planning report minor change
PIVOTAL The changes to the location of the tanks still meet the required minimum landscaped area requirements. The location of plantings in front of the tanks also still provide for landscaping along boundaries with adjoining premises — consistent with the requirements of The Noosa Plan. Changes to Conditions As a result of the proposed changes the following conditions require changing: Approved Plans Update the approved plans to show the additional tanks. - MCU Plans (add additional plan by Archend) - OPW Plans (replace stormwater plan by Recor and Element with updated tanks shown) If you have any further queries in relation to the above, please do not hesitate to contact myself. Regards, Jack Lewis B.Sc Hons UNSW M.Plan Otago RPIA Planner/Director Pivotal Perspective Pty Ltd 0406 334 227