Original source · versioned page text
Architecturals - REV C
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
EXTERNAL CONCRETE SCHEDULE LEGEND - INTERNAL
Mark Description Area Comments AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
EXC1 EXPOSED AGGREGATE 14.24 m² PORCH C'BD - CUPBOARD
DP - DOWNPIPE
EXC2 BROOM FINISH FOR TILE OVER 33.97 m² SOUTH PATIO DW - DISHWASHER PROV.
EXC3 BROOM FINISH FOR TILE OVER 29.75 m² NORTH PATIO FW - FLOOR WASTE
GAS - GAS CONNECTION
EXC4 EXPOSED AGGREGATE 13.74 m² SOUTH PATH 1 HP - HOT PLATE
HWS - HOT WATER SYSTEM
EXC5 EXPOSED AGGREGATE 7.55 m² SOUTH PATH 2 L - LINEN
EXC6 EXPOSED AGGREGATE 6.35 m² NORTH PATH 1 MH - MANHOLE
MW - MICROWAVE PROV.
EXC7 EXPOSED AGGREGATE 20.25 m² NORTH PATH 2 OHC - OVERHEAD CUPBOARD
PTY - PANTRY
EXC8 EXPOSED AGGREGATE 1.87 m² SOUTH LAUNDRY R - ROBE
EXC9 EXPOSED AGGREGATE 1.77 m² NORTH LAUNDRY REF - REFRIDGERATOR SPACE
RH - RANGEHOOD
EXC10 EXPOSED AGGREGATE 0.64 m² SOUTH HWS SH - SHELF
TR - TOWEL RAIL
EXC11 EXPOSED AGGREGATE 0.64 m² NORTH HWS TRH - TOILET ROLL HOLDER
Grand total: 11 130.76 m² UBO - UNDER-BENCH OVEN
WO - WALL OVEN
LEGEND - EXTERNAL
BV - BRICK VENEER
BL - BLOCKWORK
CO - CUSTOM ORB SHEETING
FC - FIBRE CEMENT SHEETING
HF - HARDIFLEX CLADDING
LB - LINEA-BOARD CLADDING
RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
RBL - RENDERED BLOCKWORK
SM - SYCON MATRIX PANELING
TB - TIMBER BATTENS
1500 800 WB - WEATHERBOARD (AS SPEC)
3000
1950 EXC11
EXC9
800
6220 800
900
920
1160
2080
EXC10 EXC8 EXC1 DN150
5482
900
800
920
DN150
A/C POSITION
2412 GHD
DN150
DN150
2436SGD
DN150 DN150 DN150
DN150
2421SGD 2421SGD 2440SGD
2436SGD
DN150
1500
EXC7
2440SGD EXC3
2000
EXC4
4570
DN150 DN150
2436SGD 2421SGD
1500
1500
1509
EXC5 EXC6
REVISIONS
EXC2 4230 5380 13500
# DATE DETAILS
A 04-03-20 WD FIRST ISSUE
B 18-03-20 REVISIONS
4200
C 25-03-20 REVISIONS
4700 1240 5960 5000 po box 418 p (07) 5442 6413
cooroy q 4563 f (07) 5442 6549
QBSA 1083000
This plan remains copyright to
Ausmar Group and may not be
used in part or in whole without
the written consent of the
author. © 2015 Ausmar Group
WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE
EXTERNAL
CONCRETE
PROJECT DESCRIPTION:
Proposed Display For:
CLIENT:
BRENDAN AND JESS
BEDFORD
SITE ADDRESS:
LOT 3, 5 FIGBIRD CT
LAKE MACDONALD
EXTERNAL CONCRETE UBD REF
(i) WAFFLE POD SLAB SYSTEM TO PROPOSED DWELLING TO ENGINEERS DESIGN DRAWN BY S HOSKINS
AND SPECIFICATIONS SCALE JOB CODE
(ii) CONCRETE PATHS TO FALL AWAY FROM FOOTINGS AT 1:20 MAXIMUM 1 : 100 ON A2
(iii)
(iv)
SAND BED UNDER PATHS AS REQUIRED
10MM FOAM EXPANSION JOINT TO ALL AREAS WHERE EXTERNAL CONCRETE
DATE
04-03-20
D-BJB2
MEETS MAIN HOUSE SLAB
SHEET 13 OF 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.