PROPOSED MIXED-USE DEVELOPMENT
MYALL STREET, COOROY
TRAFFIC IMPACT ASSESSMENT

16 MAY 2014

PREPARED FOR

VERVE BUILDING DESIGN & CONCEPTS
Log in to download the original file

MCU14_0056 - Attachment K -Traffic Impact Assessment.pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 94 pages

Page 2

DOCUMENT CONTROL RECORD

DOCUMENT




REV   PURPOSE   DATE   AUTHOR   REVIEWER   APPROVED   SIGNED




COPYRIGHT




DISCLAIMER

Page 3

TABLE OF CONTENTS


1.0 INTRODUCTION                                        1




2.0 EXISTING CONDITIONS                                 2




3.0 PROPOSED DEVELOPMENT                                6




4.0 TRAFFIC OPERATIONS                                  12




5.0 CONCLUSIONS AND RECOMMENDATIONS                     23




DRAWING SK001 SITE ACCESS INTERSECTION SIGHT DISTANCE

APPENDIX A:    TRAFFIC VOLUME COUNTS
APPENDIX B:    DEVELOPMENT PLANS
APPENDIX C:    INTERSECTION ANALYSIS
APPENDIX D:    FORECAST TURNING VOLUMES
APPENDIX E:    CODE RESPONSES

Page 4

 

PEKOL TRAFFIC & TRANSPORT

1.0 INTRODUCTION

1d

1.2

1.3

Background

In March 2014, Pekol Traffic & Transport (PTT) was commissioned by Verve Building Design &
Concepts to undertake a traffic impact assessment for a proposed mixed use development on a greenfield

site at Myall Street, Cooroy. The location of the subject site is shown in Figure 1.1.

Figure 1.1: SITE LOCALITY

 

  

Conroy Golf Club

  
 

Ashmond
Villa

  

 

 

 

 

Aim
The aim of this assessment was to evaluate the proposed development in terms of its likely peak hour

traffic generation, impact on the surrounding road network, site access operations, parking and service

arrangement.

Scope of Report

This report begins by summarising the characteristics of the existing road network (Chapter 2), followed
by a description of the scope and scale of the proposed development, including a consideration of its likely
traffic operating characteristics (Chapter 3). The latter are then overlayed on top of future year peak hour
traffic operations on the adjacent road network to identify potential future traffic impacts (Chapter 4).

The report concludes with a summary of key findings (Chapter 5).

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 1

Page 5

 

PEKOL TRAFFIC & TRANSPORT

2.0 EXISTING CONDITIONS

2.1 Subject Site

The subject site is located at no. 125 Myall Street and comprises Lot 4 on SP248479. It is bordered by
Ferrells Road to the north-west, Myall Street to the north-east and the Bruce Highway ramps to the south-

east and south-west. The site is currently vacant as shown in the aerial view presented in Figure 2.1.

Figure 2.1: AERIAL VIEW OF THE SITE

 

2.2 Road Network

Myall Street is a strategic state controlled arterial road which links the Bruce Highway to the town of
Cooroy. It typically has one lane of traffic in each direction and is undivided. In the vicinity of the site, it
has a speed limit of 60km/hr, which increases to 80km/hr approximately 250m to the south of the

intersection with Ferrells Road.

Ferrells Road meets Myall Street at a three-arm, priority-controlled intersection. This intersection
includes a left turn deceleration lane and a channelised right turn (CHR) treatment on the major road.

Ferrells Road is a local road which runs south-west from the intersection with Myall Street. Ferralls Road

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 2

Page 6

 

PEKOL TRAFFIC & TRANSPORT

2.3

meets Overlander Ave at a three-arm priority intersection. The priority route is a right-angle bend from
Ferralls Road to Overlander Ave, with the extension of Ferralls Road, a short cul-de-saq, forming the

minor arm.

Traffic Volumes

To assist in the quantification of existing road network operations proximate to the site, turning
movement surveys were conducted on Thursday 14 March 2014 and Saturday 16 March 2014 at the

following intersections:

w= Myall Street / Ferrells Road priority controlled intersection
== Myalil Street/Bruce Highway ramps priority controlled intersection

The weekday evening and Saturday peak periods are shown in Table 2.1, along with the key operational

attributes of the adjacent intersections. The traffic count survey data is provided in Appendix A.

Table 2.1: INTERSECTION ATTRIBUTES
Evening Peak
Peak Hour 4:00pm — 5:00pm 4:00pm — 5:00pm.
Volume (vph) 880 860
% Heavy Vehicle 4% 5%
Peak Flow Factor 98% 98%
Saturday Peak
Peak Hour 10:45am - 11:45am 11:00am — 12:00pm
Volume (vph) 750 730
% Heavy Vehicle 2% 3%
Peak Flow Factor 96% 96%

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 3

Page 7

 

PEKOL TRAFFIC & TRANSPORT

2.5 Intersection Operations

A series of SIDRA analyses were conducted to quantify the existing traffic operations at the Myall Street /
Ferrells Road priority-controlled intersection and the Myall Street/Bruce Highway ramps priority
controlled intersection. The existing intersection layouts and the equivalent SIDRA representations are

shown in Figures 2.2 and 2.3 respectively.

Figure 2.2: MYALL STREET / FERRELLS ROAD

 

yall Street (nest

=

 

Mall Street (South)

 

 

Figure 2.3: MYALL STREET / BRUCE HIGHWAY RAMPS

 

yal Street {north}

f'

sdiney hewn son
4}

 

 

yall street (South

 

 

These analyses were based on the traffic count data presented in Appendix A with:

==: gap acceptance parameters as per Table 13.7 of Main Roads’ Road Planning and Design Manual

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 4

Page 8

           LEVEL OF           DEGREE OF SATURATION
RATING
           SERVICE     SIGNALS      ROUNDABOUT     PRIORITY




PEAK HOUR &                 95%
SCENARIO              DOS   QUEUE   CRITICAL MOVEMENT

Page 9

 

PEKOL TRAFFIC & TRANSPORT

The results indicate that both intersections currently experience “excellent” operations under existing
weekday peak hour evening and Saturday peak hour conditions. Both intersections also currently operate

well within DMTR’s acceptable limit during the weekday evening and Saturday peak hours.

3.0 PROPOSED DEVELOPMENT

3.1. Site Layout

The proposed development incorporates a new mixed-use facility comprising retail, recreational and

commercial land uses. The proposed development includes the following components:

service station (244m? GFA) and car wash
fast-food restaurant with drive-thru (292m? GFA)
food retail store (920m? GFA)

self-storage units (1,110m? GFA)

tourist park (27 caravan parks and 10 cabins)

The layout of the proposed development is attached in Appendix B and is shown in Figure 3.1.

Figure 3.1: SITE LAYOUT

 

Q

 

 

 

 

 

 

 

 

 

 

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 6

Page 10

 

PEKOL TRAFFIC & TRANSPORT

3.2

Access Arrangements

It is proposed to provide one point of vehicular access to the site from Myall Street and one point of

access from Ferrells Road, as shown in Figure 3.1.

It is proposed that the Myall Street site access would be an all-movements intersection. Therefore, it is our
recommendation that the proposed access intersection is designed to include a left turn auxiliary
deceleration lane (AUL) and a channelised right turn treatment (CHR) to minimise the disruption to

through traffic on Myall Street.

For an 80kph speed environment (the posted speed to the south of the proposed access), the deceleration
lane would need to be at least 70m long, including taper, based on the Road Planning and Design Manual.
The location of an existing culvert on Myall Street to the south of the site limits the length of deceleration
lane that can be provided without costly culvert extension works. It is therefore recommended that an

80m left turn auxiliary lane is provided, as shown in Figure 3.2.

In a 60km speed environment, the posted speed to the north of the proposed access) the length of right
turn lane should be 80m, including the taper and storage area, as shown in Figure 3.3. It is recommended

that the design of the access intersection be conditioned to any development permission.

Figure 3.2: LEFT TURN AUXILIARY LANE

 

 

 

 

 

60m 80m 10m 415,0m 80m

 

 

 

 

 

 

 

 

 

   

End of line marking and
island defined by design
vehicle turning path

it 11 # Double barrier line not to be used
Site Access this side of the island
Road

 

 

 

 

 

 

 

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 7

Page 11

 

PEKOL TRAFFIC & TRANSPORT

3.3

A basic intersection arrangement (comprising a basic right turn and left turn on the major road) is
proposed for the Ferrells Road site access intersection, which is considered appropriate given the low

vehicle volumes anticipated to use this access.

Parking

3.3.1 Requirement
The most relevant parking standards from the Noosa Plan are as follows:

m= retail store: Type 2 shop - one space per 15m”, or part thereof, of use area for areas in excess of
100m?

m= fast food restaurant: Type 1 food and beverages - one space per 10m”, or part thereof of any outdoor
dining area

m= _ self-storage units: Type 1 warehouse — 1 space per 500m’ of use area

== tourist park: Type 2 caravan park — a space per caravan site and 1 visitor space per 10 caravan sites

The service station use would not have an on-site mechanical workshop. Therefore, the service station
parking provision from the Noosa Plan, based on the number of service bays, has not been used with the

Type 2 shop standard applied instead.

Table 3.1 sets out the parking standards described above and the associated number of spaces to be

provided under each.

Table 3.1: PARKING REQUIREMENTS

Service Station 1 space per 15m?

Fast-food Restaurant 292m? 1 space per 10m? 30
Retail 920m? 1 space per 15m? 62
Self-Storage 1,110m? 1 space per 500m? 3

37 sites (27 caravan parks & 10 1 space per site + 1 space

Tourist Park 41

cabins) per 10 sites for visitors
TOTAL 153

3.3.2 Provision

It is proposed to provide a total of 224 car parking spaces for the development. Of the total provision, 180
car parking spaces would be for the retail, fast-food restaurant and service station component of the

development including four spaces allocated for persons with a disability. A total of three parking spaces

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 8

Page 12

 

PEKOL TRAFFIC & TRANSPORT

3.4

are to be provided for the self-storage units with 41 spaces for the tourist park, comprising one space per

site and four visitor spaces.

The proposed car parking provision is well in excess of the minimum number of parking spaces required

under the Noosa Plan.

3.3.3. Design

The layout and provision of on-site car parking is generally consistent with the requirements of
Australian Standard AS2890.1:2004 Parking Facilities Part 1: “Off-Street Car Parking” in terms of bay

dimensions, aisle widths, vehicle circulation and manoeuvring. This is typified by:

m= 2.6m x 5.4m vehicle parking spaces
== 6.6m wide parking aisles

— 7.2m- 8m wide circulation aisles

3.3.4 People With Disabilities

Four Person with Disability (PWD) spaces are proposed which is in line with the standards set out in
AS2890.6: 2009 Parking Facilities Part 6: “Off-Street Parking For People With Disabilities”, which
requires one space for every 50 car parking spaces. As demonstrated in the site layout plans, the four
PWD spaces are appropriately sized and located in close proximity to access points, in accordance with

the requirements of AS2890.6.

Sight Distance

The Road Planning and Design Manual requires a safe intersection sight distance (SISD) of 121m for a
60kph speed limit and 181m for a 80kph speed limit, based on the desirable 2.5 second driver reaction
time. The topography to the north is flat. However, the land to the south slopes upwards towards the
intersection with the Bruce-Highway Ramps. Therefore, we have assumed a 4% downgrade correction
factor to the southern Myall Street approach to the site access intersection, which increases the required

SISD on this approach to 187m.

On-site observations confirm that this sight distance can achieved in both directions along Myall Street at
the proposed site access location. The site distance to the south would require the removal of some
vegetation both within the site and the road reserve. Some signage within the road reserve may need to be

relocated.

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 9

Page 13

PEKOL TRAFFIC & TRANSPORT

A sketch of the proposed access location showing the measurement of the safe intersection stopping sight

distance is shown in Figure 3.4 and attached in Drawing SKO01.

Figure 3.4: SIGHT DISTANCE

 

 

The site access on Ferrells Road should be located sufficiently far away from the intersection of
Overlander Ave that appropriate sight distance can be obtained. The 90 degree bend in the major arm at
the Ferrells Road / Overlander Ave would slow traffic down to below 40km/hr. On this basis we
recommend a minimum of 72m sight distance be provided. It is our view that the proposed location of

the access on Ferrells Road will achieve the appropriate sight distance.

3.5 Line Marking/Signage

It is recommended that pavement arrows be painted at the site access intersections and throughout the

internal layout to emphasise the intended directions of vehicle flow.

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 10

Page 14

 

PEKOL TRAFFIC & TRANSPORT

3.6

3.7

Queuing

It is estimated that there is a combined queuing distance (at the two points of vehicular access) of around
70m (sufficient to accommodate more than 10 cars). This is considered appropriate for the number of on-

site parking spaces (ie 216 spaces) and complies with the requirements of AS2890.1.

We estimate that the site would be able to accommodate at least 10 vehicles queuing for the fuel pumps

(not including those parked at the pumps).

Servicing
An on-site loading / refuse collection area is proposed at the rear of the service station, restaurant and
retail components of the development. The Noosa Plan does not specify a design vehicle for this type and

size of development. However, this service area could comfortably accommodate a 12.5m heavy rigid
vehicle (HRV).

It is expected that all servicing movements would use the Myall Street access intersection and any amenity

impacts associated with increased heavy vehicle movements on Ferrells Road would be limited.

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 11

Page 15

 

PEKOL TRAFFIC & TRANSPORT

4.0 TRAFFIC OPERATIONS

4.1

4.2

Development Staging

It is standard practice when analysing future year traffic operations to adopt a ten year design horizon

from the year of full occupation. Therefore, the following development staging has been adopted:

== Traffic Counts: 2014
== Development Application: 2014
== Construction and Operation: 2016
— Operation plus 10 years: 2026

4.1.1 Background Traffic Growth

A background traffic growth rate of 2.2% per annum has been applied to observed traffic volumes. This
rate is consistent with the Department of Local Government, Planning and Sport and Recreation’s 2011
forecast growth rate for resident population in the Sunshine Coast region. The application of this rate

equates to a 30% increase in local traffic volumes over the next 12 years (2014 to 2026).

