Skip to the record
Search everything, all in one place.

Council archive · source document

001A5368.001

of 16

Text shows just the words. Original shows the document exactly as it was published.

Text sections not matched to the original PDF pages. See original document to check page numbers.

                                             Officer:          Ronald Read
                                             Direct Telephone: (07) 5449 5263
                                             Response Address: PO Box 141, Tewantin QLD 4565
                                             Email:            [email protected]
                                             Our Reference:    2007/2555
                                             Your Reference:
21 April 2009

Opus Qantec McWilliam Pty Ltd
PO Box 99
SPRING HILL QLD 4004




Dear Sir/Madam,

                                      Decision Notice
                                 Integrated Planning Act 1997
I refer to your application and advise that on 12 February 2009 Council decided to approve the
application subject to conditions.
Details of the decision are as follows:

1     APPLICATION DETAILS

 Application No:                     2007/2555
 Street address:                     27 Attunga Heights NOOSA HEADS
 Real property description:          LOT: 27 RP: 89506
 Planning Scheme:                    The Noosa Plan

2     DECISION DETAILS
The following type of approval has been issued:
      Preliminary Approval for Operational Works - Drainage, Stormwater, Vegetation Clearing,
      Water & Sewerage, Earthworks, Access & Parking

3     RELEVANT PERIOD OF APPROVAL
The relevant period for this Preliminary Approval is one year and lapses on 21 April 2010 unless an
application to extend the currency is approved by Council.

4     ASSESSMENT MANAGER CONDITIONS

1.    The applicant is required to lodge a further application for Operational Works in order to obtain
      a Development Permit. The development permit will be issued upon payment of the
      outstanding contributions and bonds required by the conditions of Decision Notice Ministerial
      Call-In dated 6 March 2006 (council’s file 23677DA) and will be subject to the conditions
      contained herein.

Land Development
2.    The development shall be carried out in accordance with the approved plans listed below or as
      modified herein.


                                                                                                   Page 1 of 16
Full text of the other 15 sections

Section 2

3.    The construction and operational phase must be carried out, in accordance with the Attunga
      Heights Detailed Environmental Management Plan (EMP) - Attunga Heights Residential
      Development – by Chenoweth Environmental Planning & Landscape Architecture dated 20
      January 2009, and any subsequent amendments approved by Council, except where modified
      by the conditions contained herein.
4.    Construction works shall be carried out in accordance with the Construction Management Plan
      – Attunga Heights – by Opus Qantec McWilliam revised 25 February 2008 and subsequent
      amendments approved by Council.
5.    The temporary crossing will be constructed generally in accordance with the methodology
      contained in the email from Mike Gould of Opus Qantec McWilliam dated 21 April 2008 and
      shall ensure that any machinery should not be allowed to come into contact with the existing
      surface of the creek/watercourse and its banks and if necessary the rock will be removed by
      hand. These works are only to allow access for the permanent bridge construction and will be
      removed as soon as possible and generally in accordance with the timeframe set out in the
      email from Mike Gould of Opus Qantec McWilliam dated 26 March 2008. The methodology
      and timeframe should be included in the construction management section of the EMP to be
      submitted for approval.
6.    The document titled “Attunga Heights, Noosa Stormwater and Water Quality Management
      Plan” by Opus Qantec McWilliam dated December 2007, shall be amended and submitted for
      approval prior to the commencement of the works on site. The following matters are to be
      addressed in the amended document:
      b.   Diagrams of the entire development indicating the treatment train for the construction
           stages and the operational phase of the development shall be included and shall show
           approximate location of all tanks, lines, gross pollutant traps, infiltration swales etc.
      c.   Detail shall be included describing the appropriate type and location of discharge points
           for rainwater tanks overflows to ensure that no scouring of the creek/watercourse or
           slope will occur.
      d.   A section shall be included addressing how the impact of fertilisers will be managed to
           ensure that water quality objectives for nutrient levels are to be met.
      e.   Detention shall be added to ensure that no increase in flows occurs even for the Q2 and
           Q5 events.
      f.   Results
      g.   of all modelling shall be verified using data from the Tewantin rainfall gauge.
7.    The Car Parking Layout Plan shall be revised to indicate the provision of three (3) motor
      cycle/bicycle spaces as required by condition No 69 of Ministerial Decision.
8.    Regular maintenance must be carried out on all sediment controls including testing and
      treatment as required by the EMP or additional testing and treatment as required by Council’s
      Chief Executive Officer (CEO).
9.    The use of “hay bales” is not permitted for sedimentation control however the use of “straw
      bales is permitted.
10.   All disturbed areas are to be revegetated by hydromulching within 10 days following the
      completion of earthworks. Additional hydromulching maybe needed as required by the
      Council’s CEO.
11.   The construction of the proposed retaining and supporting walls shall not have any adverse
      affects on the stability of adjoining lands. In this regard a Registered Professional Engineer
      Queensland shall supervise the structural works of the site and the construction of the new
      works to determine whether any additional measures are required to protect the stability of
      adjoining lands.


