Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 6 - Section A - Final New Noosa Plan - Part 7 - Clean version

of 54

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                                 Acceptable Outcomes

PO25                                                                 AO25
Development has no significant adverse effects on biodiversity,      Connecting Habitat Areas as identified on Map SFM­4
natural vegetation, native fauna habitat, landscape quality, water   ­ Biodiversity and Environment (Strategic Framework) are
quality or cultural heritage values, including those related to—     protected from fragmentation and encroachment by development.
(a)   changes to natural drainage;
(b)   disturbance to any wetland system;
(c)   management of landslide and fire risk;
(d)   erosion and the transport of sediments off site;
(e)   unmanaged public access; and
(f)   changes to fauna habitat and behaviour.

PO26                                                                 AO26
Development maintains and protects an integrated open space          Open space corridors identified as Ecological Linkages and Major
network throughout the locality to—                                  Recreation areas on Map SFM­1 ­ Settlement and Map SFM­4
(a)   provide for both passive and active recreational pursuits;     ­ Biodiversity (Strategic Framework) are enhanced and protected
                                                                     from fragmentation and encroachment by development.
(b)   provide connectivity for pedestrians and cyclists;
(c)   provide habitat connectivity for wildlife and fish passage;
(d)   protect watercourses and drainage lines;
(e)   protect vegetation on steep slopes; and
(f)   form a scenic backdrop for residential development.

Figure 7.2.3.4 ­ Tewantin Framework & Character Plan




Figure 7.2.3.5 ­ Contextual views
End of street vista (Diyan Street)




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 10 of 13
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 6 - Section A - Final New Noosa Plan - Part 7 - Clean version(PDF, 14MB).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.