          Raul Weychardt

           TPC 1966 (97)
           TPC 1906


                                                                           17th December,   1987



                 Paul Harbour,
                 510 Lorikeet Drive,
                 PEREGIAN BEACH. Q. 4573


                 Dear Sir,

                 Re:     Application for Town Planning Consent (TPC 1906 and TPC 1966)

                 I refer to the above application and advise that Council at its meeting
                 held on the 15th December, 1987 resolved to:-

                 (A)     Agree to modify TPC 1906, Illycombe Pty. Ltd., for a multiple dwelling
                         of 15 units situated at 299 Weyba Road, Noosaville by permitting
                         access to an adjoining allotment to be provided across the site with
                         subsequent adjustment to the car parking layout.

                 (B)     Approve TPC 1966,    P. Harbour for 15 multiple dwelling units at 299
                         Weyba Road, Noosaville (with access over adjoining 295 Weyba Road)
                         described as Lot 7 on R.P. 41301, Parish of Weyba, subject to the
                         following conditions

                         1.      Submission to and approval by Council of building plans in
                                 accordance with the Building Act, Council's By-laws and Policies,
                                 and generally in accordance with the plan approved in this
                                 Consent and the Shire of Noosa Town Planning Scheme apart from
                                 where amendments are required by dispensations or have been
                                 granted in conjunction with this Consent.

                         2.      The developers of both properties are to provide a covenant to
                                 Council to grant common usage to pool and spa facilities. Note -
                                 The spa is to be located a minimum of 1.5 metres from Council's
                                 sewer.

                         3.      An easement for access purposes      is   to   be provided over the
                                 adjoining lot at 295 Weyba Road.




Document Set ID: 21112737
Version: 1, Version Date: 06/04/2020
Full text of the other 4 pages

Page 2

           %



                 Paul Harbour          TPC 1906 & TPC 1966   17th December,   1987 - Page 2


                         4.      Provision of at least twenty (20) off-street car parking spaces,
                                 comprising 15 covered spaces and 4 uncovered spaces, and access
                                 thereto which are to be provided with a sealed pavement and
                                 designed, drained, constructed and maintained in accordance with
                                 the   Town    Planning Scheme, Council's Policies and to the
                                 reasonable satisfaction of the Shire Engineer,         Plans and
                                 specifications for these works are to be submitted to the Shire
                                 Engineer    for approval    in  conjunction with the Building
                                 Application. Note: Carports over the sewer are to be constructed
                                 in   a manner to enable easy dismantling in the event of
                                 maintenance required to the sewer. Carports are to be paved or
                                 have similar floor material capable of being temporarily removed.

                         5.      There is to be no detrimental effect upon the amenity of the
                                 neighbourhood by reason of the creation of excessive noise,
                                 lighting nuisance or other emissions.

                         6.      The open space and setback areas are to be landscaped in
                                 accordance with the Noosa Design Manual and a properly prepared
                                 landscaping plan to be submitted to and approved by the Shire
                                 Planner, prior to the issue of a Building Approval. Such
                                 landscaping is to be completed in accordance with the approved
                                 landscaping plan, prior to the premises being occupied and
                                 maintained at all times thereafter to the reasonable satisfaction
                                 of the Shire Planner.

                         7.      Existing trees are to be retained, except where required to be
                                 removed due to building operations or the conduct of the approved
                                 use.

                         8.      Construction work is permitted only during the hours of 7.00 a.m.
                                 to 6.00 p.m. Monday to Saturday, except where extended hours are
                                 approved by the Building Surveyor.

                         9.      Any advertising sign or device is to comply with the provisions
                                 of the Noosa Design Manual.

                         10.     Payment of contributions in accordance with Council1s Policy on
                                 Water Supply and Sewerage Headworks, current at the time of
                                 Building Approval. Calculations based upon the current Policy
                                 including   Price Index variation as at December,     1987 are
                                 estimated as follows

                                 Water Supply - $25,927
                                 Sewerage     - $10,51 1

                                 TOTAL:         $36,438




Document Set ID: 21112737
Version: 1, Version Date: 06/04/2020

Page 3

           i.

                 Paul Harbour          TPC 1906 & TPC 1966   17th December,   1987 - Page 3


                                 If payment is not proposed to be made prior to the issue of
                                 Building Approval, a cash bond or trading bank guarantee for the
                                 required amount is to be lodged prior to the release of that
                                 Approval.    The contribution is then required to be made within
                                 fourteen (14) days of the issue of Building Approval.

                          11.    Construction of roadworks, drainage and footpath improvements
                                 across the full frontage/frontages of the development to the
                                 satisfaction of the Shire Engineer. Such works shall involve the
                                 construction of kerb and channel, bitumen widening, associated
                                 drainage, hot mix correction to the existing pavement, where
                                 required and footpath upgrading works. In this regard, plans
                                 prepared by a registered Civil Engineer are to be submitted to
                                 and approved by the Shire Engineer, prior to commencement of
                                 construction. Council may accept a contribution in lieu of these
                                 works.