Traffic Generation

4.2.1 Service Station and Restaurant Drive-Through

The service centre trip generation rates contained in the DTMR Road Planning and Design Manual and
in the RTA Guide to Traffic Generating Developments are not considered suitable for this study as they
relate to service stations in urban areas. Service stations located on rural highways are likely to experience

significantly different traffic generation rates and patterns to those in urban areas.

We have previously undertaken surveys of traffic generation for three BP highway service centres located
on the Pacific Highway at Coomera and Staplyton, and on the Bruce Highway at Caboolture. Each of
these service centres comprises a petrol filling station with associated food / restaurant outlets (including

drive-through facilities).

The surveys identified the number of vehicles entering each site on a typical weekday, between the hours
of 7am - 5pm. The traffic volumes along the adjacent section of highway were also recorded to calculate

the site traffic generation as a proportion of the passing highway traffic.

Figure 4.1 shows the percentage of turn-in traffic as a proportion of (one-way) passing highway traffic for

each of the three service centre sites during the network peak hours. The data indicates that that during

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 12

Page 16

PEKOL TRAFFIC & TRANSPORT

 

the typical morning and evening peak hours, the volume of vehicles entering from the highway did not

exceed 9% of the passing traffic'.

Therefore, for this assessment we have adopted a traffic generation rate of 9% of the passing (two-way)

highway traffic for both the service station and restaurant drive-through components of the development.

In the absence of corresponding data for the typical Saturday peak hour, we have adopted the same traffic

generation rate.

 

 

Figure 4.1: PERCENTAGE OF TURN-INS AS A PROPORTION OF PASSING TRAFFIC
10.0%
Morning Peak Evening Peak
9.0%

8.0%

7.0%

6.0%

5.0%

4.0%

3.0%

2.0%

Percent Turn-Ins as a Proprotion of Passing Hihway Traffic

1.0%

0.0%

 

 

7:00

7:30

8:00

 

Hour Commencing

 

4:00

™ Coomera
@ Stapylton
® Morayfield

 

 

The predicted peak hour traffic generation for the proposed development, comprising both the service

station and restaurant drive-through component of the development is shown in Table 4.1.

 

' Note that as the surveyed period concluded at 5pm there is only one hour of data for the evening peak period

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX

13

Page 17

         PASSING HIGHWAY TRAFFIC
                                   TRIPS GENERATED (VPH)
PEAK              (VPH)
PERIOD   NORTH   SOUTH     TWO-                      TWO-
                                   IN      OUT
         BOUND   BOUND     WAY                       WAY

Page 18

                                               2
         Traffic Generation = 15vph per 100m




                                  2
           Retail Unit GLA 920m




         SCALE                         TRIPS       IN:OUT     IN:OUT
PERIOD                RATE
          (m2)                        (Veh/hr)      SPLIT   SPLIT (VEHS)

Page 19

           SCALE           TRIPS     IN:OUT     IN:OUT
LAND USE           RATE
            (m2)          (Veh/hr)    SPLIT   SPLIT (VEHS)




           SCALE           TRIPS     IN:OUT     IN:OUT
LAND USE           RATE
            (m2)          (Veh/hr)    SPLIT   SPLIT (VEHS)

Page 20

 

PEKOL TRAFFIC & TRANSPORT

4.2.5 Total

Table 4.5 summarises the traffic generation for each component of the proposed development and for all

the future year development scenarios.

Table 4.5: TOTAL TRAFFIC GENERATION

 

 

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 17

Page 21

 

PEKOL TRAFFIC & TRANSPORT

4.3 Traffic Distribution

The distribution of the proposed development related traffic on the existing road network has been
estimated based on the directional split inherent in the traffic surveys. We have made the assumption that
90% of traffic would arrive and depart the site using the main access on Myall Street with 10% using the

Ferrells Road access. The expected development traffic distribution is shown in Figure 4.3.

4.4 Intersection Performance
A series of SIDRA analyses were conducted for the following intersections:

== Myall Street / Site Access priority intersection
m= Myall Street / Ferrells Road priority intersection
== § Myall Street / Bruce Highway Ramps priority intersection

These were based on the turning movement forecasts presented in Appendix D for the following

scenarios:

Existing year (2014)

Opening year (2016) pre-development
Opening year (2016) post-development
Future year (2026) pre-development

Future year (2026) post-development

The results of these analyses are presented in Appendix C and discussed in more detail below. We have
not undertaken a SIDRA assessment of the Ferrells Road / Site Access intersection due to the low levels of

traffic anticipated to use this intersection.

4.4.1 Myall Street / Site Access

The SIDRA analysis of the Myall Street / Site Access priority intersection was undertaken using the
intersection layout as shown in Figure 4.4. The results of these analyses are attached in Appendix C, and

are summarised in Table 4.6.

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 18

Page 22

                Overlander Ave                                                      Myall Street




                         5%                                                                   5% 45%
                                                                            5%
                                        5%
                                                            Ferrells Road

                                 5%                             5%


                                             5% 5%                                      40%
Bruce Highway




                                                                                              45%
                                                                            40%
                                                                            50%
                                         SITE
                                                                                  45%




                                                                                              10% 40%
                                                                            40%
                                      Bruce Highway Ramps




                                                                                        5%




                                                                                    Myall Street

Page 23

PEKOL TRAFFIC & TRANSPORT

Figure 4.4: SITE ACCESS LAYOUT

f

 

Myall Street (North)

ssanay aS

 

Myall Street (South)

 

 

 

Table 4.6: MYALL STREET / SITE ACCESS INTERSECTION OPERATIONS
Evening Peak
2016 Post Development 23% 0.5 Myall Street (North) - Ahead
2026 Post Development 28% 0.7 Myall Street (North) - Ahead
Saturday Peak
2015 Post Development 19% 0.4 Myall Street (North) - Ahead
2025 Post Development 23% 0.6 Myall Street (North) - Ahead

Table 4.1 demonstrates that the Myall Street / Site Access intersection is expected to experience
“excellent” operations during all periods. In all post-development scenarios, the 95th percentile queue

lengths are predicted to be minimal.

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 20

Page 24

 

PEKOL TRAFFIC & TRANSPORT

4.4.2 Myall Street / Ferrells Road Intersection

The SIDRA analysis of the Myall Street / Ferrells Road priority intersection was undertaken using the
intersection layout as shown in Figure 2.2. The results of these analyses are attached in Appendix C, and

are summarised in Table 4.7.

Table 4.7: MYALL STREET / FERRELLS ROAD INTERSECTION OPERATIONS
Evening Peak
2014 Existing 23% 0.1 Myall Street (North) - Ahead
2016 Pre Development 24% 0.1 Myall Street (North) - Ahead
2016 Post Development 25% 0.2 Myall Street (North) - Ahead
2026 Pre Development 30% 0.2 Myall Street (North) - Ahead
2026 Post Development 32% 0.3 Myall Street (North) - Ahead
Saturday Peak
2014 Existing 19% 0.1 Myall Street (North) - Ahead
2016 Pre Development 20% 0.1 Myall Street (North) - Ahead
2016 Post Development 22% 0.2 Myall Street (North) - Ahead
2026 Pre Development 25% 0.2 Myall Street (North) - Ahead
2026 Post Development 27% 0.2 Myall Street (North) - Ahead

Table 4.7 demonstrates that the Myall Street / Ferrells Road priority-controlled intersection is expected to
experience “excellent” operations during the morning and evening peak periods. The addition of the

development related traffic is not expected to significantly affect the critical degree of saturation.

4.4.3 Myall Street / Bruce Highway Ramps Intersection

The SIDRA analysis of the Myall Street / Bruce Highway Ramps priority intersection was undertaken
using the intersection layout as shown in Figure 2.3. The results of these analyses are attached in

Appendix C, and are summarised in Table 4.8.

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 21

Page 25

 

PEKOL TRAFFIC & TRANSPORT

Table 4.8: MYALL STREET / RRUCE HIGHWAY RAMP INTERSECTION OPERATIONS
Morning Peak
2014 Existing 21% 0.1 Bruce Highway Ramps - Left
2016 Pre Development 22% 0.1 Bruce Highway Ramps - Left
2016 Post Development 24% 0.2 Bruce Highway Ramps - Left
2026 Pre Development 28% 0.2 Bruce Highway Ramps - Left
2026 Post Development 29% 0.2 Bruce Highway Ramps - Left
Evening Peak
2014 Existing 18% 0.1 Bruce Highway Ramps - Left
2016 Pre Development 19% 0.1 Bruce Highway Ramps - Left
2016 Post Development 20% 0.2 Bruce Highway Ramps - Left
2026 Pre Development 23% 0.2 Bruce Highway Ramps - Left
2026 Post Development 25% 0.2 Bruce Highway Ramps - Left

Table 4.8 demonstrates that the Myall Street / Bruce Highway Ramps intersection is expected to
experience “excellent” operations during the morning and evening peak periods. The addition of the

development related traffic is not expected to significantly affect the critical degree of saturation.

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 22

Page 26

 

PEKOL TRAFFIC & TRANSPORT

5.0

5.1

5.2

CONCLUSIONS AND RECOMMENDATIONS

Conclusions

The proposed development has been evaluated in terms of its impact on the surrounding road network,

site access operations and internal layout. The main points to note are:

it is proposed to redevelop the site to provide a mixed-use development comprising a service

_
station, fast-food restaurant, retail store, self-storage units and tourist park with a total building
GEA of 3,563m?

== _ two points of vehicular access are proposed, one from Myall Street and one from Ferrells Road

== _ the proposed development incorporates 224 car parking spaces across the site, which is consistent
with the Noosa Plan and is expected to adequately cater for the anticipated parking demand

== adequate provision is made for the standing, parking, loading and unloading, access and
manoeuvring of service vehicles and petrol tankers within the development site

m= service vehicles would predominantly use the Myall Street access and any amenity impacts
associated with increased heavy vehicle movements on Ferrells Road would be limited

== _ the development is expected to generate a maximum of 369 vehicle trip ends during the weekday
evening peak period, and 363 vehicle trip ends during the Saturday peak period

== of the weekday evening peak hour traffic generation, 137 vehicle trips are predicted to be new trips
on the network, with the remaining 232 trips being diverted

== of the Saturday peak hour traffic generation, 160 vehicle trips are predicted to be new trips on the
network, with the remaining 203 trips being diverted

m= _ the site access intersection on Myall Street is expected to experience excellent operations during
the opening year (2016) and future year (2026)

m= __ the Myall Street / Ferrells Road intersection is expected to demonstrate ‘excellent’ operations in the
2016 and 2026 scenario

== the Myall Street / Bruce Highway Ramps intersection is expected to demonstrate ‘excellent’
operations in the 2016 and 2026 scenario

Recommendations

Based on our analysis it is recommended that:

a left turn auxiliary deceleration lane (AUL) and a channelised right turn treatment (CHR) be
provided at the Myall Street / Site Access intersection
pavement arrows be painted at the site access crossover and throughout the internal layout to

emphasise the intended directions of vehicle flow

P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 23

Page 27

 

PEKOL TRAFFIC & TRANSPORT

DRAWING SKOO1
SIGHT DISTANCE AT MYALL STREET ACCESS

Page 28

 

 

 

 

   
 

| AMENDMENTS DRN

 

 

 

DATE

 

 

 

 

\

 

  

PEKOL TRAFFIC & TRANSPORT
ABN 96 067 593 962

MYALL STREET, COOROY

r

CHENT: VERVE BUILDING DESIGN & CONCEPTS

 

 

P 07 3839 6771 WWW.PTT.COM.AU
Level G 67 St Pauls Tce Spring Hill Q 4000

 

PEKOL TRAFFIC & TRANSPORT

 

SIGHT DISTANCE

DATE: SCALE: DRAWN:
MAY 2014 1:1250 @A3 CB

 

 

 

 

\

DRAWING NO. REV | JOB NO.
SK001 13-082

 

 

 

 

Page 29

 

PEKOL TRAFFIC & TRANSPORT

APPENDIX A
TRAFFIC VOLUME COUNTS

Page 30

AUSTRAFFIC MANUAL INTERSECTION COUNT
 Site No.:   2
 Location: Myall Street/Bruce Hwy Ramps, Cooroy
Days/Dates: Thursday 13th March 2014
            Saturday 15th March 2014
Summary:     AM Peak : Hour ending - 5:00 PM
              PM Peak : Hour ending - 12:00 PM                                   Myall Street (north)


                                                                    Total                 1         2   3     Total     Movements
                                                                     418                  0        93   327    420    vol
                                                                                                                             AM PEAK
                                                                     4%                   0%       5%   4%     5%     % CV

                                          AM PEAK      PM PEAK       365                  1        61   299    361    vol
                                                                                                                             PM PEAK
                                          vol   % CV   vol   % CV    3%                   0%       3%   3%     3%     % CV




                                  Total   384   5%     307   3%
                                                                                                                                       N

                                   8      361   4%     305   3%


                                   7      23    22%     2    0%




                       To/from Bruce Highway (west)


                                  Total   95    5%     65    3%




                                                             vol     59     2    57       0                    350
                                                AM PEAK
                                                             % CV    2%     0%   2%       0%                   5%
                                                             vol     63     4    59       0                    301
                                                PM PEAK
                                                             % CV    2%     0%   2%       0%                   3%
                                                                    Total   6    5        4                   Total




                                                                                 Myall Street (south)


      Legend
      vol = total vehicle volume
      % CV = percentage of commercial vehicles (trucks and buses)

Page 31

 

Myall Street (north)

