Attachment B - SCG Engineers Response
Attached to the e-mail Part Response to Information request - MCU20/0024 & OPW20/0055.
In referencing AS2890.1-2004 we have used a frontage road speed of 40km/hr. This is due to the tight
radius a car must travel through when approaching the proposed driveway. This will limit the vehicles
speed to probably less the 40km/hr. The minimum site distance at this speed is 30m which, is
achievable as shown on our revised documents.
Following further inspection of the site it has been decided to replace the existing section of internal
driveway. This has been shown on our revised documents.
Items 15 & 16 – Stormwater Treatment and Levels
The site area is less than 2500m2 which is the trigger for stormwater treatment. Regardless, we have
proposed the inclusion of a water tank for capture of roof runoff and re-use and the construction of inline
infiltration pits. These will in part limit nutrient and gross pollutant runoff from site.
We have included some additional surface levels on the proposed driveway drawings to confirm the
adequacy of the proposed stormwater drainage infrastructure.
We trust the above information and enclosed revised drawing will address Council’s request for information.
Please don’t hesitate to contact the undersigned should further information be required.
Yours faithfully
SEAN RICHARDSON - RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS
Enc SCG 30031 C1.1, C2.1, C3.1.A, C3.2 AND SW1.1.A
Cc: LM Cooney - By email: [email protected]
Martoo Consulting – By email [email protected]
SCG CONSULTING ENGINEERS 2 SCG REF: 30031(L1)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.