Council archive · source document
001A5368.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
12. Certification of the completed structural works must be provided to Council by the supervising
engineer The certification shall state that the completed works conform with all aspects of the
design and that the completed works, including on site infrastructure, will not have any
adverse affects on the stability of proposed buildings and/or structures and/or services and/or
lands.
13. Further protection of the creek banks at stormwater outlets may be required as directed by
Council’s CEO, to avoid any possibility of erosion of the creek banks occurring.
14. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure in both directions of
Alma Way.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the commencement
of any works.
15. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
16. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
17. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
18. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The consulting engineers are responsible for arranging all
inspections, with Council’s Construction Technical Officer or nominated staff.
19. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
20. An inspection is to be carried out with the relevant Council officers, the Contractor and
Supervising Engineer after pegging the extents of the development has been established, and
prior to clearing being carried out. This inspection is to deal with the limits of clearing to be
carried out for this development. This meeting is to take place prior to the “Pre-start” meeting.
21. Council standards shall apply to these works unless otherwise modified herein.
22. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Council’s CEO and shall forthwith rectify the damage to that property or
facility at its cost and to the satisfaction of the Council’s CEO.
Page 3 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A5368.001.pdfRelated documentPublic source context ↗
07/2555 Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 88 KB (small file)
- File type
No other editions are linked here.