AUSTRAFFIC MANUAL INTERSECTION COUNT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sjsjofo]}o OC OOO oO Oo O79 lo sjsjfo]}o So SOF 0 oO O79 lo
mols 855 kK KE Slovo Loe Pole & 2S Fk R Rhroo soe
2° 2°
5 5
5 gqeaddyjJoN}o OC OOO oO oO Olg lo 5 gqeaddyjoN}Se SS SG0 0 © Olg lo
8 8
= =
seen Meay] oo 10 © - + + wee ch seen MeaH] oO a a AK oO + vlgp 6
seen WO 8 8 SX X X Sieve ove seen WO BE SRL RK Kees 962
sIsJXAQ} 0 OC OOOO Oo O79 lo sisyAQ}O OS S800 0 Off lo
feJol]}o m © © 2 @ w A Igy lez feol]}o CON NK AN K|g iz
N N
5 5
E | avoid ioy}o © © Oo © © © ofp lo E | aqeoyddy ion} © © So © © ofp lo
$ $
saiyean AABAHT OD N COCO Fr + Og Is saiyean AARAHTS SOS S00 Oo Olg lo
sgaiyan 1y6i]]}o mo © OD © + ALD gL sgaiyan Iyi]]}o CONN YK WN |g z
sjso{g9}o 0 0 00 0 Oo olg lo s\sjofg9}@ © © 0.0 0 0 olg lo
1eol]}o 02 ON OO O Ke |g z feof] o 2 Oe - + © Olg ly
© ©
5 5
E | ageaiddyionfo oo oo © © Olp lo E | eqeoyddy ion}@ © © So © © ofp lo
3 3
= =
sgpiyan nea] oO 0 0 0 Oo olg lo saya, nea] © © 0.0 0 o olg lo
sgaiyep YbIT]}o CON OC OC Oo HK |g Zz saya, YT] SO 2 S = - - © Oflg iy
sjsjofo]}o OC OOO oO Oo O79 lo sjsjfo]}o So SOF 0 oO O79 lo
Iol|S 2 Roof ow lee us leojjo 222 2 FX 2 w Igor les
ro ro
5 5
5 gqeaddyjJoN}o OC OOO oO oO Olg lo 5 gqeaddyjoN}Se SS SG0 0 © Olg lo
8 8
= =
sqoan Mea] - CC OO Or Olg L seen Mea] O © © ro oo Off L
saya b= 2 Roo Nn ol06 log seiyen 1y6r7}0 2 2 N © + 2 w Igor leg
sIsJXAQ} 0 OC OOOO Oo O79 lo sisyAQ}O OS S800 0 Off lo
~ TOI] o 0 0 0 lO Oo Ol9 lo fol} o © SO 0 Oo Oo Olp lo
s + +
3 =e =
3 3 5
& E | avoid ioy}o © © Oo © © © ofp lo E | aqeoyddy ion} © © So © © ofp lo
2
3 $ $
{3 2
i saya, AARAH]}O OC COO CO oO Olg lo saiyean AARAHTS SOS S00 Oo Olg lo
3
a
=
seoyen ybr]o 0 000 0 oO lp lo soar wr}e © 0 0000 olf lo
sjso{g9}o 0 0 00 0 Oo olg lo s\sjofg9}o © = 00 0 o Off L
eon roll $5 $8 8 B Bless laze roles X 8 FSX & Bess le6z
° °
2¢ 5 5
2 g E | ageaiddyionfo oo oo © © Olp lo E | aqeaiddyionfS 6 5 Oo © © Olp lo
mo > >
gF 3 8
& z sqoiyen Mea] mo t+ ON AA K/|IZ Ih sajiyen Meo] NO NN + A &IOZ 6
seoyan o£ & KR B&B & Sles eve seoyan WoT RR SSR R Biers losz
sjsjOLQ} 0° 0 OOOO oO Olg lo sjsjofQ} 0 SO SO S200 0 Olg lo
Pola ZAR RN Aloo e6 Pol& = SS 2k 2 Rieer 19
a a
5 5
5 gqeaddyjJoN}o OC OOO oO oO Olg lo 5 gqeaddyjoN}Se SS SG0 0 © Olg lo
8 8
= =
sqoan Mea] KH KH CoN Ag 5 seen Mea] OM © 0.0 0 oO Olg z
pb
°
3
5 seen WOR 2 RA SR Row ge seyen WO | O BS 2 RK 2 For les
2 &
&& = > sisjfg}o 0 0 00 oC oO Olg lo sisjokg} © © © O00 Oo olg lo
Serax ae
kag Ss S
ge0AS8 TOI] o 0 0 0 lO Oo Ol9 lo leol]}o Oe © FOC oO Of L
BrsgeuQ - -
o5 ~
Seags z E
= 2 = Ss £ | aqeajddyjonj}o COCO fO CO Oo Olg lo £ | aqeajddyjonjo SC SOS 0 Oo Olg lo
Asa ww g $
SRetses
aeunss 2 2
£ >> 5 5 saya, AARAH]}O OC COO CO oO Olg lo saiyean AARAHTS SOS S00 Oo Olg lo
ASHioOx
sz2E 2
fo) 53 & mt sgiyan 1YBI]]2 So OC OO oO Oo Olg lo siya WB] o° So He SOC oO Oly L
ZARA
. 3 as z SSS2522222 = 22222222
g&s ag us aaacaaaa bead we Sess sot le Deed
Zs 8 n zs 23828382 8 BF glPLsye Irepsunys zs = SF S25 BF SlPOLins lepimes
os 2 go z ¥$¥$H 6 6 HS = ~~ S
~ = =
£Se 28 = =
Amro BH

 

 

Page 32

AUSTRAFFIC MANUAL INTERSECTION COUNT
 Site No.:   1            Weather: Fine
 Location: Myall Street/Ferrells Road, Cooroy
Days/Dates: Thursday 13th March 2014
            Saturday 15th March 2014
Summary: Thurs Peak : Hour ending - 5:00 PM
              Sat Peak : Hour ending - 11:45 AM                                   Myall Street (north)


                                                                    Total                  1         2   3     Total     Movements
                                                                     417                   0        12   420    432    vol
                                                                                                                              THUR PEAK
                                                                     4%                    0%       0%   4%     4%     % CV

                                          THUR PEAK    SAT PEAK      369                   0        16   351    367    vol
                                                                                                                              SAT PEAK
                                          vol   % CV   vol   % CV    2%                    0%       0%   3%     2%     % CV




                                  Total   22    5%     27    0%
                                                                                                                                          N

                                   8      10    0%     18    0%


                                   7      12    8%     9     0%




                              Ferrells Road (west)


                                  Total   30    7%     25    0%

                                                                                                                                          Northbound

                                                                                                                                              426

                                                             vol     426    18    407      1                    433
                                                THUR PEAK
                                                             % CV    4%     11%   4%       0%                   4%                        Southbound

                                                             vol     360     9    351      0                    360                           432
                                                SAT PEAK
                                                             % CV    3%     0%    3%       0%                   3%
                                                                    Total   6     5        4                   Total




                                                                                  Myall Street (south)


      Legend
      vol = total vehicle volume
      % CV = percentage of commercial vehicles (trucks and buses)

Page 33

 

Myall Street (north)

AUSTRAFFIC MANUAL INTERSECTION COUNT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sjsjOLQ} 0° 0 OOOO oO Olg lo sjsjofQ} 0 SO SO S200 0 Olg lo
jejoy]n we wo - S w lez on jejoy]an wo NK KH mo alee et
2° 2°
5 5
£ | aqeajddyilonfo CO OO oO Oo Og lo £ | aqeajddyionjo SO SSO oO oO Op lo
= =
soar Mea] Oo OO OO Fr oO Op lo sean Mea] Oo © © 0.0 0 Oo Olg 0
sgaiya, y6T}.uN UN - HO HK MD HY NZ lol. sgaiyan yi} ON H- - OM WIZE gL
sIsJXAQ} 0 OC OOOO Oo O79 lo sisJAQ}O OS = SFC Oo Of L
eol]t t Ke on t om & (Zz (am pejoy]t Oo Ke He HK oO eK oly 6
N N
5 5
E | avoid ioy}o © © Oo © © © ofp lo E | aqeoyddy ion} © © So © © ofp lo
$ $
sapien fneay]o Oo Or HK Oo Ke L saya, neay]o © © Oo KH oO Of lo
soar yor}+ + - aw + 7 ole i soar wor} t @ - eH ww oly 6
sjso{g9}o 0 0 00 0 Oo olg lo s\sjofg9}@ © © 0.0 0 0 olg lo
fejol]t+ oO nN t+ OO AN KlyE gL fejoljo ee NN t © HK [zz 6
© ©
5 5
— | aqeayjddyjonjo 0 OOF oO Oo Ol”9 lo £ | aqeojddyjonj}o SC So Oo Co oO Olg lo
= =
sgpiyen nea] Oo oO NO mM Oo § fg z sgpiyen neay]o © © Oo - oc Off lo
saya, Yb] + mo OH +m OM — Ww \gz OL saaiyan 1Y6T] OK HK NN ODM © K|IZ 6
sjsjOLQ} 0° 0 OOOO oO Olg lo sjsjofQ} 0 SO SO S200 0 Olg lo
x cS) g
rmolS Sr & 8 8 S Sls 0b Polk SSR SR BS Xo ise
ro ro
5 5
£ | aqeajddyilonfo CO OO oO Oo Og lo £ | aqeajddyionjo SO SSO oO oO Op lo
= =
seen Meay]o ww + - H + w wee oy seen Meay| eo oO - AN oOo eH wl 6
sepyen 68 SSSSERS Slaw bee sepiyen HOTS GB & RSL & NR Izso eve
sIsJXAQ} 0 OC OOOO Oo O79 lo sisyAQ}O OS S800 0 Off lo
~ Teol]}o oor OO oO Of L feol]}o CS Or © Oo Off lo
3 t t
3 =e =
3 3 5
& E | avoid ioy}o © © Oo © © © ofp lo E | aqeoyddy ion} © © So © © ofp lo
2
3 $ $
{3 2
i saya, AARAH]}O OC COO CO oO Olg lo saiyean AARAHTS SOS S00 Oo Olg lo
3
=
seen yr]o oor OOO Ol L seoyen yor}o oO O- OO Ol 0
sjso{g9}o 0 0 00 0 Oo olg lo s\sjofg9}@ © © 0.0 0 0 olg lo
5 ear 2
on rio]S 8SSSR B Rize loz rojo FR 8 BK SB & Kise9 Ise
° °
ze 5 2
aé E | ageoyddy ion}o © © © © © oO ofp lo E | eqeoyddy ion}@ © © So © © ofp lo
= S S
a 3 3
= = =
E sgaiyan Aeay}in mo oH Oo AN HW ~ IDE sb sgaiyan Mea MN NON - ON + lZz 6
s
=
seoyenor]S 8 SS 5 LS Nex zov sepyen 468 © BBLS Slee eve
sjsjOLQ} 0° 0 OOOO oO Olg lo sjsjofQ} 0 SO SO S200 0 Olg lo
joy]+ om wot a + thz eb jejoy|t + a © am w Aiee ob
a a
5 5
£ | aqeajddyilonfo CO OO oO Oo Og lo £ | aqeajddyionjo SO SSO oO oO Op lo
= =
soar Mea] Oo OO OO Fr oO Op lo seen Mea] Oo © © OO + Oo Off lo
a sgaiya, y67]}t mo om ot N + + IOz zh saya YybT|+ +N ON A MH NYE lol
2 5
= VU > = gsjspofg}o Co OOo Oo oO Olg lo gsisyofg9}o SC SOS 0 oO Olg lo
st
gltt+ x
eBooks
SgZgVCTaASt
2 G Ss TOI] o 0 0 0 lO Oo Ol9 lo fol} o © SO 0 Oo Oo Olp lo
SeGaunrt - ~
SU ER E E
Ss oO oO
= ES Ss £ | ageayddyjonfo 0 OC OO oo ofp lo £ | ageayddyjonfo 0 SO Oo oC oO ofp lo
Bsg ye $ g
gangs 2 2
£ >> 5 5 saya, AARAH]}O OC COO CO oO Olg lo saiyean AARAHTS SOS S00 Oo Olg lo
ASHioOx
sz2E 2
“~SR22n seoyen ybr]o 0 000 0 oO lp lo soar wr}e © 0 0000 olf lo
ZARA
y 4 3 s
- 2 Ss. = = 2222232283
228 “4 ¥3 Beers =e a peo us Ses: ss peo
Zs 8 n 2 zt ©3232 8 8 S/POLiNZ Jrepsunyy zt Sr aFs FH LIPOLae leoomes
s Bo z ¥YPHK 6 GS z Eertretsdaaa
237 5. = = oe YN SN
2 gS is = =
Ama BH

 

 

Page 34

 

PEKOL TRAFFIC & TRANSPORT

APPENDIX B
DEVELOPMENT PLANS

Page 35

                                             

RPD DEVELOPMENT ASSESSMENT:
LOT 4 on T_T oomomn®ere
SP240679 BUILDING USE SITE COVERAGE
PARISH OF TEWANTIN aap 2 2
COUNTY OF MARCH FUEL SALES/SHOP = 14d e TOTAL SITE AREA = 66,643m
x LOCAL GOVERNHENT; NOOSA © FAST FOOD RESTAURANT - 292m? TOTAL USEABLE SITE AREA  - 50,333m?
© SELF STORAGE = 1,110m? © TOTAL BUILDING GFA. = 3,563m?
ADMIN, OFFICE ~ 50m2
STORAGE UNS - 1,060m2 TOTAL PAVED SURFACE ~ 30,276m?
© TOURIST PARK - 820m? 2
ADM HE Sten ¢ TOTAL LANDSCAPING ~ 16,494m
CABINS - 320m2
AMENITIES = 180m2 « — BUILDING/SITE COVERAGE - 67%

“BUILDING” INCLUDES ENCLOSED BUILDINGS AND PAVED IMPERVIOUS

. e ANCILLARY USE (CAR WASH) - 14m? AREAS (LE. CARPARKING AREAS AND PAVED WALKWAYS)

FAST FOOD & D/THRU TOTAL BUILDING GFA ~ 3,543n? « LANDSCAPING COVERAGE - 33%
GFA. - 292m2 (EXCLUDES FUEL DISPENSING FORECOURT)
SALES/SHOP 2 PLEASE NOTE:
FA 1h ¢ FUEL DISPENSING FORECOURT = - 538m = AREAS INDICATED ABOVE ARE APPROXIMATE ONLY.
(UNENCLOSED BUILOING FOOTPRINT) - LANDSCAPING SHOWN INDICATIVE ONLY. REFER TO
LANDSCAPE DRAWINGS FOR DETAILS, PREPARED BY
SAUNDERS HAVILL

LANDSCAPING BUFFER TO
EXISTING RESIDENTIAL

 

4.0m HIGH
ACOUSTIC BARRIER:

EXISTING HEADWALL TO
BE MODIFIED/RELCOATED

NEW ENTRY EXIT
= ALL TURNS
4.0m HIGH
ACOUSTIC

   
  

ENTRY ONLY J

  
 

é

  
 

4.0m HIGH
ACOUSTIC

   

SURPLUS SITE FOR FUTURE
DEVELOPMENT
APPROX, AREA = 5,808m2

  
             

OVERLAND
AVENUE

4.0m HIGH
ACOUSTIC BARRIER-
5.0m HIGH
ACOUSTIC BARRIER

    

     

BIO-RETENTION

BASN A /7/
4

LADSCAPING BUFFER TO
EXISTING RESIDENTIAL

=
BESS
SS

         

   

STORMWATER
DETENTION AREA

        

     

10.0m EXCLUSIONS ZONE TO
EXISTING VEGETATION DRIP
LINE, SHOWN DASHED.

