                                                                          Officer:             Morgan Gaffney
                                                                          Direct Telephone:    07 53296370
                                                                          Our Reference:       MCU23/0129 OPW23/0153
                                                                          Your Reference:      04801

               16 November 2023


               GY Hall, SA Hall, C/-
               The Jetty Specialist
               27 Wyuna Dr
               NOOSAVILLE QLD 4566


               [email protected]



               Dear Applicant
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 15 November 2023, Council decided to approve the
               application subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU23/0129 & OPW23/0153

                   Street address:              27 Wyuna Dr Noosaville Qld 4566

                   Real property description:   Lot 13 N 10576

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Material Change of Use – Landing – Residential
               •       Development Permit for Operational Works – Jetty – Residential
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                       Approved Plans
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.



               ABN 97.969.214.121                                                                    PO Box 141
               noosa.qld.gov.au                                                               Tewantin QLD 4565
               [email protected]                                                               07 5329 6500
                                                                                                          Page 1 of 16
Document Set ID: 22666179
Version: 2, Version Date: 16/11/2023
Full text of the other 15 pages

Page 2

                         Plan No.            Rev.    Plan/Document Name                             Date

                         TJS-04801-01        E       Site Plan & Water Allocation                   17/07/2023

                         TJS-04801-02        E       Layout Plan                                    17/07/2023

                         TJS-04801-03        D       Elevation                                      17/07/2023

                      Currency Period
               2.     The Currency Period for this development approval lapses if all conditions have not been
                      complied with, and the plan of survey lodged with Council for endorsement by 15 November
                      2029, unless an application to extend the currency period is approved by Council.
                      Site Specific Conditions
               3.     The maximum number of vessels that may be berthed, moored, attached or stored on the
                      structure must not exceed 2.
               4.     The use of the landing must not cause any adverse effects on the amenity of the surrounding
                      areas including changes to light, views, air quality and noise.
               5.     Vessels berthed/moored at the landing must be located a minimum of 3.0 metres from the
                      prolongation of the property boundaries.
               6.     Vessels and boatlifting devices must be connected directly to the landing, and not located
                      side by side or in tandem with another vessel.
                      Performance Bond
               7.     Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
                      submitted to Council, to secure performance of all conditions of this approval, prior to the
                      commencement of the works. The cash bond or trading bank guarantee will be returned on
                      performance of the conditions of this approval less any costs incurred by Council in respect
                      of enforcing performance of this permit. Council reserves the right to call upon the bond or
                      guaranteed sum to effect compliance with conditions.
                      General Conditions
               8.     All structures must be designed and constructed such that they are free standing within the
                      waterway and are not connected to or behind the revetment wall
               9.     All structures must have no detrimental effects on stormwater drains and/or easements.
               10.    Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
                      revetment wall.
               11.    A rigid handrail must be fitted on one side of the walkway. The handrail must be of an open
                      design and in accordance with the approved plans.
               12.    No posts or vertical supports of the proposed jetty are to extend vertically from the structure
                      unless they provide necessary support for the handrail.
               13.    No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
                      elevating a vessel above the water without Council approval.
               14.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               15.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               16.    The jetty is to be used for private purposes only with no commercial operations to be
                      undertaken.
               17.    Boat repair activities are not permitted on site.


                                                                                                       Page 2 of 16
Document Set ID: 22666179
Version: 2, Version Date: 16/11/2023

Page 3

               18.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               19.    The mooring facility must not be utilised for live-aboard purposes.
               20.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               21.    Certification by a Registered Professional Engineer of Queensland that states that the jetty
                      is constructed in accordance with best practice methods and is structurally sound must be
                      submitted to Council. This certification must be submitted to Council within three (3) months
                      of the completion of the works. A final inspection and approval of the structure by Council’s
                      Inspector is also required. Please contact Council’s Development Assessment Branch on
                      5329 6500 to arrange the inspection.
               22.    This approval lapses where the construction of the jetty has not commenced within two (2)
                      years of the date of issue of the approval, unless application is made and approved by
                      Council for an extension.
               23.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans
               NOTE: This approval does not capture any proposed additions or alternations to the existing
               dwelling or within the rear boundary setback. Any proposed additions and alternations are subject
               to the Accepted Development provisions of the Noosa Plan 2020.
               5.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status        Referral Agency and Referral Trigger                 Response
                                       Address

                Concurrence            Department of State     Schedule 10, Part 17,        The agency provided its
                                       Development,            Division 1 – Tidal Works     response on 10
                                       Manufacturing,          or work in a Coastal         November 2023
                                       Infrastructure, and                                  (Reference No. 2311-
                                                               Management District
                                       Planning (SARA)                                      37569 SRA). A copy of
                                       SARA – SEQ North                                     the response is
                                       Region Office                                        attached.
                                       (07) 5352 9701 or
                                       email:
                                       [email protected]

               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     The approval or conditions do not absolve the owner of the land from complying with all the
                      conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
                      statues and/or statutory regulations in the execution and/or performance of said works.




