Attachment A - Proposed Landscape OPW plan · OPW12/0110.03
Plans and drawings: the text below has words only, no drawings.
Very large file (10.8 MB): may take a few minutes to open.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE
APPROVAL ISSUE
E OP WORKS 2024-04-08 NH NH ME
D OP WORKS 2021-10-11 HQ HQ WA
C OP WORKS 2018-02-23 ME ME WA
B DRAFT OP WORKS 2018-02-06 ME ME WA
A PRELIMINARY 2018-01-15 ME ME WA
ISSUE: DETAILS: DATE: DES: DC: QA:
CONSULTANTS
PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
URBAN DESIGNERS BRISBANE - JFP House
SURVEYORS 76 Ernest Street,
South Brisbane Qld 4101
ENGINEERS
P 07 3012 0100 W www.jfp.com.au
LANDSCAPE ARCHITECTS JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045
CLIENT: CLIENT NAME HERE PTY LTD
COUNTRY CLUB VILLAGES
PROJECT TITLE:
NOOSA DOMAIN
APARTMENTS
WALTER HAY DRIVE,
NOOSAVILLE.
SCALE:
COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
PLAN TITLE:
COVER SHEET
SCHEDULE
NOOSA DOMAIN APARTMENTS - SCHEDULE PLAN NUMBER: B3730LA1-DA1 LA VM
JOB #:
M1717L_A1
SCOPE: SHEET:
CS 02 E
ISSUE:
[OCR of page images]
SCHEDULE - LANDSCAPE & EXTERNAL WORKS
NOTE: QUANTITIES PROVIDED ARE TO ASSIST IN TENDERING AND ESTIMATION. Totals
ALL QUANTITIES ARE TO BE CHECK MEASURED BY TENDERERS WHEN SUBMITTING PRICING.
Item Legend Code Description Specification Unit Qty.
A PRELIMINARIES AND SITE WORKS, MINOR EARTHWORKS, DRAINAGE
F * .
1 Oo Site Establishment
1 Preliminaries Refer to specification to determine minimum Sum 1
required works.
1 2 Program PROGRAM DATES, MILESTONES AND HOLDPOINTS 0
TO BE ADDED HERE
START DATE:
PC DATE:
ENTRY WALL START DATE:
REHAB AREAS START DATE:
1 3 Initial Site Rubbish Removal Removal of waste items located on site. Items to Item 1
be removed before works commences.
1 |4 Set-out by surveyor required Survey by setout required. Design CAD files can Day 0
be supplied as requested.
po 0 Site Works/ Minor Earthworks
2 1 Shaping - adjust civil profiles to desired shape & Civil to provide site at handover minus 100mm m2 2122
trim +/-50mm of finished surface levels shown on
landscape plans
2 2 Cultivation as per specification Planting areas - 200mm cultivation m 1230
Gypsum: Incorporate at the rate of 0.25 kg/m2. Turfareas -100mm
REFER TO DETAIL
2 3 HOLD POINT - CULTIVATION- LANDSCAPE
SUPERINTENDENT TO INSPECTION PRIOR TO
TOPSOIL - PROVIDE Min. 72 HRS NOTICE
2 4 Additional Topsoil due to poor site conditions “Vifsubgrade is deemed to be a poor, i.e weathered m 1230
IF ORDERED rock, schist or heavy clay INSTALL an additional
200mm of site topsoil prior to garden bed
preparation
2 5 TPF Tree protection as per VMP - Temporary Fencing m 0
gE
3 0 Drainage
3 1 Subsoil drains - allowance only Type: 150 mm to raingardens and 100mm Lm 0
diameter to other areas. 100mm slotted HDPP Ag
Drain wrapped in geo-textile, drainage gravel to
be 20mm recycled concrete. Queensland
Recycling Pty Ltd Ph 135 135.
3 CON Subsoil drainage conduits Type: 100mm UPVC Item 275
3 Podium planter water retention layer-|1F ORDERED |Type: 100mm HydroCell foam layer with m? 0
protective geotextile over. Refer to detail
3 14 Pits - typically 300 x300 ACO Pits - within planting areas |Type: 300 x300 mm ACO Pits Item 33
Hot dip galv. Grates to AS1428.1
B HARDSCAPE
F.