                                                                                             Page 2 of 16

Section 3

12.   Certification of the completed structural works must be provided to Council by the supervising
      engineer The certification shall state that the completed works conform with all aspects of the
      design and that the completed works, including on site infrastructure, will not have any
      adverse affects on the stability of proposed buildings and/or structures and/or services and/or
      lands.
13.   Further protection of the creek banks at stormwater outlets may be required as directed by
      Council’s CEO, to avoid any possibility of erosion of the creek banks occurring.
14.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
      installed into the first existing external downstream stormwater structure in both directions of
      Alma Way.
      These devices are to be checked and cleaned on a regular basis and specifically after each
      rain event.
      These devices are to remain in place during the civil works and construction phases of the
      development.
      The location and type of device to be installed shall be established at the “pre start” meeting
      with Council’s Construction Technical Officer and shall be installed prior to the commencement
      of any works.
15.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of works.
16.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
17.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
18.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).         The consulting engineers are responsible for arranging all
      inspections, with Council’s Construction Technical Officer or nominated staff.
19.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
20.   An inspection is to be carried out with the relevant Council officers, the Contractor and
      Supervising Engineer after pegging the extents of the development has been established, and
      prior to clearing being carried out. This inspection is to deal with the limits of clearing to be
      carried out for this development. This meeting is to take place prior to the “Pre-start” meeting.
21.   Council standards shall apply to these works unless otherwise modified herein.
22.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Council’s CEO and shall forthwith rectify the damage to that property or
      facility at its cost and to the satisfaction of the Council’s CEO.




                                                                                            Page 3 of 16

Section 4

      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
      commencement of the use.
      In the case of any emergency the Council shall be entitled to rectify such damage at the cost
      of the Applicant, such cost being paid prior to the commencement of the use.
23.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
24.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Council’s CEO or his nominee.
25.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
26.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing No. N-B7416-C1-01-02B and Site Based
      Sediment & Erosion Management Plan by Opus Qantec McWilliam revised 25 February
      2008, it is the site's supervising engineer who is responsible for ensuring that the sediment
      and erosion control measures have been designed by an RPEQ or CPESC and constructed:
      a.   i.     In accordance with "best practise" methods,
      b.   ii. Revised by an RPEQ or CPESC to address the issues raised by changes in the
           projected construction schedule and methods,
      c.   iii.   Revised to address predicted rainfall events, and
      d.   iv.    Achieve the desired environmental outcomes.
      Council’s CEO may request further controls to be installed should approved measures be
      inefficient.
27.   The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
      traps in accordance with the manufacturers’ specifications.
28.   The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant
      traps on a weekly basis and after each storm event.
29.   The owners of the subject property shall enter into an ongoing maintenance contract with a
      Registered Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps
      on a regular three monthly cycle and on a “On Call” basis in the case of an emergency.
30.   The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be
      included in the Community Management Scheme for the completed development.
31.   All stormwater drainage lines including private drainage lines (also known as inter-allotment
      drainage lines) or as otherwise approved by Council’s CEO shall be inspected by closed
      circuit television (CCTV) at the completion of all works and immediately prior to acceptance
      ‘On Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of
      this inspection.
      A report of the CCTV inspection, including photographic records (which includes photos &
      video recordings burnt onto a CD) of the inspection shall be submitted to the Council for
      approval. Any defects or substandard works shall be recorded and accurately illustrated on
      the drainage plan showing the location of the defect(s).