                                                                                                     Page 3 of 16
Document Set ID: 22666179
Version: 2, Version Date: 16/11/2023

Page 4

               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               5.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




               Yours faithfully,




               Morgan Gaffney
               Senior Development Engineer




               Enc:   Appeal Rights
                      Referral Agency Response
                      Approved Plans/Documents

               cc.    [email protected])




                                                                                                       Page 4 of 16
Document Set ID: 22666179
Version: 2, Version Date: 16/11/2023

Page 5

                                       Referral Agency Response
                                       PLANNING ACT 2016 & PLANNING REGULATION 2017




                                                                                      Page 5 of 16
Document Set ID: 22666179
Version: 2, Version Date: 16/11/2023

Page 6

2311-37569 SRA

SARA triggers: Schedule 10, Part 17, Division 3, Subdivision 1, Table 1 (Planning
Regulation 2017) - Operational work that is tidal works or work in a
coastal management district

Schedule 10, Part 17, Division 3, Subdivision 1, Table 2 (Planning
Regulation 2017) - Operational work that is tidal works or work in a

coastal management district
SARA reference: 2311-37569 SRA
Assessment manager. Noosa Shire Council
Street address: 27 Wyuna Drive, Noosaville
Real property description: Lot 13 on N10576
Applicant name: Simon & Gayle Hall
C+ The Jetty Specialist
Applicant contact details: 18 Ron Parkinson Cres
Corbould Park QLD 4551
[email protected]
Human Rights Act 2019 A consideration of the 23 fundamental human rights protected under
considerations: the Human Rights Act 2019 has been undertaken as part of this
decision. It has been determined that this decision does not limit
human nights.

Representations

An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.

 

A copy of this response has been sent to the applicant for their information.

For further information please contact Timothy Ainsworth, Planning Officer, on 5352 9714 or via email
[email protected] who will be pleased to assist.

Yours sincerely

A ff
x

Garth Nolan
Manager (Ptanning)

cc Simon & Gayle Hall, [email protected]

enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations about a referral agency response provisions
Attachment 5 - Documents referenced in conditions

State Assessment and Referral Agency Page 20°86

Document Set ID: 22666179 Page 6 of 16

Version: 2, Version Date: 16/11/2023

Page 7

2311-37569 SRA

Attachment 1—Referral agency conditions

(Under section 56(1)(b){i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)

 

 

No. | Conditions Condition timing
Development Permit for operational work

Schedule 10, Part 17, Division 3, Table 1, Item 1 — Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating

 

 

 

to the following conditions:
1. The development must be carried out generally in accordance with For the duration of
the following plans: works and to be

* ‘Site plan & water allocation plan’, prepared by The Jetty maintained
Specialist, dated 17/07/2023, drawing number TJS-04801-01,
version E

* ‘Layout plan’, prepared by The Jetty Specialist, dated
17/07/2023, drawing number TJS-04801-02, version E

* ‘Elevation’, prepared by The Jetty Specialist, dated
17/07/2023, drawing number TJS-04801-03, version D

 

 

2. The works to which this approval relates are to be for a private At all times
purpose only.

3. Any operator and contractor involved in the works to which this During construction
approval relates must:

(a) be provided a copy of referral agency conditions

(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval

(c) maintain such measures, plant and equipment in a proper
and efficient condition

(d) operate such measures, plant and equipment in a proper
and efficient manner

4. For the proposed works only use maternal which are free from During construction

contaminants as defined under section 11 of the Environmental

Protection Act 1994.

5. Should the works become damaged as a result of erosion, flooding At all times

or storm tide inundation, the registered landowner(s) of the subject

land shall be responsible for the removal of all debris at their own

expense.

