Paul Harbour TPC 1906 & TPC 1966 17th December, 1987 - Page 3
If payment is not proposed to be made prior to the issue of
Building Approval, a cash bond or trading bank guarantee for the
required amount is to be lodged prior to the release of that
Approval. The contribution is then required to be made within
fourteen (14) days of the issue of Building Approval.
11. Construction of roadworks, drainage and footpath improvements
across the full frontage/frontages of the development to the
satisfaction of the Shire Engineer. Such works shall involve the
construction of kerb and channel, bitumen widening, associated
drainage, hot mix correction to the existing pavement, where
required and footpath upgrading works. In this regard, plans
prepared by a registered Civil Engineer are to be submitted to
and approved by the Shire Engineer, prior to commencement of
construction. Council may accept a contribution in lieu of these
works.
12. The developer shall bear the cost of alteration of any public
utility or facilities necessitated by the development of the land
or associated construction works external to the site.
13. The footpath to the frontage of the site is to be upgraded/fully
paved with a minimum construction width of 1.2 metres to the
satisfaction of the Shire Engineer.
14. In accordance with Council Policy, the applicant shall contribute
$2876 plus P.I. variations from December, 1987 towards the
construction of Council's stormwater drainage system at the
intersection of Weyba Road and Gympie Terrace. Such contribution
shall be made prior to the issue of a Building Permit.
15. Connection to Council's existing water supply and sewerage
reticulation systems at the developer's expense to the standards
and requirements of Council's Shire Engineer.
16. Floor levels for all buildings and other structures, car park
areas and fill levels for the site are to be in accordance with
the requirements of the Shire Engineer. Such levels shall be
provided on application to the Council's Engineering Department.
Any filling or other development works undertaken on the site
shall be carried out so as not to cause the ponding of water on
any adjoining lands and the blockage or interference with any
natural watercourses. No earthworks or filling works are to be
undertaken until issue of a Building Approval.
17. Roof and surface water is to be collected on site and to be
discharged through a single underground drain line into existing
drainage in Weyba Road to the satisfaction of the Shire Engineer.
Document Set ID: 21112737
Version: 1, Version Date: 06/04/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ECM_21112737_v1_TPC1966 Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.