                                                                                           Page 4 of 16

Section 5

      Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
      applicants expense with a further CCTV inspection arranged once the rectification works have
      been completed.
      To this extent all CCTV inspections, including any additional inspections necessary following
      defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
      incurred by Council in reviewing the CCTV inspection results shall also be borne by the
      applicant.
32.   Prior to acceptance of civil works "On Maintenance", the lodgement of satisfactory “As
      Constructed” records shall be submitted to Council.
      As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
      level and type of all services and structures. All of which shall be submitted to Council for
      checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering
      Design Standards – Roads, Drainage and Earthworks.
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
33.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
      be imposed on construction works during the maintenance period, which is a minimum period
      of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
      Developer for the works.
34.   The works will not be accepted "On Maintenance" until the landscaping is completed.
35.   These works are also to be in compliance with the relevant conditions of Decision Notice
      Ministerial Call-In dated 6 March 2006 (Council’s file 23677 DA).
36.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply
Land Use
General
37.   Development undertaken in accordance with this approval must comply with the approved
      management plans for the site.
38.   No unrestrained dogs shall be permitted on site during construction.
Vegetation Removal
39.   Clearing of vegetation is only permitted within the approved earthworks and disturbed areas as
      detailed in the Department of Natural Resources and Water Vegetation clearing application
      decision notice – approval 2007/008064 and in accordance with the conditions of approval
      2007/008064
40.   Prior to the pre-start meeting a 2-strand wire fence is to be erected around the boundary of the
      ‘disturbed areas’ shown in the Department of Natural Resources and Water Vegetation
      clearing application decision notice – approval 2007/008064 and in accordance with the
      conditions of approval 2007/008064 and any trees being retained within the ‘disturbed areas’
      at a radius of 3 metres. This exclusion fence is to be adequately signed as such and is to be
      maintained until all works have been completed.
41.   Prior to any construction / clearing work commencing, a pre-start inspection is to be conducted
      with Council’s Planner (Land Use) and Ecologist.

                                                                                            Page 5 of 16

Section 6

42.   Trees authorised for removal shall be clearly marked prior to the commencement of tree
      clearing, with the removal operation to be closely monitored by an appropriately qualified
      person in accordance with the approved plans.
43.   Vegetation removal, tree felling and lopping adjacent to vegetation to be retained in the
      environmental covenant areas shall be undertaken in an environmentally sensitive manner to
      avoid damaging surrounding vegetation, trees and habitat.
44.   A qualified and experienced wildlife spotter shall be on site at all times immediately prior to and
      during tree/branch and vegetation removal work. Prior to felling or lopping all trees are to be
      checked for wildlife (eg. Koalas, cockatoos, possums). If wildlife are present, the tree shall not
      be felled or lopped until the wildlife has left the tree.
45.   Prior to vegetation clearing an onsite meeting with the fauna spotter catcher is to be conducted
      with Council’s Planner (Land Use) and Ecologist.
46.   The fauna spotter catcher shall comply with all conditions of the Decision Notice and the
      implementation strategy.
47.   Any pruning of limbs on trees being retained shall be in accordance with an arborist’s report
      and shall be approved by Council prior to work commencing.
48.   Weed growth is to be monitored in the cleared areas during construction, with any emergent
      weed species to be removed.
49.   Cleared vegetation is to be suitably processed by one of the following methods and removed
      from the site:-
      a.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
           loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum
           of 10 metres between edges of heaps.
      b.   Disposal for firewood.
      c.   Disposal for landscaping purposes.
      d.   Transport to alternative site for breaking down materials provided that all necessary
           permits have been obtained to allow the alternate site to be used for this purpose.
      e.   The Applicant is advised that burning off is an unacceptable method of disposal.
Weed & Pest Removal
50.   In order to protect the ecological values of the site the following apply:
      a.   prior to first entering the site, all construction machinery and vehicles shall be washed
           down to remove soil that may contain weed seeds, soil pathogens and pest species;
      b.   all imported fill, soil, gravel and other construction and landscaping materials shall be
           weed, pest and disease free and certified as such by the supplier;
      c.   all mulch used on the site shall be weed, pest and disease free and certified as such by
           the supplier;
      d.   all mulch produced on-site by mulching cleared vegetation and trees shall specifically
           exclude material (particularly seeds) from weed species (eg. lantana, asparagus fern and
           umbrella trees); and
      e.   the certificates referred to above are to be obtained prior to the use of the material on-site
           and to be made available to Council.
51.   Weed species cleared from the site shall not be mulched. Vegetative material from weed
      species shall be removed from the site and disposed of in a Council approved refuse tip.