Schedule 10, Part 17, Division 3, Table 2, Item 1 — Tidal works or work within a coastal management

district —The chief executive administering the Planning Act 2016 nominates the Director-General of

the Department of Transport and Main Roads to be the enforcement authority for the development to

which this development approval relates for the administration and enforcement of any matter relating

 

 

 

 

 

 

to the following conditions:
6. The development must be carried out generally in accordance with At all times
the following plans:

* ‘Site plan & water allocation plan’, prepared by The Jetty
Specialist, dated 17/07/2023, drawing number TJS-04801-
01, version E

 

 

 

 

 

State Assessment and Referral Agency Page 3 0f8

Document Set ID: 22666179 Page 7 of 16

Version: 2, Version Date: 16/11/2023

Page 8

2311-37569 SRA

 

 

 

 

 

 

 

 

 

7. (a) Light/mark all vessels, structure, plant and equipment associated | For the duration of
with the works, in accordance with Section 3 of AS4282-1997 works and for operation
Control of the obtrusive effects of outdoor lighting. to be maintained at all
Lighting provided must not obscure, disguise or otherwise interfere times
with the safe navigation of other vessels, including the effectiveness
of navigational lighting.
8. The construction, operation and maintenance of the pontoon. And For the duration of
any ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corndor or
(b) be located in a high risk maritime zone; or
impede the safe navigation of other ships or boats; or restrict safe
access to or from neighbouring structures
9. Remove and dispose of any debris or similar obstruction For the duration of
encountered whilst undertaking the work at an appropriately licensed | works
facility.
10. All piles and/or structure to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 4 0f8

Document Set ID: 22666179
Version: 2, Version Date: 16/11/2023

Page 8 of 16

Page 9

2311-37569 SRA

Attachment 2—Advice to the applicant

 

 

General advice

1. Terms and phrases used in this document are defined in the Planning Act 2016, its requilation
or the State Development Assessment Provisions (SDAP) (version 3.0). If a word remains
undefined it has its ordinary meaning.

 

 

 

 

 

State Assessment and Referral Agency Page Sof8

Document Set ID: 22666179 Page 9 of 16

Version: 2, Version Date: 16/11/2023

Page 10

2311-37569 SRA

Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

 

The reasons for the SARA's decision are:
*® The proposed development is for operational work for prescribed tidal works to construct a jetty and
landing at 27 Wyuna Drive, Noosaville, formally described as Lot 13 on N10576.
* The jetty and landing is for private use and for one vessel with a maximum wet vessel beam of 2.8
metres.
* The proposed development involves operational work in a developed tidal waterway, and as such
required assessment under the State Development Assessment Provisions (SDAP).
* SARA assessed the application against State code 7: Maritime safety, of the SDAP (v3.0) and found it
complies, subject to conditions to ensure:
othe development is carried out generally in accordance with the plans of development
submitted with the application
o that at all times, all lights on or above the development site do not interfere with safe
navigation in surrounding waterways
othe development does not encroach on the navigation comdor or high-risk maritime zone to
ensure the safe passage of vessels
0 that debris from the development does not create a hazard to navigation
© that there is no residual material that could create a hazard to navigation.
* SARA assessed the application against State code 8: Coastal development and tidal works, of the
SDAP (v3.0) and found it complies, subject to conditions to ensure:
0 the development is carried out generally in accordance with the plan of development
submitted with the application.
© that at all times, the works, to which this approval relates are for private purpose only.
© any operator and contractor involved in the works ensures impacts on coastal values
(water quality) are avoided or minimised.
© works only use materials which are free from contaminants as defined under section 11 of
the Environmental Protection Act 1994.
© damaged works as a result of erosion, flooding or storm tide inundation, the registered
landowner(s) of the subject land shall be responsible for the removal of all debris at their
own expense.
Material used in the assessment of the application:
the development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
the SDAP (version 3.0), as published by SARA
the Development Assessment Rules

SARA DA Mapping system
section 58 of the Human Rights Act 2019

State Assessment ang Referral Agency Page 6 of 8

Document Set ID: 22666179 Page 10 of 16

Version: 2, Version Date: 16/11/2023

Page 11

2311-37569 SRA

Attachment 4—Representations about a referral agency response
provisions

 

(page left intentionally Diank)

State Assessment and Referral Agency Page 7 of 8

Document Set ID: 22666179 Page 11 of 16

Version: 2, Version Date: 16/11/2023

Page 12

2311-37569 SRA

Attachment 5—Documents referenced in conditions

 

(page left intentionally blank)

State Assessment and Referral Agency Page 6 of

Document Set ID: 22666179 Page 12 of 16

Version: 2, Version Date: 16/11/2023

Page 13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

  

 
 
 

