Council archive · source document
MCU14/0045 & OPW14/0268: Appendix D - Engineering Works codes
Appendix D: Engineering Works Codes
WATER SENSITIVE DESIGN CODE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS COMMENTS
surface; surfaces. Storage devices will not be provided as per
the Queensland Development Code.
O3 Captured water is utilised for all non-potable uses S3.1 Captured water is plumbed to be available for Not applicable. Storage devices will not be provided as
on site; AND all external uses including gardening, irrigation, per the Queensland Development Code.
ponds, filling swimming pools and outdoor cleaning,
as well as all ground floor toilet cisterns and
washing machine cold taps; AND
S3.2 Where the captured water is used for toilet
flushing and/or laundry use, an automatic or manual
interchange device that allows alternate use of
captured water or the reticulated water supply is
installed to ensure that there is a continual supply of
water for sanitary flushing and laundry use.
O4 On-site detention does not adversely impact on S4.1 No solution provided Not applicable. The site does not discharge to an
water requirements downstream of the site where the ecologically significant area.
water is required to sustain the ecology and
hydrology of downstream systems (environmental
flows); AND
O5 Within the Shire Business Centre site, as shown S5.1 No solution provided Not applicable. The site is not located within the Shire
on Map SBC, on-site detention measures are Business Centre.
contained within the developed areas of the site,
clear of drainage lines and Open Space Precincts.
Run-off treatment S6.1 & S7.1 Development complies with the water The site does not discharge to an ecologically
O6 Run-off that leaves the site is treated so as not to quality standards in Table 2 of the SEQ Regional significant area and will have negligible impact on
adversely impact on the ecology and hydrology of Plan Implementation Guideline No. 7 for Water downstream environmental flows. Impervious areas will
downstream environmental flows; AND Sensitive Urban Design. be directed to landscape or other pervious areas as
O7 Within the Shire Business Centre site, as shown practical prior to discharging from the site. It is
on Map SBC— considered that this is appropriate given the scale and
a) run-off treatment occurs within the site ; and density of the proposed use.
b) drainage lines are only used for final polishing of
run-off.
CadCon Surveying & Town Planning
Page 23 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0045 & OPW14/0268: Appendix D - Engineering Works codesRelated documentApplication case desk ↗
About this file
- File size
- 193 KB (small file)
- File type
No other editions are linked here.