                                                                                              Page 6 of 16

Section 7

      a.   All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest
           and Stock Route Management) Act 2002 are to be controlled on the site prior to Council
           endorsement of the plan of survey. In this context “controlled” shall mean, for class 1
           and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants
           where they threaten environmentally significant areas of the site such as riparian zones
           and areas of natural vegetation.
      b.   Where class 3 plants are removed as a result of this condition and there is not sufficient
           natural regeneration of native species, the areas shall be replanted with endemic native
           species so that a sustainable natural ecosystem is restored.
52.   If overall spraying of weed infestations is carried out, ensure all native recruits are marked with
      flagging tape prior to overall spraying.
53.   Rocks with an average diameter of 150mm are to be placed on top of geotextile matting in
      areas under the cantilevered balconies where no native vegetation exists. The areas under
      the cantilevered balconies are to be maintained with the rock/geotextile matting groundcover
      so that no earth is left exposed.
54.   Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a Change to an Existing Approval Application under the Integrated
      Planning Act must be made. Amended plans clearly indicating the changes must be lodged
      with this application along with the appropriate fees.
55.   The development shall be carried out in accordance with the conditions of Decision Notice
      Ministerial Call-In dated 6 March 2006 – (Council’s file 23677 DA) and in the Department of
      Natural Resources and Water Vegetation clearing application decision notice – approval
      2007/008064.
56.   The requirements of this development approval are to be effected prior to the commencement
      of the use. Council reserves the right to call upon the existing bond or guaranteed sum
      referred to in Decision Notice Ministerial Call-In dated 6 March 2006 (Condition File No. 23677
      DA) to effect compliance with these conditions.
57.   Prior to the commencement of the use, a Development Permit for Operational Works -
      Landscaping must be obtained.
Environmental Services
Vegetation Management Plan
58.   The proposed fencing is to contain soil, rock and other debris spilling into integral areas during
      earthworks. The fencing should be built to a standard to withstand a high rainfall event. No
      movement of soil, rock, or other debris from the development footprint is permitted into the
      covenant area or the waterway.
59.   The 3 mature hoop pines in the vicinity of the lodge development shall be protected as
      indicated in section 2.1.2.6 of the approved EMP.
      Prior to the commencement of operational works in the vicinity of the Hoop Pines, an onsite
      inspection by Council officers at a mutually convenient time, is required to validate the
      prescribed protective measures are in place.
      A qualified arborist shall monitor the health and structural integrity of these 3 trees monthly
      during the Lodge construction period and monitor quarterly for 12 months after the Lodge
      construction is completed. The owner will rectify any decline in the health or structural integrity
      of the trees, in accordance with the arborist’s recommendations.
Fauna Habitat Management Plan
60.   Populations of Short-limbed Snake skink on the site will be monitored for a period of three
      years from commencement of operational works, with a yearly report provided to Council. The
      owner will address any species decline within the covenant area by seeking and implementing
      advice from a qualified reptile specialist.

                                                                                              Page 7 of 16

Section 8

61.   The Environmental Auditor shall prepare a plan regarding the installation of fauna nesting
      boxes. This plan shall be submitted to Council prior to commencement of works. Specific
      detail required is number of nest boxes and target animal, and monitoring and maintenance
      regimes that will be put in place to ensure nest boxes are functional and being used. A yearly
      nest box monitoring report is required to be submitted to Council.
62.   The use of nestbox fixtures that enter the live tissue of the host tree are not permitted (eg.
      Coach bolts, tex screws etc). Alternative methods of nestbox fixing that do not harm the tree or
      do not contravene Local Law No. 10 Vegetation Management 2003 are to be employed.


