Residential Use Code
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
Environmentally Sustainable Building Design
Hot Water Systems17
O3 S3.1 Complies with the Probable Solution
Hot water systems are installed and operated to All hot water systems installed are The development will be provided with efficient
support the efficient use of natural resources and a) solar systems; or hot water systems.
minimise consequent pollution such as greenhouse b) electric heat pump systems; or
gas emissions. c) natural gas or LPG systems; or
d) any combination of a), b) or c).
Water supply and conservation Not Applicable
O4 S4.1
On-site water storage is designed and operated to If in a designated rainwater tank area as identified The site is connected to reticulated water supply.
support the efficient use of water; in Map 1 of Schedule 8, residential uses that qualify
as class 1A or 1B structures under the Building
AND Code of Australia have a rainwater tank or tanks in
accordance with Schedule 8.
AND
O5 S5.1 Not Applicable
On-site water storage is adequate for Where not in a water service area a The site is connected to reticulated water supply.
occupants every day use and fire fighting rainwater tank of a minimum of 60,000 litres is
purposes. provided for each dwelling unit, with the
exception of Multiple Housing Type 1.
Erosion and sediment control
O6 S6.1 Complies with Specific Outcomes
Development does not cause erosion or result in No solution provided. The development will be undertaken so as to not
transport of sediments off-site. cause erosion or the transportation of sediments.
Advisory Note
Persons undertaking development, including building work,
are required under the Environmental Protection (Water)
Policy 1997 (EPP) to ensure that sediment and other material
including building waste, sawdust, concrete, cement or paint
are not deposited or released into a roadside gutter,
stormwater drain or waterway, or into a place where it could
reasonably be expected to move or be washed into a roadside
gutter, stormwater drain or waterway and are not washed from
the site. Council enforces the EPP and penalties may apply.
17 This does not apply to buildings which qualify as Class 1A or 1B structures under the Building code of Australia
Residential Use Code Page 2