                      Performance Bond
               3.     Security in the form of a cash bond or trading bank guarantee to the sum of $2,000 must be
                      submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
                      will be returned on performance of the conditions of approval less any costs incurred by
                      Council in respect of enforcing performance of this permit. Council reserves the right to call
                      upon the bond or guaranteed sum to effect compliance with conditions.
                      Landscaping
               4.     A minimum of 20% of the site must have soft landscaping.
               5.     Prior to the commencement of the use, the following landscaping requirements must be
                      provided:
                      a)      Landscaping must be provided at the south-west part of the site to soften the built form
                              to the street. This must be situated between the front boundary and the bin enclosure
                              area and be in accordance with proposed streetscape planting plans prepared by Annie
                              King – Landscape Noosa.
                      b)      Screening vegetation must be planted along the eastern boundary at a width of 2
                              metres (200mm pot size) in accordance with Council’s Planning Scheme Policy PSP3
                              Landscaping Plants and Guidelines.
                      c)      Screening vegetation must be planted along both the northern and southern
                              boundaries for the length of the extension/alterations, particularly the 3rd storey
                              component of the building.
                      d)      Vegetation must be planted so as the proposed wall face of the retaining/planter
                              structures are largely screened to the side and rear boundaries.
               6.     All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               7.     All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Fencing
               8.     Boundary fences must be no greater than 2 metres in height, unless approved by Council.
                      Stormwater Drainage
               9.     Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
               10.    All elements of the stormwater drainage system, both above and below ground, must be
                      wholly contained within the subject site.
                      Earthworks
               11.    The development must be undertaken in accordance with the recommendations contained
                      in section 4 of the Slope Stability Assessment – Project No.19003-001-Rev1 prepared by
                      Tectonic Geotechnical & Environmental Engineers dated 28 March 2019.
               12.    Certification must be submitted to Council from a qualified person* which certifies that the
                      development has been constructed in accordance with the recommendations contained in
                      section 4 of the Slope Stability Assessment – Project No.19003-001-Rev1 prepared by
                      Tectonic Geotechnical & Environmental Engineers dated 28 March 2019, and that the
                      development has a minimum factor of safety against landslip of 1.5 in the long term.
                      *(Refer to advisory Note)




                                                                                                         Page 3 of 6
Document Set ID: 22748391
Version: 5, Version Date: 03/01/2024

Used in these records

About this file

File size
159 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval DBW19 0005 05.pdf · 159 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.