Water & Sewerage
63.   Sewer connection and poly lined manhole as detailed in Inset A on Drawing N-B7416-C1-04-
      03 B is approved for construction.
64.   Internal sewerage reticulation, pump station, and rising main as detailed on Drawings N-
      B7416-C1-04-01 C, N-B7416-C1-04-02 B, N-B7416-C1-04-03 B, and N-B7416-C1-04-04 B
      are acceptable for connection to Council’s sewerage system. A Plumbing Compliance Permit
      must be obtained from Council’s Plumbing Services Department prior to commencement of
      these works.
65.   Internal water reticulation, as detailed on Drawing N-B7416-C1-05-01-A is acceptable for
      connection to Council’s water reticulation system. A Plumbing Compliance Permit must be
      obtained from Council’s Plumbing Services Department prior to commencement of these
      works.
66.   A copy of the job specification is to be provided to Sunshine Coast Water’s Inspector at least
      seven (7) days prior to commencement of works.
67.   The names of any proposed contractors for works are to be submitted in writing, together with
      copies of current Public Liability and Workers Compensation Insurances together with certificates
      of currency for those policies, for consideration by the Assessment Manager seven (7) days prior
      to pre-start meetings and commencement of works. A separate letter will then be issued
      approving the contractor (or otherwise) for the works. No other contractor or subcontractor shall
      be engaged to carry out the works or any part of the works without the written approval of the
      Assessment Manager.
68.   Sunshine Coast Water’s Inspector shall be given (7) days notice of intention to commence
      works. A pre-start meeting shall be arranged prior to commencement of works by contacting
      Sunshine Coast Water’s Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only
      available for pre-start meetings, inspections and testing etc. between the hours of 6:30am to
      4:00pm, Monday to Friday. Inspector will not be available outside these hours unless prior
      approval is obtained from the Sunshine Coast Water’s Development Engineer with any costs
      incurred by Council outside the hours nominated above, met by the Contractor/Developer. These
      costs will be in addition to normal inspection fees.
69.   Notwithstanding that Sunshine Coast Water has checked the plans with due care, where it is
      found during construction that variations exist with Sunshine Coast Water’s standards, Sunshine
      Coast Water standards shall apply.
70.   It is the responsibility of the applicant to ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council property
      or facilities (such as underground drainage, water supply and sewerage) are protected against
      any damage or interference whatsoever.




                                                                                            Page 8 of 16

Section 9

71.   If any Council property or facilities should be damaged by the applicant or any of its consultants or
      contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the applicant and/or its contractors shall forthwith notify the Assessment
      Manager and shall forthwith rectify the damage to that property or facility at its cost to the
      satisfaction of the Assessment Manager prior to the sealing of the survey plan and/or acceptance
      of the works on-maintenance. Alternatively, the applicant may request the Council to carry out
      the rectification work at the applicant's cost, such cost being paid by the applicant to the Council
      prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance' provided
      that in the case of emergency, the Council shall be entitled to rectify such damage at the cost of
      the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the
      work 'on maintenance'.
72.   The Contractor shall make all necessary arrangements for supply of water required for
      construction works. The use of hydrant standpipes on Sunshine Coast Water mains will NOT be
      permitted. Contractors should contact Sunshine Coast Water on phone 5449 5254 to obtain an
      application form for issue of a key to access Council’s water tanker filling stations. Conditions of
      access and location of filling stations are detailed on the application form.
73.   All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to
      acceptance 'on maintenance'.
      CCTV inspection will be carried out by Sunshine Coast Water’s CCTV contractor and arranged
      by Council following satisfactory completion of construction works. The developer will be
      responsible for the full cost of CCTV inspection, including any additional inspection necessary
      following defect identification and rectification . This charge is payable prior to commencement
      of works and will be determined on the unit rate basis current at the time of approval.
74.   All signage, including that for safety during construction shall be in accordance with the Manual of
      Uniform Traffic Control Devices and Main Roads Department Roadworks Signing Guide.
75.   As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
      56 coordinate value to the standards and requirements of the Assessment Manager are required
      for Council records. Such 'as constructed' drawings will be required prior to works being accepted
      "on maintenance", where applicable. Requirements for "as constructed" information are detailed
      in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
76.   Release of plans of survey and/or acceptance of the works on-maintenance will not be
      considered until lodgement of satisfactory 'as constructed' records.
      Please note that bonding of outstanding works will not be considered by Council.
77.   Your Consulting Engineers for the project are responsible for arranging all inspections and
      ensuring that all relevant details required by Sunshine Coast Water are supplied. The attached
      Water and Sewerage Inspection Report form is to be kept by you and presented to Council's
      Inspector at each stage of the development requiring a meeting or inspection. The Inspector will
      sign the form at each stage when conditions have been satisfied. The works will be accepted 'on
      maintenance' when this form, signed by the Inspector for each stage, is returned with a letter
      requesting that it go 'on maintenance'.
78.   It is Council policy that a maintenance bond be imposed on construction works during the
      maintenance period. The maintenance bond shall be 5% of the agreed value of the development
      obligations, or $1,500 whichever is the greater amount. This bond must be lodged by (and shall
      only be accepted from) the Developer for the works.
79.   Construction work and other associated activities are permitted only during the hours of 7:00am
      and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
      where extended hours are approved by the Assessment Manager or his nominee.
80.   Cut-ins to existing live sewer are to be performed by Approved Contractor. Sunshine Coast
      Water’s Inspector shall be present during any work on live sewer undertaken by contractor. An
      additional fee of $160.00 (included below) is required to cover costs associated with these live
      sewer works.
                                                                                               Page 9 of 16

