Preliminary Pipe Size Calculations
Date: 4/02/2016 Document No.: 15087-Pipe Size
By: MS Revision No.: Draft
Project No: 15087
PROJECT: Supermarket Development
ADDRESS: 3 Garnet Street Cooroy
CATCHMENT: External
Runoff Coefficient (C10) - Developed: 0.90 (QUDM Table 4.05.3 (a))
2
Catchment Area - Developed: 31000 m tc = 13 min.
Parameters
ARI 2yr 5yr 10yr 20yr 50yr 100yr
Rainfall Intensity mm/hr 110.0 136.0 151.0 171.0 199.0 219.0
Frequency Factor fy= 0.85 0.95 1.00 1.05 1.15 1.20
Developed C Cd= 0.77 0.86 0.90 0.95 1.00 1.00
Developed Flow l/s 724.6 1001.3 1170.3 1391.5 1713.6 1885.8
Diameter (m) 0.750
Radius (m) 0.375
Longitudinal = 33
Slope 1in….
Mannings n = 0.012 PIPE
Area = 0.442
Wetted = 2.357
Perimeter
Hydraulic = 0.188
Radius
Velocity = 4.752 m/s
No. Barrels = 1
Flow Q = 2.100 m³/s
2100 l/s
ARI 2yr 5yr 10yr 20yr 50yr 100yr
CAPACITY? OK OK OK OK OK OK
QUDM (5.12.7)
V = (R^2/3 * S^1/2)/n R = Hydraulic Radius
S = Friction Slope
n = Manning's roughness coefficient
Q = AV A = Area
V = Velocity
Pipe Drain, Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.