Original source · versioned page text
Attach G- Engineering Report
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
Original PDF page 109, section 1. The text section number identifies this passage in the reader.
Date: ________________ Location: _______________________ System Size: __________ TYPE: Cast-In-Place Precast Linear Personnel: ____________________________________________________ System Observations Media Months in Service: _________________________________________________________________ Oil and Grease in Forebay: ________________________________________________________________ Sediment Depth in Forebay: ________________________________________________________________ Sediment Depth on Vault Floor: ____________________________________________________________ Structural Damage: ______________________________________________________________________ ______________________________________________________________________________________ Estimated Flow from Drainage Pipes (if available): ______________________________________________ Cartridges Submerged? (Yes _____ No _____) How Deep? _____________________________________ StormFilter Minor Maintenance Activities (check off if done and give description) Remove Trash and Debris: _________________________________________________________________ Minor Structural Repairs: _________________________________________________________________ Drainage Area Report Excessive Oil and Grease Loading (Yes _____ No _____) Source: _________________________________ Sediment Accumulation on Pavement (Yes _____ No _____) Source: _____________________________ Erosion of Landscaped Areas (Yes _____ No _____) Source: _____________________________________ Items Needing Further Work: ______________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ Comments: ____________________________________________________________________________ Sample StormFilter Major Maintenance Inspection Data Sheet It may be desirable to conduct this inspection during a storm to observe the relative flow through the filter cartridges. If the submerged cartridges are severely plugged, large amounts of sediments should be present, very little flow will be discharging from the drainage pipes, and it is likely that the cartridges need to be replaced during major maintenance. ©2011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.