                          12.    The developer shall bear the cost of alteration of any public
                                 utility or facilities necessitated by the development of the land
                                 or associated construction works external to the site.


                          13.    The footpath to the frontage of the site is to be upgraded/fully
                                 paved with a minimum construction width of 1.2 metres to the
                                 satisfaction of the Shire Engineer.

                          14.    In accordance with Council Policy, the applicant shall contribute
                                 $2876 plus P.I. variations from December,       1987 towards the
                                 construction of Council's stormwater drainage system at the
                                 intersection of Weyba Road and Gympie Terrace.  Such contribution
                                 shall be made prior to the issue of a Building Permit.

                          15.    Connection to Council's existing water supply and sewerage
                                 reticulation systems at the developer's expense to the standards
                                 and requirements of Council's Shire Engineer.

                         16.     Floor levels for all buildings and other structures, car park
                                 areas and fill levels for the site are to be in accordance with
                                 the requirements of the Shire Engineer. Such levels shall be
                                 provided on application to the Council's Engineering Department.
                                 Any filling or other development works undertaken on the site
                                 shall be carried out so as not to cause the ponding of water on
                                 any adjoining lands and the blockage or interference with any
                                 natural watercourses.    No earthworks or filling works are to be
                                 undertaken until issue of a Building Approval.

                         17.     Roof and surface water is to be collected on site and to be
                                 discharged through a single underground drain line into existing
                                 drainage in Weyba Road to the satisfaction of the Shire Engineer.




Document Set ID: 21112737
Version: 1, Version Date: 06/04/2020

Page 4

                 Paul Harbour           TPC 1906 S TPC 1966   17th December,   1987 - Page 4


                          18.     In accordance with Council Policy, the applicant shall contribute
                                  $2876 plus P.I. variations from December,       1987 towards the
                                  construction of Council's stormwater drainage system at the
                                  intersection of Weyba Road and Gympie Terrace. Such contribution
                                  shall be made prior to the issue of a Building Permit.

                          19.    Provision of approved refuse containers in accordance with the
                                 requirements of the Refuse Management Regulations of 1983 for the
                                 storage and collection of refuse to the satisfaction of Council's
                                 Health Surveyor.

                          20.    Provision of an imperviously paved, drained and enclosed area to
                                 accommodate all refuse containers to the reasonable satisfaction
                                 of Council's Health Surveyor. This area is to be aesthetically
                                 screened from any road frontage or adjoining property boundary
                                 and is to be setback a distance of two (2) metres from any road
                                 frontage. A suitable hosecock and hoses to be located in the
                                 vicinity of the refuse container area.

                         21.     Any flat, or unit intended to be let out for fee or reward is to
                                 be   licenced   annually with Council's Health Department in
                                 accordance with the provisions of Chapter 43 of Council's By-Laws
                                 prior to such letting.

                         22.     The swimming pool shall be licensed annually with the Council's
                                 Health Department in accordance with the provisions of Chapter 42
                                 of Council's By-Laws.

                         23.      Submission of a cash bond or trading bank guarantee to the sum of
                                  $40,000, prior to the issue of Building Approval:

                                  (a)   against payment of water supply and sewerage headworks
                                        charges $35,000.
                                  (b)   to secure performance of conditions $5,000.


                                 The cash bond or trading bank guarantee may be returned to the
                                 applicant upon payment of the required sums and performance of
                                 the conditions of approval.

                         24.     The provisions of this Town Planning Consent are to be effected,
                                 prior to the commencement of the specific use granted under this
                                 Council reserves the right to call upon the bond or guaranteed
                                 sum referred to in this approval for the purposes of litigation
                                 should the use not be conducted in accordance with this Approval.




Document Set ID: 21112737
Version: 1, Version Date: 06/04/2020

Page 5

           "K - *
                 Paul Harbour          TPC 1906 & TPC 1966   17th December,   1987 - Page 5


                         25.     This Consent may be revoked pursuant to Section 33 (16D) of the
                                 Local Government Act if substantial progress has not been made in
                                 the erection of any building or other structures in accordance
                                 with this Consent or the rights conferred by this Consent are not
                                 exercised in accordance with this Consent within two (2) years of
                                 the date thereof.

                          26.    Access to the adjoining property at 295 Weyba Road is to be
                                 constructed to Main Roads Department requirements.

                 No objections to the proposal were lodged with Council as a result of the
                 advertising of the application. Please find attached copies of parts of
                 the Local Government Act which outline appeal rights in relation to
                 Council's decision.


                                                                          Yours faithfully,



                                                                          D.J. Philpot
                                                                          SHIRE CLERK




Document Set ID: 21112737
Version: 1, Version Date: 06/04/2020

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

ECM_21112737_v1_TPC1966 Approval.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.