Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 4 - Engineering Response

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Elise Wilton

From:                                          Steve Roberts <[email protected]>
Sent:                                          Monday, 28 November 2022 4:29 PM
To:                                            Elise Wilton
Cc:                                            brett hage; William Millroy
Subject:                                       A6682 - 96 Black Mountain Range Road RFI response
Attachments:                                   A6682-22 RAL RFI SET 28.11.2022.pdf

Follow Up Flag:                                Follow up
Flag Status:                                   Flagged


Good Afternoon Elise.

Please find attached a revised set of RAL plans in response to NC RFI item 6 and 7. Response is provided below;
     The driveways are located in the most suitable location for sight distance and safe stopping. The accesses
         are rural residential and not high traffic accesses. It is considered that generally people accessing a rural
         driveway know the property and random or frequent visitors are not expected. To alleviate councils
         concern of “driver confusion”, the driveways have been separated so they are not inter connected but
         remain in suitable positions for safe stopping the most critical aspect of rural access.
     Please refer to plan P05 which has been added to the drawing set. P05 identifies preliminary grading of the
         rural accesses, which identifies that the driveways are generally located on or close to natural surface and
         earthworks will be minimal.

Let me know if you need any further information.

Steve.

Regards,
Stephen Roberts
Director

PLEASE BE ADVISED ALTA PROJECTS WILL BE CLOSED FROM THE 21ST DECEMBER TO JANUARY 9TH FOR CHRISTMAS
FESTIVITIES




26 Memorial Ave, Cotton Tree QLD 4558
PO Box 559, Cotton Tree QLD 4558
Email: [email protected]
Web: www.alta.net.au
Ph: (07) 5475 4125
Mob. 0400575334
Fax: (07) 5479 1607

This email and any attached files may contain confidential and/or privileged information which is intended solely for the recipient. If you have received this
message in error please notify the sender immediately and delete all copies of this email. Views expressed in this message may not necessarily reflect the
views of ALTA Projects. ALTA Projects are not responsible for any virus damage caused by this email or its attachments. Whilst all care is taken ALTA
Projects does not accept any responsibility as to the accuracy of electronically supplied files, especially if used for site setout. Hard copy drawings shall be
deemed the only media with which ALTA Projects accepts responsibility.




                                                                                1
Log in to download the original file

Attachment 4 - Engineering Response.pdf · 853 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.