Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
applicants expense with a further CCTV inspection arranged once the rectification works have
been completed.
To this extent all CCTV inspections, including any additional inspections necessary following
defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
incurred by Council in reviewing the CCTV inspection results shall also be borne by the
applicant.
32. Prior to acceptance of civil works "On Maintenance", the lodgement of satisfactory “As
Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
level and type of all services and structures. All of which shall be submitted to Council for
checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering
Design Standards – Roads, Drainage and Earthworks.
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
33. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
34. The works will not be accepted "On Maintenance" until the landscaping is completed.
35. These works are also to be in compliance with the relevant conditions of Decision Notice
Ministerial Call-In dated 6 March 2006 (Council’s file 23677 DA).
36. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply
Land Use
General
37. Development undertaken in accordance with this approval must comply with the approved
management plans for the site.
38. No unrestrained dogs shall be permitted on site during construction.
Vegetation Removal
39. Clearing of vegetation is only permitted within the approved earthworks and disturbed areas as
detailed in the Department of Natural Resources and Water Vegetation clearing application
decision notice – approval 2007/008064 and in accordance with the conditions of approval
2007/008064
40. Prior to the pre-start meeting a 2-strand wire fence is to be erected around the boundary of the
‘disturbed areas’ shown in the Department of Natural Resources and Water Vegetation
clearing application decision notice – approval 2007/008064 and in accordance with the
conditions of approval 2007/008064 and any trees being retained within the ‘disturbed areas’
at a radius of 3 metres. This exclusion fence is to be adequately signed as such and is to be
maintained until all works have been completed.
41. Prior to any construction / clearing work commencing, a pre-start inspection is to be conducted
with Council’s Planner (Land Use) and Ecologist.
Page 5 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A5368.001.pdfRelated documentPublic source context ↗
07/2555 Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 88 KB (small file)
- File type
No other editions are linked here.