Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

MCU14/0056 - Attachment K -Traffic Impact Assessment

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

LANE SUMMARY
    Site: 2026 PM Post-Dev
Myall Street / Bruce Highway Ramps
13-082 Myall Street Cooroy
2026 PM Post-Dev
Stop (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average     Level of     95% Back of Queue         Lane      Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay      Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                  m                      m   %       %
 South: Myall Street (South)
 Lane 1              84     5.0    1335    0.063     100         11.9     LOS B            0.2           1.6     Full      500   0.0    0.0
 Approach            84     5.0            0.063                 11.9     LOS B            0.2           1.6

 North: Myall Street (North)
 Lane 1             476     5.0    1889    0.252     100          0.0     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2             135     5.0    1793    0.075     100          8.2     LOS A            0.0           0.0    Short       50   0.0    0.0
 Approach           611     5.0            0.252                  1.8         NA           0.0           0.0

 West: Bruce Highway Ramps
 Lane 1             522     5.0    1793    0.291     100          7.6     LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2              32     5.0     999    0.032     100        10.0      LOS B            0.1           0.6     Full      500   0.0    0.0
 Approach           554     5.0            0.291                  7.7     LOS A            0.1           0.6

 Intersection      1248     5.0            0.291                  5.1         NA           0.2           1.6


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 19 March 2014 1:36:53 PM           Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.20.4660                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Bruce Highway Ramps\Myall St - Bruce
Highway Ramps.sip6
8000122, ADAM PEKOL CONSULTING, PLUS / 1PC
Log in to download the original file

MCU14_0056 - Attachment K -Traffic Impact Assessment.pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.