                                                                                                   BED 100mm                                                           BED 150mm
                                                                                         THESE SHALL BE EXCLUDED OVER 100mm NOMINAL SIZE IN ANY EXISTING                             QUEENSLAND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
                                                                                         MATERIAL USED AS FILLING.                                                                                                                                           Director:7736)
                                                                                                                                                                                                                                                             (RPEQ    TONY SHELLEY




                                                                                                                                                                                                                                                                                                                                                      RCP                 STORMPRO
                                                                                                                                                                           RD8.      PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE-WAYS,                                               Director:7736)
                                                                                                                                                                                                                                                                                                   (RPEQ    TONY SHELLEY




                                                                                                                                                                                     WHERE DIRECTED.                                                                                                                                                              600Ø
                                                                                                                                                                                                                                                                                                                                                                                                      PROJECT:                                                                JOB NUMBER
                                                                        REV DATE DESCRIPTION                                     BY    CHKD DRAWN
                                                                                                                                                I GDETAL
                                                                                                                                                       IS                                                  SCALE                                            APPROVED                                                                                                                                  PROPOSED MIXED USE DEVELOPMENT                                               2308
                                                                         A    04-07-23    INITIAL ISSUE                           BK     JP                                                                                                                                                                                                                                                           AT 2 BOTTLEBRUSH AVENUE, NOOSA HEADS
                                                                         B    31-07-23    FOR APPROVAL                            BK     JP    DATUM                AHD                                                                                                                                                                                                                                                                                                   SHEET:    2   OF   7
                                                                                                                                                                                                                                                                                                                                                                                                      FOR AJG PROPERTY DEVELOPMENT TRUST
                                                                                                                                              DESIGN                JP
                                                                                                                                                                                                                                                           .................                                                                                                                          DRAWING TITLE:                                                      DRAWING NUMBER         REV
                                                                                                                                              DRAWN                 BK

                                                                                                                                              DESIGN CHECK
                                                                                                                                                                                                                                                            Director: TONY SHELLEY
                                                                                                                                                                                                                                                                                                                                    p 07 5443 8285                                                    GENERAL NOTES                                                           R02                B
                                                                                                                                                                    JL                                                                                                               (RPEQ 7736)
                                                                                                                                                                             This drawing is not to be copied or amended without written permission from                                                                            e [email protected] w www.barlowshelley.com.au
                                                                                                                                              DATE            04-07-2023     Barlow Shelley Consulting Engineers                                                                                                                    a PO Box 899 Maroochydore 4558 ABN 89 215 591 077
Log in to download the original file

engineering.pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.