 

2
*

TP,
LAND AREA ~

5.0m HIGH
ACOUSTIC BARRER-

              

AREA TO BE RETAINED AS

NATURAL VEGETATION
APPROX. LAND AREA - 13,250m2

SELF STORAGE UNITS
52 UNITS - 20.4m2 ea,
TOTAL LAND AREA ~ 4,770n2

    
   

   
   

i
|
| s
. ~~ a
me
fone SSB SSS See eee maar
HGH CABINS x 10
~~ ___ ACOUSTIC BARRIER GFA. - 32m? each
BETES TOTAL GRA, - 3202
SITE PLAN BRY strato
SCALE 1750 @At; 11500 @A3 CE HIGH WA y

 

 

 

DA ISSUE

 

 

 

LOCALITY PLAN.

NOT TO SCALE

 

   

thie craig.

dimensions on site ptnt commencement of works

   

 

ae oe Dar

 

 

cf expe | oe | on issue
8 | ziost4 | GW | Se PLAN UPDATED, MAN BULONG ALTERED
A_| wos | op | Prete 6suE

Vorve

Building Design é& Concepts

 

 

 

 

 

[BULDING DESIGNERS LICENCE No, 1002212 PH. 0412 384
257 HLNVAROAD, ARANAHILS, QLD Exgeng@varetdzor

 

Imagine o create o delive

DO commercial /industrial/retai
0D fastfood restaurant design

0 travel centre / service stations
0D project concept tocompletto

 

Projet Descitin
PROPOSED MIXED USE DEVELOPMENT
CNR. MYALL STREET & FERRELLS ROAD,
COOROY, QLD.

Urwig Tite

PROPOSED SITE LAYOUT

Droving Krier

14004-DA02

 

Page 36

 

PEKOL TRAFFIC & TRANSPORT

APPENDIX C
INTERSECTION ANALYSIS

Page 37

SITE LAYOUT
    Site: 2014 PM Existing
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2014 PM Existing
Giveway / Yield (Two-Way)




Created: Thursday, 15 May 2014 2:21:32 PM                 Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                            www.sidrasolutions.com
Project: P:\2012-13\13 -082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 38

LANE SUMMARY
     Site: 2014 PM Existing
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2014 PM Existing
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1               20    4.0    1806     0.011    100          5.6      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             428     4.0    1901    0.225     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           448     4.0            0.225                  0.3          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             442     4.0    1901    0.233     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               13    4.0     681    0.019     100          8.3      LOS A            0.1           0.5    Short       50   0.0    0.0
 Approach           455     4.0            0.233                  0.3          NA           0.1           0.5

 West: Ferrells Road
 Lane 1               24    4.0     717    0.034     100          8.7      LOS A            0.1           0.8     Full      500   0.0    0.0
 Approach             24    4.0            0.034                  8.7      LOS A            0.1           0.8

 Intersection       927     4.0            0.233                  0.5          NA           0.1           0.8


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Thursday, 15 May 2014 2:22:24 PM              Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 39

LANE SUMMARY
     Site: 2016 PM Pre Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2016 PM Pre-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1               21    4.0    1806    0.012     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             447     4.0    1901    0.235     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           468     4.0            0.235                  0.4          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             462     4.0    1901    0.243     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               15    4.0     661    0.022     100         11.4      LOS B            0.1           0.5    Short       50   0.0    0.0
 Approach           477     4.0            0.243                  0.4          NA           0.1           0.5

 West: Ferrells Road
 Lane 1               25    4.0     686    0.037     100         11.6      LOS B            0.1           0.9     Full      500   0.0    0.0
 Approach             25    4.0            0.037                 11.6      LOS B            0.1           0.9

 Intersection       971     4.0            0.243                  0.7          NA           0.1           0.9


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:05:39 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 40

LANE SUMMARY
     Site: 2016 PM Post Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2016 PM Post-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1               21    4.0    1806    0.012     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             472     4.0    1901    0.248     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           493     4.0            0.248                  0.4          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             489     4.0    1901    0.258     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               22    4.0     638    0.035     100         11.7      LOS B            0.1           0.9    Short       50   0.0    0.0
 Approach           512     4.0            0.258                  0.5          NA           0.1           0.9

 West: Ferrells Road
 Lane 1               34    4.0     674    0.050     100         11.7      LOS B            0.2           1.2     Full      500   0.0    0.0
 Approach             34    4.0            0.050                 11.7      LOS B            0.2           1.2

 Intersection      1038     4.0            0.258                  0.8          NA           0.2           1.2


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:07:56 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 41

LANE SUMMARY
     Site: 2026 PM Pre Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2026 PM Pre-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1               26    4.0    1806    0.015     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             556     4.0    1901    0.292     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           582     4.0            0.292                  0.4          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             574     4.0    1901    0.302     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               17    4.0     553    0.030     100         12.7      LOS B            0.1           0.7    Short       50   0.0    0.0
 Approach           591     4.0            0.302                  0.4          NA           0.1           0.7

 West: Ferrells Road
 Lane 1               32    4.0     543    0.058     100         13.3      LOS B            0.2           1.4     Full      500   0.0    0.0
 Approach             32    4.0            0.058                 13.3      LOS B            0.2           1.4

 Intersection      1204     4.0            0.302                  0.7          NA           0.2           1.4


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:09:41 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 42

LANE SUMMARY
     Site: 2026 PM Post Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2026 PM Post-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1               26    4.0    1806    0.015     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             579     4.0    1901    0.305     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           605     4.0            0.305                  0.4          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             600     4.0    1901    0.316     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               26    4.0     532    0.049     100         13.1      LOS B            0.2           1.2    Short       50   0.0    0.0
 Approach           626     4.0            0.316                  0.6          NA           0.2           1.2

 West: Ferrells Road
 Lane 1               41    4.0     537    0.076     100         13.3      LOS B            0.3           1.8     Full      500   0.0    0.0
 Approach             41    4.0            0.076                 13.3      LOS B            0.3           1.8

 Intersection      1273     4.0            0.316                  0.9          NA           0.3           1.8


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:11:04 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 43

LANE SUMMARY
     Site: 2014 SAT Existing
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2014 SAT Existing
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1                9    2.0    1831    0.005     100          5.6      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             369     2.0    1925    0.192     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           379     2.0            0.192                  0.2          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             369     2.0    1925    0.192     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               17    2.0     765    0.022     100          7.6      LOS A            0.1           0.5    Short       50   0.0    0.0
 Approach           386     2.0            0.192                  0.4          NA           0.1           0.5

 West: Ferrells Road
 Lane 1               28    2.0     855    0.033     100          7.6      LOS A            0.1           0.8     Full      500   0.0    0.0
 Approach             28    2.0            0.033                  7.6      LOS A            0.1           0.8

 Intersection       794     2.0            0.192                  0.5          NA           0.1           0.8


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Thursday, 15 May 2014 2:24:55 PM              Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 44

LANE SUMMARY
     Site: 2016 SAT Pre-Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2016 SAT Pre-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1                9    2.0    1831    0.005     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             386     2.0    1925    0.201     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           396     2.0            0.201                  0.2          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             386     2.0    1925    0.201     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               18    2.0     748    0.024     100         10.7      LOS B            0.1           0.6    Short       50   0.0    0.0
 Approach           404     2.0            0.201                  0.5          NA           0.1           0.6

 West: Ferrells Road
 Lane 1               29    2.0     834    0.035     100         10.4      LOS B            0.1           0.9     Full      500   0.0    0.0
 Approach             29    2.0            0.035                 10.4      LOS B            0.1           0.9

 Intersection       829     2.0            0.201                  0.7          NA           0.1           0.9


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:33:44 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 45

LANE SUMMARY
     Site: 2016 SAT Post-Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2016 SAT Post-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1                9    2.0    1831    0.005     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             415     2.0    1925    0.215     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           424     2.0            0.215                  0.2          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             419     2.0    1925    0.218     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               26    2.0     719    0.037     100         11.0      LOS B            0.1           0.9    Short       50   0.0    0.0
 Approach           445     2.0            0.218                  0.7          NA           0.1           0.9

 West: Ferrells Road
 Lane 1               38    2.0     804    0.047     100         10.6      LOS B            0.2           1.1     Full      500   0.0    0.0
 Approach             38    2.0            0.047                 10.6      LOS B            0.2           1.1

 Intersection       907     2.0            0.218                  0.9          NA           0.2           1.1


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:36:25 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 46

LANE SUMMARY
     Site: 2026 SAT Pre-Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2026 SAT Pre-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1               13    2.0    1831    0.007     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             480     2.0    1925    0.249     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           493     2.0            0.249                  0.2          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             480     2.0    1925    0.249     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               22    2.0     651    0.034     100         11.6      LOS B            0.1           0.8    Short       50   0.0    0.0
 Approach           502     2.0            0.249                  0.5          NA           0.1           0.8

 West: Ferrells Road
 Lane 1               37    2.0     708    0.052     100         11.4      LOS B            0.2           1.2     Full      500   0.0    0.0
 Approach             37    2.0            0.052                 11.4      LOS B            0.2           1.2

 Intersection      1032     2.0            0.249                  0.8          NA           0.2           1.2


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:40:35 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 47

LANE SUMMARY
     Site: 2026 SAT Post-Dev
Myall Street / Ferrells Road Intersection
14-082 Myall Street, Cooroy
2026 SAT Post-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1               13    2.0    1831    0.007     100          8.2      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2             508     2.0    1925    0.264     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           521     2.0            0.264                  0.2          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1             513     2.0    1925    0.266     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               32    2.0     623    0.051     100         12.0      LOS B            0.2           1.2    Short       50   0.0    0.0
 Approach           544     2.0            0.266                  0.7          NA           0.2           1.2

 West: Ferrells Road
 Lane 1               46    2.0     683    0.068     100         11.6      LOS B            0.2           1.6     Full      500   0.0    0.0
 Approach             46    2.0            0.068                 11.6      LOS B            0.2           1.6

 Intersection      1112     2.0            0.266                  1.0          NA           0.2           1.6


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 12:42:58 PM          Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Ferrells Rd\Myall St - Ferrells Rd.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 48

SITE LAYOUT
    Site: 2026 SAT Post-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2026 SAT Post-Development
Stop (Two-Way)




Created: Thursday, 15 May 2014 2:18:58 PM                 Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                            www.sidrasolutions.com
Project: P:\2012-13\13 -082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6

Page 49

LANE SUMMARY
    Site: 2014 PM Existing
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2014 PM Existing
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              62     5.0    2112    0.029     100          8.5     LOS A            0.1           0.7     Full      500   0.0    0.0
 Approach            62     5.0            0.029                  8.5     LOS A            0.1           0.7

 North: Myall Street (North)
 Lane 1             344     5.0    1889    0.182     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              98     5.0    1793    0.055     100          5.6     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           442     5.0            0.182                  1.3         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             380     5.0    1793    0.212     100          5.7     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              24     5.0    1425    0.017     100          6.2     LOS A            0.0           0.3     Full      500   0.0    0.0
 Approach           404     5.0            0.212                  5.7     LOS A            0.0           0.3

 Intersection       908     5.0            0.212                  3.7         NA           0.1           0.7


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Thursday, 15 May 2014 2:09:25 PM              Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 50

LANE SUMMARY
    Site: 2016 PM Pre-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2016 PM Pre-Dev
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              65     5.0    1554    0.042     100         11.4     LOS B            0.1           1.1     Full      500   0.0    0.0
 Approach            65     5.0            0.042                 11.4     LOS B            0.1           1.1

 North: Myall Street (North)
 Lane 1             360     5.0    1889    0.191     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2             102     5.0    1793    0.057     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           462     5.0            0.191                  1.8         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             397     5.0    1793    0.221     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              25     5.0    1138    0.022     100          9.5     LOS A            0.1           0.4     Full      500   0.0    0.0
 Approach           422     5.0            0.221                  7.7     LOS A            0.1           0.4

 Intersection       949     5.0            0.221                  5.1         NA           0.1           1.1


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:31:53 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 51

LANE SUMMARY
    Site: 2016 PM Post-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2016 PM Post-Dev
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              68     5.0    1503    0.046     100         11.5     LOS B            0.2           1.2     Full      500   0.0    0.0
 Approach            68     5.0            0.046                 11.5     LOS B            0.2           1.2

 North: Myall Street (North)
 Lane 1             388     5.0    1889    0.206     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2             109     5.0    1793    0.061     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           498     5.0            0.206                  1.8         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             425     5.0    1793    0.237     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              25     5.0    1105    0.023     100          9.6     LOS A            0.1           0.5     Full      500   0.0    0.0
 Approach           451     5.0            0.237                  7.7     LOS A            0.1           0.5

 Intersection      1017     5.0            0.237                  5.1         NA           0.2           1.2


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:33:49 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 52

LANE SUMMARY
    Site: 2026 PM Pre-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2026 PM Pre-Dev
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              81     5.0    1384    0.059     100         11.8     LOS B            0.2           1.5     Full      500   0.0    0.0
 Approach            81     5.0            0.059                 11.8     LOS B            0.2           1.5

