Skip to the record
Every meeting, every word.

Original source · versioned page text

Approved Plan - EXE21-0015

of 21

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

 

Clump of trees;
height selected
for distance
from house

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

— |. Drained
pathway

Carport

 

Path—+

 

 

 

 

 

 

 

Garden bed
covered with

[2 ay) mulch

pment
gp inca arrears
BUTT ete areenri
; a
areata

 

 

should extend outwards a minimum of 900 mm (more in highly
reactive soil) and should have a minimum fall away from the
building of 1:60. The finished paving should be no less than 100
mm below brick vent bases.

It is prudent to relocate drainage pipes away from this paving, if
possible, o-ayoid complications from future leakage, If this is not
pesaics. earthenware pipes should be replaced by PVC and

ackfilling should be of the same soil type as the surrounding soil
and compacted to the same density,

Except in areas where freezing of water is an issue, it is wise to
remove taps in the building area and relocate them well away from
the building — preferably not uphill from it (see BTF 19).

It may be desirable to install a grated drain at the outside edge of the
paving on the uphill side of the building. IF subsoil drainage is
needed this can be installed under the surface drain.

Condensation

In buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particularly where thete is little clearance berween the
floor and the ground. Condensation adds ro the moisture already
present in the subfloor and significantly slows the process of drying
our. Installation of an adequate subfloor ventilation system, either
natural or mechanical, is desirable.

Warning: Although this Building Technology File deals with
cracking in buildings, it should be said thar subfloor moisture can
result in the development of other problems, notably:

© Water that is transmitted into masonry, metal or timber building
elements causes damage and/or decay to those elements.

* High subfloor humidity and moisture content create an ideal
environment for various pests, including termites and spiders.

¢ Where high moisture levels are transmitted to the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be a
health hazard to inhabitants, particularly those who are
abnormally susceptible to respiratory ailments.

The garden

‘The ideal vegetation layout is to haye lawn or plants that require
only light watering immediately adjacent to the drainage or paving
edge, then more demanding plants, shrubs and trees spread out in
that order.

Overwatering due to misuse of automatic watering systems is a
common cause of saturation and water migration under footings. If
it is necessary to use these systems, it is important to remove garden
beds to a completely safe distance from buildings.

Existing trees

Where a tree is causing a problem of soil drying or there is-the
existence or threat of upheaval of footings, if the offending roots are
subsidiary and their removal will nor significantly damage the tree,
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent furure root growth in the direction of
the building. IF it is not possible co remove the relevant roots
without damage to the tree, an application to remove the tree should
be made to the local authority. A pradent plan is to transplant likely
offenders before they become a problem.

Information on trees, plants and shrubs

State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gatdens are also sources of
information. For information on plant roots and drains, see Building
Technology File 17.

Excavation

Excavation around footings must be properly engineered. Soil
supporting footings can only be safely excavated at an angle that
allows the soil under the footing to remain stable, This angle is
called the angle of repose (or friction) and varies significantly
between soil types.and conditions. Removal of soil within the angle
of repose will cause subsidence.

peomesiauce

Where erosion has occurred that has washed away soil adjacent to
footings, soil of the same classification should be introduced and
compacted to the same density, Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
specialist consultant.

Where isolated footings rise and fall because of swell/shrink effect,
the homeowner may be tempted to alleviate floor bounce by filling
the gap that has appeared between the bearer and the pier with
blocking. The danger here is thar when the next swell segment of the
cycle occurs, the extra blocking will push the floor up into an
accentuated dome and may also cause local shear failure in the soil.
IF it is necessary to use blocking, it should be by a pair of fine
wedges and monitoring should be cartied out fortnightly.

This BTF was prepared by John Lewer FAIB, MIAMA, Partner,
Construction Diagnosis.

 

The information in this and other issues in the series was derived from various sources and was believed to be correct when published.

The information is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject.

Further professional advice needs to be obtained before taking any action based on the information provided.

Distributed by

 

CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia

Freecall 1800 645 051

Tel (03) 9662 7666

Fax (03) 9662 7555 www.publish.csiro.au

Email: [email protected]

© CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited
Log in to download the original file

Approved Plan - EXE21-0015.pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.