Section 10

81.   Fees applicable to the above project are listed.
          Plan Examination                           $ 930.00
          Inspection Fee                             $ 810.00
          Checking as-constructed data               $ 130.00
          CCTV fee                                   $ 50.00
          Live sewer inspection                      $ 155.00
          BALANCE OWING                              $ NIL PAID 08/01/08                   RN 356475

Environmental Health
82.   Where the development involves the removal, relocation or demolition of a building, a Waste
      Management Plan (construction and demolition) shall be submitted prior to demolition,
      removal or relocation of any building other than a shed.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Sunshine Coast Regional Council Waste Management Code)
      The Plan shall contain the following information:
      The site area for the storage and separation of waste is to be shown on the plan drawings
      accompanying the application.
      A waste management table as indicated below is to be completed showing how waste material
      is to be segregated - recycled – reused or disposed.
 MATERIALS ON-SITE                       DESTINATION
                                         Re-use and Recycling                                Disposal
 Expected waste           Estimated      On-site                    Off-site                 *specify
 materials                volume(m³)     *specify proposed re-      *specify contractor      contractor and
                                         use or on-site recycling   and recycling outlet     landfill site or other
                                         methods                                             disposal site
 Excavation material
 Green waste
 Bricks
 Concrete
 Timber - please
 specify
 Plasterboard
 Metals - please
 specify
 Asbestos
 Other - please specify

Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
completed by the demolition contractor.

The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective
reuse and recycling of such materials. Additionally Council rewards those who segregate waste by
significantly reducing disposal fees at the landfill some items are free. Higher gate fees are charged for
loads of mixed waste.




                                                                                                   Page 10 of 16

Section 11

83.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial
      Premises”, including an external imperviously paved area correctly sized for all refuse and
      recycling containers and suitably screened from public places and neighbouring properties.
84.   The developer must ensure there is a safe and suitable kerbside bin pick up location, or must
      provide a safe and suitable onsite collection. NB the refuse vehicle must be able to enter and
      leave the site in a forward direction without any dangerous maneuvers.
85.   A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer,
      via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the
      sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x
      700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or any other design
      approved by Council.
86.   Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
      pumps etc) shall comply with the following requirements:
      a.   The equipment shall be installed and located in a manner that prevents excessive noise
           in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
           Notices (on-the-spot fines) may apply for offences.
      b.   A person must not use equipment on any day if it makes or causes noise to be made:
           i.     From 10pm to 7am: More than the lower of either –
                        40 dB(A)
                        3 dB(A) above the background noise level
           ii.    From 7am to 7pm: More than the lower of either –
                        50 dB(A)
                        5 dB(A) above the background noise level
           iii.   From 7pm to 10pm: More than 3 dB(A) above the background noise level.
           iv.    Pool pumps must not be audible at an effected premises between 10pm-7am
      c.   Submission of written certification from a suitably qualified person confirming that the
           noise levels comply when measured at either the residential boundary or outside the
           most exposed part of an affected building, whichever is the closest to the equipment.
           This is required immediately after installation of the equipment and prior to any
           occupation of the building, and in a format approved by Council. This assessment must
           take into account noise from all fixed equipment on the property e.g. swimming pool
           pump, heating equipment, that may increase the overall noise level emitted.
      Note: it is recommended that the consultant that will be engaged to certify the noise levels of
      mechanical equipment is asked to comment on the position and installation of equipment at
      the plan design stage, this way noise problems can be minimised or avoided cost effectively.
87.   Noise from residential building works shall comply with the following –
      a.   Limited to between 7:00am to 6:00pm Monday to Saturday.
      b.   All reasonable measures are taken to minimise noise emissions.
      c.   Not permitted on Sunday or public holidays.