 North: Myall Street (North)
 Lane 1             447     5.0    1889    0.237     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2             127     5.0    1793    0.071     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           575     5.0            0.237                  1.8         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             494     5.0    1793    0.275     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              32     5.0    1031    0.031     100          9.9     LOS A            0.1           0.6     Full      500   0.0    0.0
 Approach           525     5.0            0.275                  7.7     LOS A            0.1           0.6

 Intersection      1181     5.0            0.275                  5.1         NA           0.2           1.5


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:35:32 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 53

LANE SUMMARY
    Site: 2026 PM Post-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2026 PM Post-Dev
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              84     5.0    1335    0.063     100         11.9     LOS B            0.2           1.6     Full      500   0.0    0.0
 Approach            84     5.0            0.063                 11.9     LOS B            0.2           1.6

 North: Myall Street (North)
 Lane 1             476     5.0    1889    0.252     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2             135     5.0    1793    0.075     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           611     5.0            0.252                  1.8         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             522     5.0    1793    0.291     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              32     5.0     999    0.032     100        10.0      LOS B            0.1           0.6     Full      500   0.0    0.0
 Approach           554     5.0            0.291                  7.7     LOS A            0.1           0.6

 Intersection      1248     5.0            0.291                  5.1         NA           0.2           1.6


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:36:53 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 54

LANE SUMMARY
    Site: 2014 SAT Existing
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2014 SAT Existing
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              66     3.0    2214    0.030     100          8.3     LOS A            0.1           0.8     Full      500   0.0    0.0
 Approach            66     3.0            0.030                  8.3     LOS A            0.1           0.8

 North: Myall Street (North)
 Lane 1             315     3.0    1913    0.165     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              65     3.0    1818    0.036     100          5.6     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           380     3.0            0.165                  1.0         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             321     3.0    1818    0.177     100          5.7     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2                2    3.0    1495    0.001     100          6.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           323     3.0            0.177                  5.7     LOS A            0.0           0.0

 Intersection       769     3.0            0.177                  3.6         NA           0.1           0.8


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Thursday, 15 May 2014 2:11:08 PM              Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 55

LANE SUMMARY
    Site: 2016 SAT Pre-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2016 SAT Pre-Development
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              69     3.0    1684    0.041     100         11.2     LOS B            0.1           1.0     Full      500   0.0    0.0
 Approach            69     3.0            0.041                 11.2     LOS B            0.1           1.0

 North: Myall Street (North)
 Lane 1             328     3.0    1913    0.172     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              68     3.0    1818    0.038     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           397     3.0            0.172                  1.4         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             336     3.0    1818    0.185     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2                2    3.0    1209    0.002     100          9.3     LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           338     3.0            0.185                  7.6     LOS A            0.0           0.0

 Intersection       804     3.0            0.185                  4.9         NA           0.1           1.0


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:43:53 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 56

LANE SUMMARY
    Site: 2016 SAT Post-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2016 SAT Post-Development
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              74     3.0    1627    0.045     100         11.3     LOS B            0.2           1.1     Full      500   0.0    0.0
 Approach            74     3.0            0.045                 11.3     LOS B            0.2           1.1

 North: Myall Street (North)
 Lane 1             362     3.0    1913    0.189     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              77     3.0    1818    0.042     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           439     3.0            0.189                  1.5         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             368     3.0    1818    0.203     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2                2    3.0    1170    0.002     100          9.4     LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach           371     3.0            0.203                  7.6     LOS A            0.0           0.0

 Intersection       883     3.0            0.203                  4.9         NA           0.2           1.1


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:47:10 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 57

LANE SUMMARY
    Site: 2026 SAT Pre-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2026 SAT Pre-Development
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              86     3.0    1546    0.056     100         11.4     LOS B            0.2           1.4     Full      500   0.0    0.0
 Approach            86     3.0            0.056                 11.4     LOS B            0.2           1.4

 North: Myall Street (North)
 Lane 1             408     3.0    1913    0.214     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              85     3.0    1818    0.047     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           494     3.0            0.214                  1.4         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             417     3.0    1818    0.229     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2                3    3.0    1114    0.003     100          9.6     LOS A            0.0           0.1     Full      500   0.0    0.0
 Approach           420     3.0            0.229                  7.6     LOS A            0.0           0.1

 Intersection      1000     3.0            0.229                  4.9         NA           0.2           1.4


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:48:37 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 58

LANE SUMMARY
    Site: 2026 SAT Post-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2026 SAT Post-Development
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              91     3.0    1489    0.061     100         11.5     LOS B            0.2           1.5     Full      500   0.0    0.0
 Approach            91     3.0            0.061                 11.5     LOS B            0.2           1.5

 North: Myall Street (North)
 Lane 1             442     3.0    1913    0.231     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              93     3.0    1818    0.051     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           535     3.0            0.231                  1.4         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             451     3.0    1818    0.248     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2                3    3.0    1076    0.003     100          9.7     LOS A            0.0           0.1     Full      500   0.0    0.0
 Approach           454     3.0            0.248                  7.6     LOS A            0.0           0.1

 Intersection      1079     3.0            0.248                  4.9         NA           0.2           1.5


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:50:03 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC

Page 59

 

PEKOL TRAFFIC & TRANSPORT

APPENDIX D
FORECAST TURNING VOLUMES

Page 60

2014 PM EXISTING




                                   Overlander Ave                                                    Myall Street




                                                                                                                    12   420
                                                                                          10
                                                                                          13
                                                                          Ferrells Road



                                                                                                19      407




                                                                                                                         433
                   Bruce Highway




                                                       SITE
                                                                                                        426




                                                                                                                    93   327
                                                                                          361
                                                    Bruce Highway Ramps                   23




                                                                                                2       57




                                                                                                     Myall Street

Page 61

2014 SAT EXISTING




                                    Overlander Ave                                                   Myall Street




                                                                                                                    16   351
                                                                                           18
                                                                                            9
                                                                           Ferrells Road



                                                                                                 9      351
                    Bruce Highway




                                                                                                                         360




                                                        SITE
                                                                                                        360




                                                                                                                    62   299
                                                                                           305
                                                     Bruce Highway Ramps                    2




                                                                                                 4      59




                                                                                                     Myall Street

Page 62

2016 PM PRE-DEVELOPMENT

                                                                                                                               Growth Factor   1.04




                                   Overlander Ave                                                    Myall Street




                                                                                                                    13   439
                                                                                          10
                                                                                          14
                                                                          Ferrells Road




                                                                                                20      425




                                                                                                                         452
                   Bruce Highway




                                                       SITE
                                                                                                        445




                                                                                                                    97   342
                                                                                          377
                                                    Bruce Highway Ramps                   24




                                                                                                2       60




                                                                                                     Myall Street

Page 63

2016 SAT PRE-DEVELOPMENT

                                                                                                                               Growth Factor   1.04




                                    Overlander Ave                                                   Myall Street




                                                                                                                    17   367
                                                                                           19
                                                                                            9
                                                                           Ferrells Road




                                                                                                 9      367




                                                                                                                         376
                    Bruce Highway




                                                        SITE
                                                                                                        376




                                                                                                                    65   312
                                                                                           319
                                                     Bruce Highway Ramps                    2




                                                                                                 4      62




                                                                                                     Myall Street

Page 64

2026 PM PRE-DEVELOPMENT

                                                                                                                                Growth Factor   1.30




                                   Overlander Ave                                                    Myall Street




                                                                                                                    16    545
                                                                                          13
                                                                                          17
                                                                          Ferrells Road




                                                                                                25      528




                                                                                                                          562
                   Bruce Highway




                                                       SITE
                                                                                                        553




                                                                                                                    121   425
                                                                                          469
                                                    Bruce Highway Ramps                   30




                                                                                                3       74




                                                                                                     Myall Street

Page 65

2026 SAT PRE-DEVELOPMENT

                                                                                                                                Growth Factor   1.30




                                    Overlander Ave                                                    Myall Street




                                                                                                                     21   456
                                                                                           23
                                                                                           12
                                                                           Ferrells Road




                                                                                                 12      456




                                                                                                                          467
                    Bruce Highway




                                                        SITE
                                                                                                         467




                                                                                                                     81   388
                                                                                           396
                                                     Bruce Highway Ramps                    3




                                                                                                 5       77




                                                                                                      Myall Street

Page 66

2016 PM DEVELOPMENT TRAFFIC




                      Overlander Ave                                                  Myall Street




                                   3                                                                  8     26
                                                                                 8
                                              8
                                                                 Ferrells Road

                                       3                               8


                                                  8   8                                      23
      Bruce Highway




                                                                                                     72 -   41
                                                                                 64
                                                                                 80

                                             SITE
                                                                                      72 -   41




                                                                                                      7     27
                                                                                 27

                                           Bruce Highway Ramps




                                                                                             3




                                                                                      Myall Street

Page 67

2026 PM DEVELOPMENT TRAFFIC




                      Overlander Ave                                                  Myall Street




                                   3                                                                  9     25
                                                                                 9
                                              9
                                                                 Ferrells Road

                                       3                               9


                                                  9   9                                      22
      Bruce Highway




                                                                                                     83 -   52
                                                                                 74
                                                                                 92

                                             SITE
                                                                                      83 -   52




                                                                                                      7     27
                                                                                 27

                                           Bruce Highway Ramps




                                                                                             3




                                                                                      Myall Street

Page 68

2016 SAT DEVELOPMENT TRAFFIC




                      Overlander Ave                                                  Myall Street




                                   4                                                                  8     32
                                                                                 8
                                              8
                                                                 Ferrells Road

                                       4                               8


                                                  8   8                                      28
      Bruce Highway




                                                                                                     73 -   37
                                                                                 65
                                                                                 81

                                             SITE
                                                                                      73 -   37




                                                                                                      8     32
                                                                                 32

                                           Bruce Highway Ramps




                                                                                             4




                                                                                      Myall Street

Page 69

2026 SAT DEVELOPMENT TRAFFIC




                      Overlander Ave                                                  Myall Street




                                   4                                                                  9     31
                                                                                 9
                                              9
                                                                 Ferrells Road

                                       4                               9


                                                  9   9                                      27
      Bruce Highway




                                                                                                     82 -   46
                                                                                 73
                                                                                 91

                                             SITE
                                                                                      82 -   46




                                                                                                      8     32
                                                                                 32

                                           Bruce Highway Ramps




                                                                                             4




                                                                                      Myall Street

Page 70

2016 PM POST-DEVELOPMENT




                                   Overlander Ave                                                    Myall Street




                                                                                                                    21    465
                                                                                          18
                                                       8                                  14
                                                                          Ferrells Road

                                                                               8


                                                           8   8                                20      448




                                                                                                                    72    411
                                                                                          64
                                                                                          80
                   Bruce Highway




                                                       SITE
                                                                                                72      403




                                                                                                                    104   369
                                                                                          404
                                                    Bruce Highway Ramps                   24




                                                                                                2       63




                                                                                                     Myall Street

Page 71

2016 SAT POST-DEVELOPMENT




                                   Overlander Ave                                                    Myall Street




                                                                                                                    25   398
                                                                                          27
                                                       8                                   9
                                                                          Ferrells Road

                                                                               8


                                                           8   8                                9       394




                                                                                                                    73   339
                                                                                          65
                                                                                          81
                   Bruce Highway




                                                       SITE
                                                                                                73      339




                                                                                                                    73   344
                                                                                          350
                                                    Bruce Highway Ramps                    2




                                                                                                4       66




                                                                                                     Myall Street

Page 72

2026 PM POST-DEVELOPMENT




                                   Overlander Ave                                                        Myall Street




                                              3                                                                         25         570
                                                                                              22
                                                           9                                  17
                                                                              Ferrells Road

                                                    3                              9


                                                               9   9                                25      550




                                                                                                                             83      510
                                                                                              74
                                                                                              92
                   Bruce Highway




                                                           SITE
                                                                                                    83      501




                                                                                                                             128     452
                                                                                              496
                                                        Bruce Highway Ramps                   30




                                                                                                    3       77




                                                                                                         Myall Street

Page 73

2026 SAT POST-DEVELOPMENT




                                   Overlander Ave                                                    Myall Street




                                                                                                                    30   487
                                                                                          32
                                                       9                                  12
                                                                          Ferrells Road

                                                                               9


                                                           9   9                                12      483




                                                                                                                    82   422
                                                                                          73
                                                                                          91
                   Bruce Highway




                                                       SITE
                                                                                                82      422




                                                                                                                    88   420
                                                                                          428
                                                    Bruce Highway Ramps                    3




                                                                                                5       81




                                                                                                     Myall Street

Page 74

 

PEKOL TRAFFIC & TRANSPORT

APPENDIX E
CODE RESPONSES

Page 75

MYALL STREET, COOROY

                                                                   Access to state-controlled roads state code
Performance outcomes                                 Acceptable outcomes                                                         Response   Comment
Location of the direct vehicular access to the state-controlled road
PO1 Any road access location to the state-           AO1.1 Any road access location to the state-controlled road from
controlled road from adjacent land does not          adjacent land complies with a decision under section 62 of the TIA.
compromise the safety and efficiency of the state-   OR all of the following acceptable outcomes apply
controlled road.
                                                     AO1.2 Any road access location for the development is provided from a       Complies   The nature of the development requires
                                                     lower order road where an alternative to the state-controlled road                     access from a state controlled road.
                                                     exists. AND
                                                     AO1.3 A traffic impact assessment certified by a Registered Professional    Complies   A Traffic Impact Assessment has been
                                                     Engineer of Queensland (RPEQ) demonstrates that the development                        prepared, which demonstrates that the
                                                     will maintain the safety and efficiency of the state-controlled road. AND              transport network has sufficient capacity
                                                                                                                                            to accommodate anticipated development
                                                                                                                                            movements
                                                     AO1.4 Any road access location meets the sight distance requirements        Complies   Sight distance requirements in both
                                                                                                                           nd
                                                     outlined in Volume 3, Part 3 of the Road planning and design manual, 2                 directions are met.
                                                     edition, Department of Transport and Main Roads, 2013. AND
                                                     AO1.5 Any road access location is not located adjacent to an existing or    Complies   The proposed access is not located
                                                     planned functional area of an intersection in accordance with Volume 3,                adjacent to an existing or planned
                                                                                                              nd
                                                     parts 4 and 4A of the Road planning and design manual, 2 edition,                      intersection
                                                     Department of Transport and Main Roads, 2013. AND
                                                     AO1.6 Any road access location does not conflict with any adjacent          Complies   The road access location does not conflict
                                                     lands’ access location and operation.                                                  with any adjacent point of access.
                                                     Editor’s note: In order to demonstrate that the acceptable outcomes can
                                                     be achieved, it is recommended that a traffic impact assessment,
                                                     certified by an RPEQ, be provided. It should be prepared in accordance
                                                     with the Guidelines for assessment of road impacts of development
                                                     (GARID), Department of Main Roads, 2006, and the requirements of
                                                                                                                        nd
                                                     Volume 3, parts 4 and 4A of the Road planning and design manual, 2
                                                     edition, Department of Transport and Main Roads, 2013, SIDRA analysis
                                                     or traffic modelling.