4 Pavements
1 General for all pavements Sealer: Provide a penetrative sealer to all
pavements except asphalt.
Sample Panels: Provide a 1m square sample
panel of all pavements ona pallet such that it
can be moved around site as required to
compare to finished work.
Slip resisitance: All pavements to be non-slip as
defined in the BCA
2 P1 Concrete 1 Refer Architect Plans m 0
P2 Concrete 2 Refer Architect Plans m 0
4 P3 Unit paving on concrete subbase Size: 400 x 400mm each 220
Colour: TBC
Supplier: TBC
Sealed: TBC
4 5 GR1 Gravel mulch Type: 20mm washed river gravel over weedmat m 124
Depth: 100mm
E ;
5 Fences and Barriers
5 1 F1 Fence type 1 - 1800 high to boundary Refer to Refer Architect specifications m 0
5 2 F2 Fence type 2 - Pool Fence Refer to Refer Architect specifications m 0
5 3 HR Handrail and Balustrades Refer to Refer Architect specifications m 0
5 4 BL1 Feature Bollard Refer to Refer Architect specifications Item 23
C SOFTSCAPE
[6 Edging
6 Concrete edge to planting areas Refer to Detail. 150x150mm. m 113
6 Timber edge to planting areas - If ordered Refer to Detail m 0
7 TU Turf- (includes watering costs until PC)
7 1 Imported Soil Blend 100mm deep Soil Blend to AS4419 m 310
Fs 2 Site Topsoil with amendments -1F ORDERED Amendments tobe added tothe 100mm deep im: 0
site topsoil SPREAD BY CIVIL.
- Soil amendments for Site topsoil should include
the following: Gypsum at (2.5t/ha) following top
soil spread and Dynamic Lifter (2kg/10m2).
Please allow for both Turftopsoil and planting
soil
7 3 TU Turf Agrade ‘Legend’ turf supplied byJimboomba Turf m? 310
8 PA Planting Areas - (includes watering costs until PC)
8 1 Soil Blend - Site Topsoil Minimum depth 300mm deep Site soil amended im? 773
with gypsum. Mound to 450mm to centre of beds
8 2 Soil Blend - Imported - If ordered 300mm deep Soil Blend to AS4419. Mound to m- 0
450mm to centre of beds. Submit sample for
apporval prior to install.
8 3 Fertiliser Apply dynamic lifter or approved equivalent as
per specification
8 4 Mulch to planting areas Forest Litter mulch 100mm deep m 773
5 M3 - Site mulch (install only) Site Mulch m 0
6 DG1 -Decorative Gravel - 100 mm thickness Gravel Type: 20mm washed river gravel m2 0
9 Planting Stock
9 1 100 Lt stock Refer to Plant Schedule Item 0
IS 2 45 Lt stock Refer to Plant Schedule Item 65
9 3 25 Lt stock Refer to Plant Schedule Item 3
9 4 300mm pots Refer to Plant Schedule Item 483
9 5 200mm pots Refer to Plant Schedule Item 118
9 6 140mm pots Refer to Plant Schedule Item 2026
9 Relocation of existing palm trees. Refer Planting Plan Item 2
9 7 Tube stock- Native tube min. 75mm Refer to Plant Schedule Item 0
9 8 Slow release nutrient bags Each 2697
9 9 Water retention additive foreach plant Green Harvest Rainsaver Water crystals or Each 2697
approved similar
* JFP Arborist to inspect plants at nursery to ensure compliance with NATSPEC - Specifying trees
10 PC Post Practical Completion - Plant Establishment Period and Maintenance
Note Practical Completion will be given at the time the Local Authority provides
On Maintenance or Superintendant certifies completion.
