2019-12-11 SM Agenda - Item 1 - Attachment 6 - Section A - Final New Noosa Plan - Part 7 - Clean version
The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
PO17
Development facilitates the widening and upgrading of laneways No acceptable outcome provided.
in the Cooroy Local Plan Area to accommodate anticipated levels
of traffic. Where:
(a) access to development is taken from a laneway, a 2m
resumption from the laneway frontage is required for Editor's Note The design and upgrading of the laneway is done
widening and the laneway is to be upgraded to the in accordance with Council's Laneways Policy for Cooroy.
appropriate standard; or
(b) development is undertaken on a property with a laneway
frontage, and access is not taken, a 2m easement is
provided for future widening and upgrading purposes.
PO18
Development improves local connectivity by providing safe and No acceptable outcome provided
convenient pedestrian and bicycle pathways to and between key
destinations such as the town centre, railway station, community
and sports facilities and schools.
PO19 AO19
Development integrates with and extends the existing street and Development on land including or adjoining a key pedestrian/cycle
pathway networks including but not limited to those identified on link shown on Figure 7.2.2.4 (Cooroy Framework and Character
Figure 7.2.2.4 (Cooroy Framework and Character Plan) such that Plan) facilitates these connections.
connections to and between key local destinations are provided
and reinforced.
Environment, natural resource and recreation values Table 7.2.2.3 Table for Assessment Criteria
(part)
Performance outcomes Acceptable outcomes
Environment, natural resource and recreation values
PO20 AO20
Development has no significant adverse effects on biodiversity, Connecting Habitat Areas as identified on Map SFM4
natural vegetation, native fauna habitat, landscape quality, water Biodiversity (Strategic Framework Map) are protected from
quality or cultural heritage values, including those related to: fragmentation and encroachment by development.
(a) changes to natural drainage;
Editor’s Note— Council may request additional information on the
(b) disturbance to any of the wetland systems;
proposed method of effluent disposal to ensure the nature of the
(c) management of landslide and fire risk; development is compatible with environmental values. Refer to
(d) erosion and the transport of sediments offsite; PSP1 – Preparing a well made application..
(e) unmanaged public access;
(f) effluent disposal; and
(g) changes to fauna habitat and behaviour.
PO21 AO21
Development maintains and protects an integrated open space Open space corridors identified as Ecological Linkages and Major
network throughout the locality to— Recreation areas on Map SFM1 Settlement and Map SFM4
(a) provide for both passive and active recreational pursuits; Biodiversity (Strategic Framework) are enhanced and protected
from fragmentation and encroachment by development.
(b) provide connectivity for pedestrians, cyclists, and horse
riders;
(c) provide habitat connectivity for wildlife and fish passage;
(d) protect watercourses and drainage lines;
(e) protect vegetation on steep slopes; and
(f) form a scenic backdrop for residential development.
**FINAL DRAFT Post Consultation 2019**
Page 8 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.