Direct access to a limited access road
PO2 Access to a limited access road is in            No acceptable outcome is prescribed.                                        Not

                                                                                        page 1

Page 76

                                                                     Access to state-controlled roads state code
Performance outcomes                                  Acceptable outcomes                                                            Response     Comment
accordance with the approved limited access                                                                                          applicable
policy.
Editor’s note: Limited access roads are declared by
the chief executive under section 54 of the TIA.
Details can be accessed by contacting the
appropriate DTMR regional office.

Number of road accesses to the state-controlled road
PO3 The number of road access locations to the        AO3.1 Development does not increase the number of road access                  Complies     A single point of access from the site to
state-controlled road maintains the safety and        locations to the state-controlled road.                                                     the state controlled road is proposed.
efficiency of the state-controlled road.
PO4 The number of road access locations to the        AO4.1 Where multiple road access locations to the premises exist,              Complies     A single access to the state controlled
state-controlled road is rationalised to maintain     access is rationalised to reduce the overall number of road access                          road is proposed.
the safety and efficiency of the state-controlled     locations to the state-controlled road. AND
road.                                                 AO4.2 Shared or combined road access locations are provided for                Not
                                                      adjoining land having similar uses to rationalise the overall number of        applicable
                                                      direct accesses to the state-controlled road.
                                                      Editor’s note: Shared road access locations may require easements to
                                                      provide a legal point of access for adjacent lots. If this is required, then
                                                      the applicant must register reciprocal access easements on the titles of
                                                      both of the lots for the shared access.

Design vehicle and traffic volume
PO5 Any road access location maintains the safety     AO5.1 Any road access location meets the minimum standards                     Complies     The access has been designed to
and efficiency of the state-controlled road.          associated with the design vehicle.                                                         accommodate an articulated vehicle and
                                                      Editor’s note: The design vehicle to be considered is the same as the                       petrol fuel tanker.
                                                      design vehicle set under the relevant local government planning
                                                      scheme. AND
                                                      AO5.2 Any road access location is designed to accommodate the                  Complies     It has been demonstrated that the access
                                                      forecast volume of vehicle movements in the peak periods of operation                       intersection can accommodate future
                                                      or conducting the proposed use of the premises. AND                                         forecast vehicle volumes.
                                                      AO5.3 Any road access location is designed to accommodate 10 year              Complies     As above.
                                                      traffic growth past completion of the final stage of development. AND
                                                      AO5.4 Any road access location, for an urban activity, is designed in          Not
                                                                                                                                     applicable
                                                                                           page 2

Page 77

                                                                    Access to state-controlled roads state code
Performance outcomes                                 Acceptable outcomes                                                           Response     Comment
                                                     accordance with the relevant local government standards or IPWEAQ R-
                                                     050, R-051 and R-053 drawings. AND
                                                     AO5.5 Any road access location for all other uses other than urban            Complies     The access has been designed in
                                                     activities is designed in accordance with Volume 3, parts 4 and 4A of the                  accordance with the Road Plannign and
                                                                                          nd
                                                     Road planning and design manual, 2 edition, Department of Transport                        Design Manual
                                                     and Main Roads, 2013.

Internal and external manoeuvring associated with direct vehicular access to the state-controlled road
PO6 Turning movements for vehicles entering and      AO6.1 The road access location provides for left in and left out turning      Not          The road access intersection would cater
exiting the premises via the road access location    movements only. AND                                                           applicable   for all movements.
maintain the safety and efficiency of the state-     AO6.2 Internal manoeuvring areas on the premises are designed so the          Complies     The design vehicle will be able to access
controlled road.                                     design vehicle can enter and leave the premises in a forward gear.                         and egress the site in a forward gear.
                                                     Editor’s note: The design vehicle to be considered is the same as the
                                                     design vehicle set under the relevant local government planning
                                                     scheme.

PO7 On-site circulation is suitably designed to      AO7.1 Provision of on-site vehicular manoeuvring space is provided to         Complies     On-sire manoeuvring space is provided
accommodate the design vehicle associated with       ensure the flow of traffic on the state-controlled road is not                             and there would be no adverse impact on
the proposed land use, in order to ensure that       compromised by an overflow of traffic queuing to access the site in                        vehicle flow on the state controlled road.
there is no impact on the safety and efficiency of   accordance with AS2890—Parking facilities. AND
the state-controlled road.                           AO7.2 Mitigation measures are provided to ensure that the flow of             Complies     Mitigation measures are proposed to
                                                     traffic on the state-controlled road is not disturbed by traffic queuing to                prevent queuing on the state controlled
                                                     access the site.                                                                           road.

Temporary vehicular road access location to the state-controlled road
PO8 Any proposed temporary road access               No acceptable outcome is prescribed.                                          Not
locations ensure that the safety and efficiency of                                                                                 applicable
the state-controlled road is maintained.
Editor’s note: Temporary road access locations
may be conditioned to ensure the temporary
nature of the access. Where appropriate, use of
the temporary access may be restricted to the
approved type and number of vehicles, and the
times the temporary access is able to be used will
also be limited.

                                                                                          page 3

Page 78

                                                                   Access to state-controlled roads state code
Performance outcomes                                Acceptable outcomes                                                          Response     Comment
Vehicular access to local roads within 100 metres of an intersection with a state-controlled road
PO9 Development having road access to a local       AO9.1 The road access location to the local road is located as far as        Not
road within 100 metres of an intersection with a    possible from where the road intersects with the state-controlled road       applicable
state-controlled road maintains the safety and      and does not compromise the existing operation or any future upgrades
efficiency of the state-controlled road.            to the intersection or state-controlled road. AND
                                                    AO9.2 The road access location to the local road network is in               Not
                                                    accordance with Volume 3, parts 4 and 4A of the Road planning and            applicable
                                                                     nd
                                                    design manual, 2 edition, Department of Transport and Main Roads,
                                                    2013, and is based on the volume of traffic and speed design of both the
                                                    local road and intersecting state-controlled road for a period of 10 years
                                                    past completion of the final stage of development. AND
                                                    AO9.3 Vehicular access to the local road and internal vehicle circulation    Not
                                                    is designed to remove or minimise the potential for vehicles entering the    applicable
                                                    site to queue in the intersection with the state-controlled road or along
                                                    the state-controlled road itself.




                                                                                        page 4

Page 79

MYALL STREET, COOROY                                                                                                                                      Response column key:
                                                                                                                                                               Achieved
                                                                                                                                                              P/S Performance solution
19.3      Transport infrastructure and network design state code                                                                                              N/A Not applicable

Table 19.3.1: All development
                                                                       Transport infrastructure and network design state code
Performance outcomes                             Acceptable outcomes                                             Response       Comment
All state transport infrastructure – except state-controlled roads
PO1 Development does not compromise the          AO1.1 Any impact from the development on the safe and           Complies       The Traffic Impact Assessment has demonstrated the
safe and efficient management or operation       efficient management and operation of the state transport                      impact of the development on the surrounding road network.
of state transport infrastructure or transport   corridor or transport network is identified and mitigated.                     Mitigation measures and upgrade works have been
networks.                                        Editor’s note: A traffic impact assessment will assist in                      proposed.
                                                 addressing this acceptable outcome. A traffic impact
                                                 assessment should identify any upgrade works required to
                                                 mitigate impacts on the safe and efficient management and
                                                 operation of the state transport corridor.
PO2 Development does not compromise              AO2.1 Written advice has been provided by DTMR that there
planned upgrades to state transport              are no planned upgrades of state transport infrastructure or
infrastructure or the development of future      future state transport corridors which will be compromised by
state transport infrastructure in future state   the development.
transport corridors.                             OR both of the following acceptable outcomes apply

                                                 AO2.2 The layout and design of the proposed development         Complies       The layout and design of the development does not
                                                 accommodates planned upgrades to adjacent state transport                      compromise planned upgrades or future state controlled
                                                 infrastructure in the state transport corridor. AND                            transport corridors.
                                                 AO2.3 The layout and design of the development does not
                                                 compromise the delivery of state transport infrastructure in
                                                 future state transport corridors.
                                                 Editor’s note: A traffic impact assessment will assist in
                                                 addressing this acceptable outcome.

State-controlled roads
PO3 Development does not compromise the          AO3.1 Any impact from the development on the safe and           Complies       The Traffic Impact Assessment quantifies the impact of the
safe and efficient management or operation       efficient management and operation of the state-controlled                     development on the state controlled road and identifies
of state-controlled roads.                       road is identified and mitigated.                                              appropriate mitigation measures.
Editor’s note: A traffic impact assessment       Editor’s note: A traffic impact assessment will assist in
will assist in addressing this performance

                                                                                          page 1

Page 80

                                                                  Transport infrastructure and network design state code
Performance outcomes                        Acceptable outcomes                                            Response        Comment
outcome.                                    addressing this acceptable outcome.

PO4 Development does not compromise         AO4.1 Written advice has been provided by DTMR that there      Complies        The impact of the development does not compromise
planned upgrades of the state-controlled    are no planned upgrades of state-controlled roads or future                    planned upgrades or future state controlled transport
road network or delivery of future state-   state-controlled roads which will be compromised by the                        corridors.
controlled roads.                           development. OR
                                            AO4.2 Any impact from the development does not
                                            compromise planned upgrades of the state-controlled road
                                            network or the delivery of future state-controlled roads.
                                            Editor’s note: A traffic impact assessment will assist in
                                            addressing this acceptable outcome.

PO5 Upgrade works on, or associated with,   AO5.1 Upgrade works for the development are consistent with    Complies        Proposed road upgrade works are in accordance with the
                                                                                                      nd
the state-controlled road network are       the requirements of the Road planning and design manual, 2                     Road Planning and Design Manual.
undertaken in accordance with applicable    edition, Department of Transport and Main Roads, 2013. AND
standards.                                  AO5.2 The design and staging of upgrade works on or
                                            associated with the state-controlled road network are
                                            consistent with planned upgrades.

PO6 Development does not impose traffic     AO6.1 New roads proposed as part of the development are        Complies        The development road hierarchy is appropriate.
loadings on the state-controlled road       consistent with the road hierarchy adopted by the relevant
network which could be accommodated on      local government, and new lower order roads do not connect
the local road network.                     directly to a state-controlled road. AND
                                            AO6.2 Where the opportunity is available, development          Complies        Access to a lower category road is proposed.
                                            provides for road access locations to lower order roads. AND
                                            AO6.3 Where possible, the layout and design of the             Complies        Some local traffic likely to utilise access to lower category
                                            development encourages traffic generated by the                                road.
                                            development to use lower order roads.




                                                                                     page 2

Page 81

MYALL STREET, COOROY

Driveways and Carparking Code
Specific Outcome                                               Acceptable Solutions/Probable Solutions                    Compliance

14.113 General

O1 Vehicular access does not adversely impact on safety,       S1.1 Vehicular access is located and designed in           The vehicle access locations are designed in accordance
capacity and operations of the existing or planned road        accordance with AUSTROADS-Guide to Traffic                 with AUSTROADS and the Road Planning and Design
network, the proposed driveway, cycleways or pedestrian        Engineering Practice requirements for sight distance       Manual, with appropriate sight distance.
pathway systems.
                                                               and Section 3 of AS2890.1 Parking Facilities; AND

                                                               S1.2 Only one footpath crossing is provided22; AND         A single vehicular access is provided from Myall Street
                                                                                                                          with a single point of access from Ferrells Road.

                                                               S1.3 Driveways, other than within any setback have a       Appropriate grades will be used at the vehicle access
                                                               maximum grade in accordance with Section 3 of              locations
                                                               AS/NZS 2890.1

O2 Driveways and crossovers—                                   S2.1 Design of the driveway across the footpath is in      The access driveway to Ferrells Road will be designed in
a) are suitable and safe for their intended use; and           accordance with Council’s Standard Drawings 9002 or        accordance with Council specifications.
b) match Council infrastructure.                               9005 as appropriate for the particular type of
                                                               development as annotated on the drawings; AND

                                                               S2.2 Driveways are designed and constructed in             As above.
                                                               accordance with Council Standard Drawings 9014,
                                                               9019, 9020, 9021, as appropriate for the particular type
                                                               of development as annotated on the drawings; AND

                                                               S2.3 The change in grades in the driveways and ramps       Appropriate grades will be used within the
                                                               is in accordance with Section 3 of AS2890.1 Parking        development site.
                                                               Facilities.

O3 In commercial zoned areas, the number of driveways across   S3.1 Design of multi-tenanted developments in              The development has shared access driveways and
pedestrian footpaths is minimised.                             commercial zoned areas include shared driveways and        parking areas.
                                                               parking areas; AND


                                                                                   page 1

Page 82

Driveways and Carparking Code
Specific Outcome                                                 Acceptable Solutions/Probable Solutions                   Compliance

                                                                 S3.2 Driveways are located so they abut existing          Not applicable.
                                                                 driveways of adjoining development where practicable
                                                                 and reciprocal easements are created to reduce the
                                                                 sealed driveway width.