5     REFERRAL AGENCY CONDITIONS
Not Applicable.




                                                                                         Page 11 of 16

Section 12

6     APPROVED PLANS
The approved plans for this development approval are listed in the following table:
 Plan No.              Rev.     Plan Name                                      Date
 078103 – ETC-001      E        Attunga Heights Detailed Environmental         20 January 2009
                                Management Plan (EMP) - Attunga Heights
                                Residential Development – by Chenoweth
                                Environmental Planning & Landscape
                                Architecture

 DPP 2007/008064                Development Permit Plan                        8 August 2008
                                Plan of Area A in Lot 27 on RP89506

 N-B7416-C1-03-01      B        Stormwater Drainage Plan – by Opus             22 February 2008
                                Qantec McWilliam

 N-B7416-C1-03-02      B        Stormwater Drainage Plan – by Opus             22 February 2008
                                Qantec McWilliam

 N-B7416-C1-03-03      B        Stormwater Drainage Plan – by Opus             22 February 2008
                                Qantec McWilliam

 N-B7416-C1-01-01      C        Bulk Earthworks Layout Plan – by Opus          17 December 2008
                                Qantec McWilliam

 N-B7416-C1-01-03      B        Bulk Earthworks Layout Plan – by Opus          17 December 2008
                                Qantec McWilliam

 N-B7416-C1-01-04      B        Bulk Earthworks Layout Plan – by Opus          17 December 2008
                                Qantec McWilliam

 N-B7416-C1-01-05      B        Bulk Earthworks Layout Plan – by Opus          17 December 2008
                                Qantec McWilliam

 N-B7416-C1-01-06      A        Bulk Earthworks Sections – by Opus             25 February 2008
                                Qantec McWilliam

 N-B7416-C1-01-07      A        Bulk Earthworks Sections – by Opus             25 February 2008
                                Qantec McWilliam

 N-B7416-C1-01-08      A        Bulk Earthworks Sections – by Opus             25 February 2008
                                Qantec McWilliam

 N-B7416-C1-01-02      B        Sediment & Erosion Control Plan – by Opus      22 February 2008
                                Qantec McWilliam

 N-B7416-C1-06-01      A        Car Parking Layout Plan – by Opus Qantec       25 February 2008
                                McWilliam

 N-B7416-C1-02-01      A        Site Plan – by Opus Qantec McWilliam           14 December 2007

 N-B7416-C1-02-02      A        Site Plan – by Opus Qantec McWilliam           14 December 2007

 N-B7416-C1-02-03      A        Site Plan – by Opus Qantec McWilliam           14 December 2007

                                                                                        Page 12 of 16

Section 13

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Land Development
1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a Change to an Existing Approval Application under the Integrated
      Planning Act must be made. Amended plans clearly indicating the changes must be lodged
      with this application along with the appropriate fees.
Environmental Health
2.    The development should be undertaken in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
      borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
      emissions in accordance with the nuisance provisions of the Environmental Protection
      Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
3.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
      where it could reasonably be expected to move into a roadside gutter, storm water drain or a
      watercourse. On the spot fines apply for such offences.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not Applicable.
9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not Applicable.

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required            Subject of the required Development Permit
 Operational works –                            Drainage, Stormwater, Vegetation Clearing, Water &
                                                Sewerage, Earthworks, Access & Parking.

11    SELF ASSESSABLE CODES

Not Applicable.

12    SUBMISSIONS
Not Applicable.
                                                                                               Page 13 of 16

Section 14

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.

14    RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15    OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully




Ron Read
SENIOR TECHNICAL ASSESSMENT OFFICER




                                                                                         Page 14 of 16

Section 15

                                              Appeal Rights
                                             INTEGRATED PLANNING ACT 1997 & 1998 REGULATION



