Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Attach G- Engineering Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 145

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 131, section 1. The text section number identifies this passage in the reader.

                                       3 Garnet Street Cooroy, QLD 4563
                                                       Transport, Roads and Drainage Code


Transport, Roads and Drainage Code
Specific Outcomes                               Acceptable Solutions/Probable Solutions                 Compliance



14.146 Pedestrian and Cycle Path
Infrastructure

                                                S5.1 Consideration is given to existing and future      Refer to Traffic Engineering
O5 Pedestrian and cycle path infrastructure     pathway linkages and pathways link to the Local and     Report prepared by others.
is provided –                                   Regional Cycle Network and to the Priority              Typical.
a) to form an integrated component of the       Infrastructure Plan in Part 15.
movement network and the open space
system;
                                                S5.2 Direct and accessible linkages are provided into
b) to encourage walking and cycling;
                                                the site.
c) to add variety and visual interest;
d) to conserve street trees, vegetation and
other significant features;                     S5.3 Pathway and landscape works are provided to a
e) to allow equitable access to public areas    high standard to Council specifications and assessed
and community facilities;                       for compliance with local government cycling facility
f) with adequate lighting where subject to      design standards.
high night time usage;
g) in locations where there is casual           S5.4 Pathways are provided to cater for shared use
surveillance;                                   and cater for both commuting and recreational
h) or widened at potential conflict points;     usage and exceed minimum standards.
i) to incorporate—
i) street tree planting to enhance the
streetscape;
ii) directional signage that is visible under
all conditions.

                                                S6.1 Pedestrian and cycle path infrastructure is        Refer to Traffic Engineering
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.