O4 Vehicular access does not adversely impact on the capacity,   S4.1 Footpath and kerb crossings are located clear of     Refer to Civil Engineering Report.
operations and maintenance of the existing infrastructure;       existing stormwater inlet structures, water and
                                                                 sewerage infrastructure fittings, any other exiting
                                                                 utility infrastructure, existing landscaping and
                                                                 vegetation.

O5 Vehicular access does not adversely impact on the integrity   S5.1 No solution provided                                 Refer to Civil Engineering Report.
of existing landscaping or native vegetation.

O6 Driveway run-off is filtered prior to leaving the premises.   S6.1 For—                                                 Refer to Civil Engineering Report.
                                                                 a) Ancillary dwelling unit, Multiple housing Types 1
                                                                 or 2 if less than 5 carparking spaces, Visitor
                                                                 accommodation Type 1 and Home-based business
                                                                 Type 3—the driveway is formed to drain to landscaped
                                                                 areas; and
                                                                 b) for other uses—grease and oil arrestors or
                                                                 stormwater quality improvement devices are
                                                                 incorporated into the design to treat run-off prior to
                                                                 run-off exiting from the premises.
14.114 Carpark design and layout

O7 Sufficient carparking is provided to accommodate the          S7.1 The number of parking and loading bays is not less   The number of parking and loading bays meets or
number and type of vehicles likely to be generated by the        than the minimum number specified in Table 14-51          exceeds the minimum required in Table 14-51.
development having regard to the specifics of the use            Vehicle Parking Requirements;
including—
a) the type and intensity of land use;
b) any existing parking available on the site;
c) hours of operation;
d) likely numbers of users;

                                                                                    page 2

Page 83

Driveways and Carparking Code
Specific Outcome                                                    Acceptable Solutions/Probable Solutions                     Compliance

e) the peak parking demand periods of uses on the site; and
f) the availability of alternative carparking.

O8 The layout of the development provides adequate, clearly         S8.1 Parking bays, manoeuvring areas, queuing areas,        Parking bays, manoeuvring areas, queuing areas,
defined and easily accessible—                                      loading, setdown and pickup areas and driveways are         loading, set-down and pickup areas are designed in
a) on-site vehicle parking and manoeuvring areas; and               designed to the standards set out in Sections 2 and 3 of    accordance with AS2890 Part 1 and Part 2.
                                                                    Australian Standard AS 2890.1 Parking Facilities (Part 1:
b) loading and manoeuvring areas for delivery and service           Off-street Carparking) and AS 2890.2 – Off-street
vehicles                                                            Parking (Part 2: Commercial Vehicles); AND
                                                                    S8.2 The number of loading bays is not less than the        Appropriate loading areas are proposed.
                                                                    minimum number specified in Table 14-51.

O9 Parking areas are located where they will not unduly conflict    S9.1 Carparking areas are accessed from rear laneways       Car parking areas are accessed appropriately
with pedestrians and will not dominate the streetscape.             where practicable.

O10 Provision is made for a reasonable number of on site            S10.1 Carparking spaces are provided for people with        Carparking spaces are provided for people with
carparking spaces identified and reserved for people with           disabilities at the rate specified in Section 2.4.5 of AS   disabilities in accordance with AS2890.1 and AS2890.6.
disabilities.                                                       2890.1 – Parking Facilities (Part 1: Off-street
                                                                    Carparking).


O11 Access and egress points do not impact on the safety and        S11.1 Vehicle manoeuvring areas are provided in             Vehicle manoeuvring areas are provided to ensure all
operations of the road system.                                      accordance with Section 3 of AS 2890.1 Parking              access and egress is in a forward gear.
                                                                    Facilities (Part 1: Off-street Carparking) so vehicles
                                                                    enter and leave the site in a forward gear.

O12 Parking areas are designed to -                                 S12.1 At locations where pedestrian and vehicle             Appropriate sight distance is provided at access
a) provide a progressive reduction in speed between the             conflicts are likely to occur –                             intersections within the development site.
external road and internal parking spaces;                          a) sight distances of at least 2.5 seconds of travel time
b) ensure lower speeds near areas of high pedestrian activity
through the use of appropriate road geometry or devices             at the designated speed are provided;
designed to limit speed; and                                        b) splayed corners on structures are incorporated;
c) maintain sight distances which are appropriate for the likely    c) landscaping is designed to allow clear views;
operating speeds in all areas of potential pedestrian/vehicle and   d) sign placement ensures that views are not impeded;
vehicle/vehicle conflict;

                                                                                         page 3

Page 84

Driveways and Carparking Code
Specific Outcome                                                 Acceptable Solutions/Probable Solutions                     Compliance

O13 A clearly defined pedestrian network is provided that –      S13.1 In large open car parks with greater than 200 car     No car park within the development site has in excess
a) is located in areas where people will choose to walk;         parking spaces, a pedestrian path between parking           of 200 spaces.
b) ensures that pedestrian movement through car parking areas    spaces is provided on every second aisle;
or structures are along aisles rather than across them;

O14 Provision is made for pedestrian and vehicular queues at     S14.1 No probable solution identified;                      Appropriate vehicle queuing areas have been provided.
conflict points;

O15 Parking areas are lit to provide security for night-time     S15.1 Lighting is provided in accordance with               Parking areas are to be appropriately lit at night time.
users.                                                           Australian Standard 1158.1:1997 - Road Lighting -
                                                                 Vehicular Traffic (Category V) Lighting - Performance
                                                                 Installation and Design Requirements

O16 In mixed use areas of Business centres residents do not      S16.1 Resident carparking is limited to one space per       Not applicable.
compete with customers for carparking spaces.                    dwelling unit or accommodation unit. AND

                                                                 S16.2 Resident carparking is not located in the road        Not applicable.
                                                                 reserve or between the residential or business building
                                                                 and the principal street frontage.

O17 Car parking areas are landscaped to—                         No solution provided                                        Car parking areas are appropriately landscaped
a) provide shade;
b) maximise infiltration of stormwater run-off;
c) define parking areas;
d) reduce direct visibility of car parking areas from external
viewpoints;
e) soften views of hardstand areas
O18 Development with the potential to generate significant       No solution provided                                        Consideration has been given to transport and land use
traffic and parking impacts gives appropriate consideration to                                                               issues.
transport and land use issues23.

Motor Cycles & Motor Scooters                                    S19.1 For Commercial businesses, Entertainment &            No designated motor cycle spaces have been provided.
O19 Designated Motor cycle or motor scooter parking spaces       dining business, Industrial business Types 1 and 2,         However, motorcycle users will be able to use standard
reduce the reliance on cars.                                     Retail business Types 2, 4, 5, 6 and 7, Education Types 1   car parking spaces.
                                                                 and 2, Open Space, Wellbeing Uses and Transport

                                                                                     page 4

Page 85

Driveways and Carparking Code
Specific Outcome                                               Acceptable Solutions/Probable Solutions                   Compliance

                                                               Types 1, 2, 3 and 4 motor cycle parking spaces accord
                                                               with Planning Scheme Policy PSP26 Motor Cycle &
                                                               Motor Scooter Parking

O20 Carparks are designed to ensure run-off is treated to      S20.1 Grease and oil arrestors or stormwater quality      Refer to Civil Engineering Report.
remove pollutants prior to leaving the premises.               improvement devices are incorporated into the design
                                                               to treat run-off prior to it leaving the premises.
O21 Carparking areas are designed to ensure drainage without   No solution provided                                      Refer to Civil Engineering Report.
the use of pumps or other electrical apparatus

O22 Site layout and building design provides for soft          S22.1 Below ground components of buildings,               Not applicable.
landscaping to be established.                                 including car parks, do not extend beyond the above
                                                               ground footprint to allow for the provision of
                                                               landscaping, particularly within building setbacks.

Education Types 1, 2 or 3
O23 Carparking and setdown areas are designed and located to   S23.1 Paved setdown areas are provided within the         Not applicable.
facilitate their safe and efficient use.                       site; AND
                                                               S23.2 For a minimum of 50% of carparking spaces,          Not applicable.
                                                               pedestrian access to buildings is not across or through
                                                               driveways, carparks, setdown or manoeuvring areas;
                                                               AND
                                                               S23.3 Carparking and setdown areas are visible from       Not applicable.
                                                               off-site.




                                                                                   page 5

Page 86

 MYALL STREET, COOROY

Transport, Roads and Drainage Code
Specific Outcomes                                             Acceptable Solutions/Probable Solutions                                        Compliance

14.145 Strategic Transport Network
O1 Traffic generation from the development is considered in   S1.1 Where the development leads to the need to increase transport
a localised and a Shire wide context to ensure that—          infrastructure in the Shire, the development contributes to the
                                                              transport network in accordance with the requirements of the                   A Traffic Impact Assessment report has been
a) the transport network has the capacity to safely and       applicable infrastructure charging instrument and the Priority                 prepared which shows that the transport
efficiently accommodate projected movements; and/or           Infrastructure Plan in Part 15; and where developments requires                network has sufficient capacity to
b) the development includes measures to upgrade the           infrastructure not included in the priority infrastructure plan, the           accommodate the anticipated future traffic
transport network to meet the imposed demands.                development upgrades the infrastructure at no cost to Council.
                                                                                                                                             movements.
                                                              Advisory note
                                                              Council may for some development require the preparation of a
                                                              Transport Impact Assessment Report. Planning Scheme Policy PSP1
                                                              details matters to be addressed in the Report.

                                                              S2.1 Road planning and development design facilitates as many                  The development is not expected to generate
O2 The street network has high street connectivity, both      pedestrian and cycle movements as possible and provides for future             significant demand for pedestrian and cycle
within the development and to the surrounding local area.     connectivity and integration with adjoining sites; AND                         movements.

                                                              S2.2 Arterial and sub-arterial roads are designed so they can operate          Not applicable
                                                              with high volumes of traffic during peak times;
                                                              AND
                                                              S2.3 Collector and local streets are provided to support short trips for       Not applicable
                                                              local traffic moving in and between neighbourhoods. Local traffic is
                                                              channelled towards collector streets to ensure that traffic volumes on
                                                              local street are kept low; AND
                                                              S2.4 Collector and local streets are designed to discourage through            Not applicable
                                                              traffic; AND
                                                              S2.5 A collector street is provided parallel to arterials particularly where   Not applicable
                                                              they pass through town centres; AND
                                                              S2.6 Appropriate width of road and verge is provided to allow streets to       Not applicable
                                                              perform their designated functions in the street network; AND



                                                                                         page 1

Page 87

Transport, Roads and Drainage Code
Specific Outcomes                                            Acceptable Solutions/Probable Solutions                                      Compliance

                                                             S2.7 A network of local streets focused towards an activity centre or        Not applicable
                                                             school is provided for safe and efficient pedestrian and bike access to
                                                             the school, safe conditions for school buses, setdown facilities, with on-
                                                             site parking where practical; AND
                                                             S2.8 Passive surveillance is maximised by designing streets to enable        Not applicable
                                                             development to front all streets and roads, including arterials; AND
                                                             S2.9 Streets near Public Passenger Transport facilities are orientated to    Not applicable
                                                             optimise the walkable catchments within 800 metres walking distance;
                                                             AND
                                                             S2.10 The street network has no more than 15 percent of lots fronting        Not applicable
                                                             cul-de-sacs. The maximum cul-de-sac length is 120 m; AND

                                                             S2.11 Street stubs to adjacent future development areas are provided at      Not applicable
                                                             spacings of 200 m or closer to enable future street connections to be
                                                             made; AND



                                                             S2.12 Street block lengths are not more than 240 m long, and                 Not applicable
                                                             predominantly around 150-180 m long. Street block lengths are
                                                             generally shorter closer to town and neighbourhood centres; AND
                                                             S2.13 Direct, safe and attractive pedestrian and cycle routes are            There are facilities provided within the
                                                             provided within and through the development and connect to bus               development site to facilitate safe pedestrian
                                                             stops.                                                                       movement.

                                                             S3.1 Higher density development is concentrated along public transport       Not applicable
O3 Development is designed –                                 Routes; AND
a) To encourage travel by community transport, walking and
                                                             S3.2 There is provision for bus routes through development sites; AND        Not applicable
cycling rather than by private car; and
b) To maximise accessibility via existing and planned        S3.3 Bus routes are located to maximise patronage catchment and to           Not applicable
community transport facilities                               consider personal safety, lighting and traffic management; AND




                                                                                       page 2

Page 88

Transport, Roads and Drainage Code
Specific Outcomes                    Acceptable Solutions/Probable Solutions                                      Compliance

                                     S3.4 At least 90 percent of all residents are located within 400 metres of   Not applicable
                                     an existing or planned bus route; AND




                                     S3.5 Pedestrian and cycle movement is provided within local streets to       Not applicable – the development is not
                                     and through development; AND                                                 expected to generate demand for pedestrian
                                                                                                                  and cycle movements.


                                     S3.6 Attractive and safe pedestrian and cycle connections are provided       Not applicable
                                     with shade trees, graded walking and cycle paths and lighting; AND
                                     S3.7 Buildings and pedestrian entrances are oriented to the street; AND      Not applicable

                                     S3.8 Pathways have ramps at all kerb corners for wheelchair and pram         Pathways within the development will provide
                                     access; AND                                                                  ramps to cater for wheelchair and pram
                                                                                                                  access.

