Council archive · source document
Scg 27099(Sl) · MCU17/0512
From the archive 15 Arakoon MCU.zip, inside MCU - Detached House - MCU17/0512. File date in the archive: 2017-04-27 09:25.
edges of gullies. Also, the area adjacent the flanks of the gullies should be protected from scour via vegetation
and limiting surface grades.
All existing cross allotment flows from neighbouring properties must also be considered, managed and
maintained. Clear unhindered drainage paths must be provided and maintained during and beyond construction.
All constructed retaining walls must have effective drainage measures upslope and beyond the walls to relieve
any sub-surface water pressure/build-up. These drains must be maintained and flushed out regularly. To achieve
this we recommend bringing the upstream end of the drain to surface and capping off to allow future flush out.
We have attached guidelines for hillside construction extracted from Australian Geomechanics vol. 35 March
2000 – “Landslide Risk Management”. These references provide commentary on good design and building
practice.
We trust this meets with your requirements, however should you have any queries on the above matter please
contact the undersigned.
Yours faithfully
Sean Richardson RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS
Encs Appendix A - Some Guidelines for Hillside Construction
Appendix B - Landslip Mechanisms
Appendix C - Landslip Risk Assessment Matrix
SCG Consulting Engineers 5 SCG Ref: 27099(SL)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 27099(SL).pdfRelated documentApplication case desk ↗
About this file
- File size
- 467 KB (small file)
- File type
No other editions are linked here.