                                                              (5) If an application is processed under section
The following is an extract from the Integrated           6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                 application are available only for the aspects of the
                                                          development that would have required public
Division 8 - Appeals to court relating to
                                                          notification under the repealed Act.
development applications
Appeals by applicants                                         (6) If an application involves assessment
4.1.27.(1) An applicant for a development                 against a concurrence agency code, appeal rights
application may appeal to the court against any of        for submitters for the application are not available
the following-                                            against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a             concurrence agency’s response for the code.
    development application;                              Appeals by advice agency submitters
(b) a matter stated in a development approval,            4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the               of its jurisdiction, appeal to the court about the
    development, and the identification of a code         giving of a development approval for a
                         1
    under section 3.1.6;                                  development application if-
(c) the decision to give a preliminary approval           (a) the development application involves impact
    when a development permit was applied for;                assessment; and
(d) the length of a currency period;                      (b) the advice agency told the applicant and the
(e) a deemed refusal.                                         assessment manager to treat its response to
                                                              the application as a submission for an appeal.
    (2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the                  (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the            business days after the day the decision notice or
decision notice or negotiated decision notice is          negotiated decision notice is given to the advice
given to the applicant.                                   agency as a submitter.
    (3) An appeal under subsection (1)(e) may be          Appeals for matters arising after approval given
started at any time after the last day a decision on      (co-respondents)
the matter should have been made.                         4.1.30.(1) For a development approval given for a
Appeals by submitters                                     development application, a person to whom any of
                                                          the following notices have been given may appeal
4.1.28.(1) A submitter for a development
                                                          to the court against the decision in the notice-
application may appeal to the court about-
                                                          (a) a notice giving a decision on a request for
(a) the giving of a development approval, including
                                                              extension of the currency period for an
    any conditions (or lack of conditions) or other
                                                              approval;
    provisions of the approval; or
                                                          (b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
                                                              a minor change to an approval.
    (2) The appeal must be started within 20
                                                              (2) The appeal must be started within 20
business days (the “submitters appeal period”)
                                                                  business days after the day the notice of the
after the day the decision notice or negotiated
                                                                  decision is given to the person.
decision notice is given to the submitter.
                                                              (3) Subsection (1)(a) does not apply if the
    (3) If a person withdraws a submission before
                                                                  approval resulted from a development
the application is decided, the person may not
                                                                  application (superseded planning scheme)
appeal the decision.
                                                                  that was assessed as if it were an
    (4) If an application involves both impact                    application under a superseded planning
assessment and code assessment, appeal rights                     scheme.
for submitters are available only for the part of the
                                                              (4) Also, a person who has made a request
application involving impact assessment.
                                                                  mentioned in subsection (1) may appeal to
                                                                  the court against a deemed refusal of the
                                                                  request.

1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                  Page 15 of 16

Section 16

                                                        - 16 -



    (5) An appeal under subsection (4) may be                        (2) The appeal must be started within 20
        started at any time after the last day the               business days after the day notice of the decision
        decision on the matter should have been                  is given to the applicant.
        made.                                                    For Building Works Only
Division 9 - Appeals to court about other                        Rights of appeal conferred by Section 4.2.9 of the
matters                                                          Integrated Planning Act 1997 as follows:
Appeals for matters arising after approval given                 Division 3 – Appeals to tribunals relating to
(no co-respondents)                                              development applications
4.1.31.(1) A person to whom any of the following                 Appeals by applicants
notices have been given may appeal to the court
                                                                 4.2.9(1) An applicant for a development application
against the decision in the notice-
                                                                 may appeal to the Building and Development
(a) a notice giving a decision on a request to                   Tribunal against any of the following-
    change or cancel a condition of a development
    approval.                                                    (a) the refusal, or the refusal in part, of a
                                    2                                development application;
(b) a notice under section 6.1.44 giving a decision
    to change or cancel a condition of a                         (b) a matter stated in a development approval,
    development approval.                                            including any condition applying to the
                                                                     development, and the identification of a code
    (2) The appeal must be started within 20                         under section 3.1.6;
                                                                                           3
        business days after the day the notice of the
        decision is given to the person.                         (c) the decision to give a preliminary approval when a
                                                                       development permit was applied for;
    (3) Also, a person who has made a request
                                                                 (d) the length of a period mentioned in section 3.5.21
        mentioned in subsection (1)(a) may appeal
                                                                       currency period;
        to the court against a deemed refusal of the
        request.                                                 (e) a deemed refusal.
    (4) An appeal under subsection (3) may be                       (2) An appeal under subsection (1)(a) to (d) must
        started at any time after the last day the               be started within 20 business days (the “applicant’s
                                                                 appeal period”) after the day the decision notice or
        decision on the matter should have been
                                                                 negotiated decision notice is given to the applicant.
        made.
                                                                     (3) An appeal under subsection (1)(e) may be
Appeals against decisions to change approval                     started at any time after the last day a decision on the
conditions under the repealed Act                                matter should have been made.
4.1.33A.(1) A person who is dissatisfied with a                  The Registrar for the Building and Development
decision made on an application to change the                    Tribunal may be contacted at the website
conditions attached to an approval given under                   http://www.localgovernment.qld.gov.au/
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.




2
     Section 6.1.44 (Conditions may be changed or
                                                                 3
    cancelled by assessment manager or concurrence                    Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                                 local planning instrument)
                                                                                                             Page 16 of 16

Used in these records

About this file

File size
88 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A5368.001.pdf · 88 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.