                                     S3.9 Every development has convenient and prominent pedestrian               Access locations are convenient and
                                     entrances that cater for all pedestrians including older people, children    prominent.
                                     and the mobility and vision impaired;
                                     AND
                                     S3.10 Expanses of ground level blank walls along street frontages, and       Not applicable
                                     large driveways and entrances to carparks are avoided; AND
                                     S3.11 Bus routes are not be located away from activity centres; AND          Not applicable

                                     S3.12 Facilities for boarding and exiting community transport facilities     Not applicable
                                     are incorporated into developments; AND
                                     S3.13 Pedestrian and cycle routes within or adjacent to the development      Not applicable
                                     are overlooked by adjoining buildings, make use of views and attractive
                                     sights, have lighting and are signposted; AND


                                                               page 3

Page 89

Transport, Roads and Drainage Code
Specific Outcomes                                               Acceptable Solutions/Probable Solutions                                     Compliance



                                                                S3.14 Suitable car restraint measures are adopted within the                The nature of the development layout would
                                                                development such as lower speed limits or traffic calming                   ensure low vehicle speeds
                                                                measures to support greater pedestrian and cycle movement; AND


                                                                S3.15 Traffic management devices on potential bus routes are provided       Not applicable
                                                                in accordance with the Self-assessable code for undertaking road works
                                                                on local government roads, under the Transport Planning and
                                                                Coordination Regulation 2005; AND
                                                                S3.16 Streets identified as potential bus routes are—                       Not applicable
                                                                a) collector streets and sub-arterial/arterial roads which provide highly
                                                                accessible and relatively direct routes wherever practical;
                                                                b) those that provide for the shortest and most direct route for an
                                                                efficient public transport service; and
                                                                c) those that can efficiently service adjoining development areas.
                                                                No solution provided.                                                       Development access does not adversely
O4 Development access does not compromise the functions                                                                                     impact on the safety, capacity and operations
of particular roads as indicated in the road hierarchy, and                                                                                 of the road system.
does not adversely impact on the safety, capacity and
operations of the road system.



14.146 Pedestrian and Cycle Path Infrastructure


                                                                S5.1 Consideration is given to existing and future pathway linkages and     Not applicable – no pedestrian or cycle path
O5 Pedestrian and cycle path infrastructure is provided –       pathways link to the Local and Regional Cycle Network and to the            infrastructure is proposed.
a) to form an integrated component of the movement              Priority Infrastructure Plan in Part 15.
network and the open space system;
b) to encourage walking and cycling;
                                                                S5.2 Direct and accessible linkages are provided into the site.             The development has linkages to the
c) to add variety and visual interest;
d) to conserve street trees, vegetation and other significant                                                                               adjoining residential area to the north.
features;
                                                                S5.3 Pathway and landscape works are provided to a high standard to         Not applicable – no cycle paths are proposed

                                                                                          page 4

Page 90

Transport, Roads and Drainage Code
Specific Outcomes                                               Acceptable Solutions/Probable Solutions                                        Compliance

e) to allow equitable access to public areas and community      Council specifications and assessed for compliance with local                  within the development
facilities;                                                     government cycling facility design standards.
f) with adequate lighting where subject to high night time
usage;
                                                                S5.4 Pathways are provided to cater for shared use and cater for both          Not applicable
g) in locations where there is casual surveillance;
                                                                commuting and recreational usage and exceed minimum standards.
h) or widened at potential conflict points;
i) to incorporate—
i) street tree planting to enhance the streetscape;
ii) directional signage that is visible under all conditions.


                                                                S6.1 Pedestrian and cycle path infrastructure is designed and                  Not applicable
O6 Pedestrian and cycle path infrastructure is designed and     constructed –
constructed to –                                                a) in accordance with AUSTROADS Part 14 - Bicycles, Section 6;
a) provide a stable, smooth surface, including across           b) to comply with local government design standards.
driveways, sections and joins;                                  c) to have navigational signs in accordance with Council ‘Wayfinding’
b) be easily maintained;                                        signage specifications.
c) a width and longitudinal gradient to cater for projected     d) to incorporate –
usage, including nearby—                                        i) kerb ramps at all intersections and designated crossings;
i) high activity nodes;                                         ii) refuge islands on all roads with median strips;
ii) public transport;                                           iii) holding rails for cyclists at the intersection of trunk collector, sub-
iii) centres;                                                   arterial and arterial roads that are positioned in accordance with –
d) provide clear sight-lines for safe use;                      A. Australian Standard 1742.9: 2000 - Manual of Uniform Traffic Control
e) be free of any obstructions such as fences, signage and      Devices - Bicycle Facilities; and
bollards.                                                       B. AUSTROADS Part 14 - Bicycles - Section 9; and
                                                                C. AUSTROADS Part 13 – Pedestrians.

                                                                Advisory Note
                                                                All pathways are considered shared use pathways, which Cyclists can
                                                                legally use, unless bicycles are specifically prohibited through signs or
                                                                markings (such as in town centres).


Table 14-59 — Roads and drainage




                                                                                          page 5

Page 91

Transport, Roads and Drainage Code
Specific Outcomes                                              Acceptable Solutions/Probable Solutions                               Compliance

14.147 Road and drainage design and construction


                                                               S7.1 Road planning and design supports the hierarchy and functional   Refer to Civil Engineering Report.
O7 Roads and pedestrian and cycle paths are planned and        aspects identified in Sections 2 and 3 of PSP5 Engineering Design
designed to support the hierarchy and functional aspects       Standards – Roads, Drainage and Earthworks;
identified in Sections 2 and 3 of PSP5 Engineering Design      AND
Standards – Roads, Drainage and Earthworks and to ensure
that—
                                                               S7.2 Road and pathway planning and design is in accordance with, in   Refer to Civil Engineering Report.
a) design and alignment of the roads, intersections and all
                                                               order of precedence—
associated works—
                                                               a) Noosa Integrated Local Transport Plan;
i. provides a safe environment for all users;
                                                               b) Queensland Transport’s Shaping Up;
ii. is adequate for the design speed environment;
                                                               c) Queensland Design Code for Residential Streets;
iii. is adequate for predicted traffic volumes; and
                                                               d) AUSTROADS Guide to Traffic Engineering Practice;
iv. maintains the safe and efficient functioning of the road
                                                               e) Sections 2 and 3 of PSP5 Engineering Design Standards – Roads,
network without the use of traffic signals;
                                                               Drainage and Earthworks; or
v. is compatible with existing roads;
                                                               f) the Noosa Cycling and Walking Network Development Plan;
vi. is easily maintained by Council equipment; and
vii. where appropriate, has the ability to accommodate
                                                               OR
public transport services;
                                                               g) A combination of the principles in these documents.
b) road pavement surfaces—
i. are durable enough to carry estimated wheel loads of
                                                               AND
travelling and parked vehicles;
ii. provide for the safe passage of vehicles, pedestrians,     S7.3 On-road cycling treatment is utilised to provide safe and        Not applicable
cyclists, and discharge of stormwater run-off from             continuous movement of cyclists along a roadway, such as--
contributing catchments and the preservation of all weather    a) sealed shoulders;
access;                                                        b) wide kerbside lane;
c) kerb and channel—                                           c) exclusive or peak period bicycle lane;
i. controls vehicle movement by delineating the carriageway    d) advisory treatments such as Bicycle Awareness Zone;
for all users;                                                 e) shared parking / bicycle lane;
ii. conveys road pavement run-off to stormwater drainage in    f) contra flow bicycle lane; and
a manner that allows the road to be trafficable in Q100 ARI    g) bus/bicycle lane.
local rainfall events; and
d) verges and footpaths provide—




                                                                                        page 6

Page 92

Transport, Roads and Drainage Code
Specific Outcomes                                            Acceptable Solutions/Probable Solutions                                 Compliance

i. safe access for pedestrians and cyclists clear of         S7.4 The provision of bicycle lanes at intersections is generally in    Not applicable
obstructions;                                                accordance with AUSTROADS Part 14, section 5 and the Manual of
ii. an access area for vehicles onto properties;             Urban Traffic Control Devices (MUTCD) Part 9.
iii. a corridor allocated for services and utilities; and
iv. additional amenity for minor roads.




O8 Stormwater drainage infrastructure is planned, designed   S8.1 Stormwater drainage planning, design and construction is in        Refer to Civil Engineering Report.
and constructed to—                                          accordance with Section 4 of PSP5 Engineering Design Standards –
a) be accessible, cost effective and easily maintainable;    Roads, Drainage and Earthworks;
b) protect downstream capacity;                              AND
c) protect downstream water quality;
                                                             S8.2 As Constructed data is submitted in accordance with Section 6 of   Refer to Civil Engineering Report.
d) maximise on-site stormwater retention and retardation;
                                                             PSP5 Engineering Design Standards – Roads, Drainage and Earthworks;
and
                                                             AND
e) convey run-off to stormwater drainage in a manner that
allows roads to be trafficable in Q100 ARI local rainfall    S8.3 Stormwater drainage planning, design and construction is in        Refer to Civil Engineering Report.
events.                                                      accordance with the Queensland Urban Drainage Design Manual.


                                                             S9.1 Roads and stormwater drainage infrastructure is constructed in     Refer to Civil Engineering Report.
O9 Roads and stormwater drainage infrastructure is           accordance with—
constructed—                                                 a) Sections 2, 3 and 4 of PSP5 Engineering Design Standards – Roads,
a) in accordance with appropriate engineering standards;     Drainage and Earthworks;
and                                                          b) Queensland Design Code for Residential Streets;
b) to minimise adverse environmental impacts, including      c) AUSTROADS; or
from run-off and erosion.                                    d) A combination of the principles in these documents;
                                                             AND
                                                             S9.2 Erosion and sediment control measures are designed and             Refer to Civil Engineering Report.
                                                             implemented in accordance with the Institution of Engineers Australia

                                                                                       page 7

Page 93

Transport, Roads and Drainage Code
Specific Outcomes                                              Acceptable Solutions/Probable Solutions                                    Compliance

                                                               (Queensland Division) Soil Erosion and Sediment Control - Guidelines for
                                                               Queensland Construction Sites.
Environmental Protection                                       S10.1 Roads and stormwater drainage follow the edge of existing            Refer to Civil Engineering Report.
O10 Roads and stormwater drainage infrastructure are           disturbed areas,
located and aligned so as to—                                  or alternatively, these works are co-located within a combined utility
                                                               corridor;
a) minimise disturbance to native vegetation and/or other      AND
habitat areas;
b) protect and maintain wildlife corridor movements and the
safety of native fauna;
c) minimise changes to the hydrological regime, including
drainage patterns, run-off and water quality;
d) avoid crossing watercourses, drainage lines and wetlands,
but where such crossings are unavoidable, disturbed areas
are reinstated and revegetated on completion of works; and
e) minimise bulk earthworks.


                                                               S10.2 Roads avoid native vegetation and provide for fauna underpasses      Refer to Civil Engineering Report.
                                                               and associated fencing where appropriate;
                                                               AND
                                                               S10.3 Road infrastructure within or adjacent to native habitat             Refer to Civil Engineering Report.
                                                               incorporates fences which allow for protected wildlife movement and
                                                               controls unrestricted access of domestic cats and dogs;
                                                               AND
                                                               S10.4 Native vegetation is protected from clearing or construction         Refer to Civil Engineering Report.
                                                               activities by—
                                                               a) clearly marking vegetation to be retained with flagging tap;
                                                               b) installing protective fencing around the dripline of vegetation; and
                                                               c) ensuring stock piling, storage and vehicle parking occur outside the
                                                               areas of vegetation to be retained;

                                                               AND
                                                               S10.5 Low impact construction techniques are used around areas of          Refer to Civil Engineering Report.
                                                               vegetation to be retained to minimise interference with the vegetation.

                                                                                         page 8

Page 94

Transport, Roads and Drainage Code
Specific Outcomes                                               Acceptable Solutions/Probable Solutions                                       Compliance

                                                                No solution provided                                                          Refer to Civil Engineering Report.
O11 Roads and stormwater drainage infrastructure is proven
to be suitable for its use prior to Council accepting the
dedicated asset.


                                                                S12.1 The location, design and construction of stormwater drainage            Refer to Civil Engineering Report.
O12 Alignment of stormwater drainage infrastructure is to       structures is in accordance with Sections 4 and 5 of PSP5, Engineering
allow for easy access for the ongoing maintenance by            Design Standards - Roads, Drainage and Earthworks;
Council.                                                        AND


                                                                S12.2 Where infrastructure is located on private land an easement is          Refer to Civil Engineering Report.
                                                                dedicated over the infrastructure in accordance with Section 4 of PSP 5,
                                                                Engineering Design Standards – Roads, Drainage and Earthworks.


14.148 Frontage works


                                                                S13.1 The following infrastructure components already exist at the            Refer to Civil Engineering Report.
O13 Development is provided with external roadworks along       frontage of the site or are provided at the developer’s expense—
the full extent of the frontage of the site to an appropriate   a) full width sealed road;
standard having regard to the specified function of the road.   b) concrete kerb and channel where appropriate;
                                                                c) forming and grading to footpaths;
                                                                d) vehicular kerb and footpath crossings;
                                                                e) a constructed bikeway;
                                                                f) a constructed footpath;
                                                                g) a constructed carriageway;
                                                                h) required alterations to public utility mains, services or installations;
                                                                i) construction of any required alterations to public utility mains,
                                                                services or installations;
                                                                j) stormwater drainage works; and
                                                                k) installation of electrical conduits;

                                                                AND


                                                                S13.2 Road and drainage design and construction is in accordance with

                                                                                           page 9

Page 95

Transport, Roads and Drainage Code
Specific Outcomes                                                 Acceptable Solutions/Probable Solutions                                    Compliance

                                                                  Sections 3 and 4 of PSP5 Engineering Design Standards – Roads,
                                                                  Drainage and Earthworks.


14.149 Road and rail corridors


                                                                  S14.1 Noise sensitive uses including residential uses are separated by a   Refer to Acoustic Report.
O14 Noise sensitive uses including residential uses are not       minimum of—
subjected to high traffic noise levels from the major road        a) 40m from the property boundary of roads within the major road
network or rail corridors.                                        network; and
                                                                  b) 80m from the property boundary of rail corridors;

                                                                  OR
                                                                  S14.2 Development in the vicinity of road corridors meets the following
                                                                  external design criteria for roads in the major road network—
                                                                  a) 54dB(A)L          based on predicted traffic volumes ten years hence;
                                                                              10 (18hours)


                                                                  AND
                                                                  S14.3 Development in the vicinity of rail corridors meets the following
                                                                  external design level noise criteria—
                                                                  a) 65dB(a), assessed as the 24hour average equivalent continuous A-
                                                                  weighted sound pressure level; and
                                                                  b) 87dB(A), assessed as a single event maximum sound pressure level.
14.151 Alterations to services and utilities
O16 Any alterations or repairs to infrastructure as a result of   S16.1 Any alterations or repair to infrastructure as a result of the
the development are made at no cost to Council.                   development are completed at the developer’s expense.




                                                                                             page 10

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.