3 TO-T08PO-SLL ‘SRT oeateee Lo ae ef = s aE
: a
5 yes! oi Soa AG re 3 5
i ul 133 37) 3 Fil 1b ia
|_| 5 oi 3
Se NOLYOTW WLW ENV ALIS a) oa Bits ew oS tS
|_wcrsmuscowo |
“S20 ar “aeg ewe sien sew ah
2H Th 1a
a WEN SRLETICZ «= JEU VES we Spe
3SNOdS3Y AONIOV 088TH bo wan Ba Bh pote
; TWHUSSISY Sy} ul 0} peusyas KOLLFOOTIY TaHLTL TT
Ce SLN3WINIO*0 ONY SNYVId * N¥Id GLs toe = 13
UU EST
aun
Wb bacon at Wt
+ fa 1 r
~ sewen i -
ve }
Pate a C4
| ¥
f “ NOQUNOd
a . Auta
suncte |
, ar i ot
wa MLS | 5
~ ot - x
~ L
~ A.
a] :
ine

 

 

Page 13 of 16

Document Set ID: 22666179

Version: 2, Version Date: 16/11/2023

Page 14

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 14 of 16

     

 

 

 

   

 

 

 

 

 

3 Z0-T08h0-SCL “Dotaatincsetee Pee sas 0 gf eT =—=
2 ae ALIS ESOS 1.] A STTWESI ote. Bee ane eg ear
STAVSOON aay TRO i337
xn wavNNA (22) ET 107 aN Waa I
laste: NVid INAV oy! 4 = PE Te
NOLLWRUSNOD WOH l| Sat ATTIS wa 9ZC0IN dd
| N¥Id I0XF1 qo) a5 &T LOT i
~ oe ae ab
| 908 ntieea try onnge owta Hos ob aus awa \
| ‘ ~~ re \
, - Spe
| Le \
Ty 1393
| gga \
oe * 1 "Ua0 oa Si FM | k Smub es So \
Y Hols 3uK Tew Ber E Zadat
UH 13 | rosa \
AHL Go 30 02) AbFS Nee Wa \
We- jae Tea By | OOS] S105) * DOL» \
0) - HBS By ga) sae ee
toe vx | | .
STG | A
ED a \ | zg We we
IDK | a = »
= Re .
| a Ba Bate aw re scl AS \
I gq 25 Bet » \
- as 425 St |
= a Th 4gvay swe
| g FG swe aNBY SiTe Sa) 21 TO ao i
| a. ae Tar) 9 ona) Teo \
| z 2
| - TT \
\ | 5
1 | . ae \
ROE ieeRNOKON aT aeq z 83 t. “33033 +
ae ha \
oe & Jvuys & 9 obey 4 wats \
ae 4 Tre oti ON
= 3SNOdS3Y AONSOV alll / oR? =r
shay) TWHYSIISHY FU} U! 0} pevejes ae 2 ob Wo
@3* =~ SLNSWNDOC ONY SNYTd . T Pabedan
4 MOON WORDT 15
L--J_-_---__----_--_- -Le cel x
T Mr aw
| | aarua |

 

 

 

WF FO ESM

 

 

Version: 2, Version Date: 16/11/2023

Document Set ID: 22666179

Page 15

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

irerewetmas nema | UNE wwe Lise ca a
a TOBPO-SCL Tess (Co Woamenra in rt — 4
4 * m naees ANE | ASTI VIS a — : Ears ow ;
| oe | STIAVSOON _, I oh Me se a Teor : Go 3hos wa
fart NOUWNTS aul TMD 2S an A3391.. Rye Ee ————_—A_VE— eos
NOLLOMRESNOD wos
ez ee tue an tee 2a
e20z seq UH'- Fhe 13
' LS Oe a
WS GaUETIEZ «= - JU WS : ra
3SNOdS3¥ ADNZD’ , ELD th Bag Boe
NOdS3¥ AONSOV ' [2 wa Es Rowe
TWHYIISY 4) Ul 0} pauieyas Di _ =
SLN3WINIO*D ONY SNVId To
SIT SET
mr
Te Oh Gher
TAT] OF WG!
ky Pe
rt)

 

 

Mt Tie Thee
bana: ood

 

 

 

   

 

HGH Try £3.03 +3 7

7 7
" wa >
AALS 904 HE do

ore ted Th 2

a
ona) age ta
Ae 31s PO “re OH Le »—_ —_

 
 

 

 

 

 

 

 

 

Sha a z

aco

 

 

 

HOST) LE Trade oir,

 

 

Page 15 of 16

 

 

Version: 2, Version Date: 16/11/2023

Document Set ID: 22666179

Page 16

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 16 of 16
Document Set ID: 22666179
Version: 2, Version Date: 16/11/2023

Used in these records

About this file

File size
682 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - MCU23-0129 & OPW23-0153.pdf · 682 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.