10 |1 Plant Establishment Period - 12 week period Fortnightly Mowing and turf edging to all turf Week Ais
areas. Fertilising, pruning of street trees as
required and chemical and physical weed
removal toall garden areas. Rubbish removal as
required
10 |2 TU, PA Watering Costs during Plant Establishment Period Over the 12 week period watering is required to Week Le
(Provisional Sum) maintain healthy plant growth. Allow for min. 15
waters (3-1st week, 2-2nd week, 1 per week for
Note: the cost of watering prior to Practical following 10 weeks).
Completion being given is to be allowed for in Note: Rates per water will be used if additional
deco it pig ihe watering is required oras a credit ifthere is
preliminaries or within softscape rates
adequate rainfall. (30mm per week adequate
rainfall). Requirement: Advise superintendent if
All water dockets are to be provided to demonstrate ~ ) Req a : :
dvol f ; additional watering is required due to hot
MINE ance lame bw Lenne, weather / dry conditions over and above the
provisional 15 waters.
Should the weather be excessively dry and/or
hot and additional watering is required notify
superintendent at once. Plant deaths due to
watering will be replaced at the constractors
expense.
10 |3 RV Watering Costs during Plant Establishment Period Over the 12 week period watering is required to Week 12
(Provisional Sum) maintain healthy plant growth. Allow for min. 15
waters (3-1st week, 2-2nd week, 1 per week for
Note: the cost of watering prior to Practical following 10 weeks).
Completion being given is to be allowed for in Note: Rates per water will be used if additional
as ‘ sraaed watering is required oras a credit ifthere is
preliminaries or within softscape rates
adequate rainfall. (30mm per week adequate
infall). Requi it: Advi intendent if
All water dockets are to be provided to demonstrate eon } Pee esiet eigreues Tl ih
5 dvol f z additional watering is required due to hot
emiing ancivelome onwalenng weather / dry conditions over and above the
provisional 15 waters.
Should the weather be excessively dry and/ or
hot and additional watering is required notify
superintendent at once. Plant deaths due to
watering will be replaced at the constractors
expense.
11 PC Post Practical Completion - Ongoing Maintenance
Note Practical Completion will be given at the time the Local Authority provides
On Maintenance or Superintendant certifies completion.
11 ji TU&PA |Ongoing Maintenance after Plant Establishment Fortnightly Mowing and turf edging to all turf Month 9
to areas. Fertilising, pruning of street trees as
Turf & Planting Areas including podium if applicable required and chemical and physical weed
removal to all garden areas. Rubbish removal as
required
11 |2 RV Ongoing Maintenance after Plant Establishment Fortnightly maintenance as per Specification Months 3
to such as edging to all adjacent turfareas,
Revegetation Areas fertilising, pruning of vegetation as required,
maintenance ofstakes & tree guards, and
chemical and physical weed removal to all
rehabilitation areas. Rubbish removal as
required to achieve On & Off Maintenance.
11 13 DLP Defects Liability Period - 52 weeks Weeks
OOSA DOMAIN APARTMENTS - SCHEDULE
ATRIA NATO TAN ANT
LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE
APPROVAL ISSUE
I] i}
If
E OP WORKS 2024-04-08 NH NH ME
D OP WORKS 2021-10-11 HQ HQ WA
c OP WORKS 2018-02-23 ME ME WA
B DRAFT OP WORKS 2018-02-06 ME ME WA
A PRELIMINARY 2018-01-15 ME ME WA
ISSUE: DETAILS: DATE: DES: DC: QA:
JFOP
URBANCONSULTANTS
PRAIA
PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
URBAN DESIGNERS BRISBANE - JFP House
SURVEYORS ”~=«76 Ernest Street,
South Brisbane Qld 4101
ENGINEERS P 07 3012 0100 W www.jfp.com.au
LANDSCAPE ARCHITECTS _jrp URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045
LIENT: CLIENT NAME HERE PTY LTD
COUNTRY CLUB VILLAGES
PROJECT TITLE:
NOOSA DOMAIN
APARTMENTS
WALTER HAY DRIVE,
NOOSAVILLE.
SCALE:
COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD,
ae
COVER SHEET
SCHEDULE
PLAN NUMBER: B3730LA1-DA1 LA VM
M1717L_A1
CSO2E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Proposed Landscape OPW plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.