Original source · versioned page text
1. NC_Covering letter Minor change 1124
1. Completed Change Application Form 5 and Owner’s consent;
2. A copy of the existing Development Permit (Negotiated Decision Notice
MCU12/0133 (including previous GIA determinations) the subject of this application
- Attachment 1;
3. A copy of Relevant Plans (Site Plan / Floor Plan / Elevation / Perspectives) for the
Gymnasium extension (including minor new pavements) the subject of this
application - Attachment 2;
4. Documentation supporting the applicant’s eligibility for a 50% reduction in
application fees - Attachment 3;
5. Current Property Searches - Attachment 4;
6. A statement below with regard to the proposed development works - supporting that
the that there is no material change of use occasioned by the proposed extension to
the Gymnasium / minor pavement work and that the development should otherwise
be considered a minor change to the existing development permit.
Note: There were no referral agencies for the development approval other than the chief
executive. Referral of the change application to the chief executive is otherwise not
required - pursuant to s.80(1)(a) of the Planning Act 2016.
1. Change Application Fee:
Council’s fee for the above application is $1,308.50, being 50% of the scheduled
fee of $2,617.00 for non-profit / charitable / religious organisations – as supported
by Attachment 3. Payment will be made online, post lodgement.
2. Background:
Edmund Rice Education Australia currently operates an educational premises /
school at 2 Girraween Ct Sunshine Beach – being the Noosa Flexible Learning
Centre (NFLC) – on land descried as part of Lot 3 RP 887636, being Lease A on
SP246435. A copy of the current title search and relevant property searches is
provided at Attachment 4.
The educational premises was established pursuant to a Development Permit for
Material Change of Use of Premises (Education - Type 2 School) – granted on 4
June 2013 by the (former) Sunshine Coast Regional Council - Council Ref:
MCU12/0133.
Council has agreed previously to Generally in accordance with determinations
relating to the following developments:
- An extension to the existing basketball court slab, including a new roof over
the area, in 2016 (copy provided at Attachment 2); and
- A storage shed in 2020 (copy of plans provided at Attachment 2).2
2
Note: These determinations were additionally based on engineering advice concerning minimising runoff
by not having downpipes directly connected to the street stormwater drainage system - whereby runoff
sheet flows to ground or discharges to ground level via a downpipe, where it subsequently is able to
infiltrate into site soils.
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.