Skip to the record
For the highest quality transcripts.

Original source · versioned page text

planning report minor change

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PIVOTAL

The changes to the location of the tanks still meet the required minimum landscaped area

requirements. The location of plantings in front of the tanks also still provide for landscaping along
boundaries with adjoining premises — consistent with the requirements of The Noosa Plan.

Changes to Conditions
As a result of the proposed changes the following conditions require changing:

Approved Plans
Update the approved plans to show the additional tanks.

- MCU Plans (add additional plan by Archend)
- OPW Plans (replace stormwater plan by Recor and Element with updated tanks shown)

If you have any further queries in relation to the above, please do not hesitate to contact myself.

Regards,

Jack Lewis B.Sc Hons UNSW M.Plan Otago RPIA
Planner/Director

Pivotal Perspective Pty Ltd

0406 334 227
Log in to download the original file

planning report minor change.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.