Appendix D: Engineering Works Codes
TRANSPORT, ROADS AND DRAINAGE CODE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS COMMENTS
carriageway for all users; e) shared parking / bicycle lane;
ii. conveys road pavement run-off to stormwater f) contra flow bicycle lane; and
drainage in a manner that allows the road to be g) bus/bicycle lane.
trafficable in Q100 ARI local rainfall events; and
d) verges and footpaths provide— S7.4 The provision of bicycle lanes at intersections
i. safe access for pedestrians and cyclists clear of is generally in accordance with AUSTROADS Part
obstructions; 14, section 5 and the Manual of Urban Traffic
ii. an access area for vehicles onto properties; Control Devices (MUTCD) Part 9.
iii. a corridor allocated for services and utilities; and
iv. additional amenity for minor roads.
O8 Stormwater drainage infrastructure is planned, S8.1 Stormwater drainage planning, design and Not applicable. The proposed development is of a
designed and constructed to— construction is in accordance with Section 4 of scale and density which is reasonably consistent with
a) be accessible, cost effective and easily PSP5 Engineering Design Standards – Roads, the site zoning. The proposed development covers a
maintainable; Drainage and Earthworks; AND single allotment. External stormwater drainage
b) protect downstream capacity; S8.2 As Constructed data is submitted in infrastructure will not be upgraded.
c) protect downstream water quality; accordance with Section 6 of PSP5 Engineering
d) maximise on-site stormwater retention and Design Standards – Roads, Drainage and
retardation; and Earthworks; AND
e) convey run-off to stormwater drainage in a manner S8.3 Stormwater drainage planning, design and
that allows roads to be trafficable in Q100 ARI local construction is in accordance with the Queensland
rainfall events Urban Drainage Design Manual.
O9 Roads and stormwater drainage infrastructure is S9.1 Roads and stormwater drainage infrastructure Not applicable. The proposed development is of a
constructed— is constructed in accordance with— scale and density which is reasonably consistent with
a) in accordance with appropriate engineering a) Sections 2, 3 and 4 of PSP5 Engineering Design the site zoning. The proposed development covers a
standards; and Standards – Roads, Drainage and Earthworks; single allotment. Road and stormwater drainage
b) to minimise adverse environmental impacts, b) Queensland Design Code for Residential Streets; infrastructure construction is not proposed.
including from run-off and erosion. c) AUSTROADS; or
d) A combination of the principles in these
documents; AND
S9.2 Erosion and sediment control measures are
designed and implemented in accordance with the
Institution of Engineers Australia (Queensland
CadCon Surveying & Town Planning
Page 16 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0045 & OPW14/0268: Appendix D - Engineering Works codesRelated documentApplication case desk ↗
About this file
- File size
- 193 KB (small file)
- File type
No other editions are linked here.